2024年3月21日发(作者:鼓舞造句)
Santak Metal Manufacturing(WUXI) CO.,LTD
三达精密五金制造(无锡)有限公司
SUPPLIER RATING SUMMARY SCORECARD
Dept. : QA
QUARTER
:
(DD/
MM/
TO
:
(DD/MM/YY)
SUPPLIER
:
COMMODI
TY
:
SCORE
:
( A )
(45
Points)
(25
Points)
(30
Points)
QUALITY SECTION
:
( B )+
ENGINEERING SECTION
:
( C )
BUSINESS SECTION
PRICING INDEX
:
( D )
FINAL
SCORE
:
OUTS
TANDI
GOOD
ACCE
PTABL
UNAC
CEPT
If
(Note:
Engineeri
(A+C(D))
/ 75
90% - 100%
70% - 89%
60% - 69%
0% - 59%
-
-
-
-
COMMENTS
:
RATED BY
:
(SIGN
ATUR
(DAT
E)
(PUR
CHA
(DAT
E)
(SIGNATURE
)
(DATE)
(SQE)
(DATE)
FM-SQ-
016-A
Santak Metal Manufacturing(WUXI) CO.,LTD
三达精密五金制造(无锡)有限公司
SUPPLIER PERFORMANCE RATING SCORECARD
CY :
Dept : QA
QUALITY SECTION (45 points)
MAX
SCORE
QUARTERLY RATING
1st Qtr2nd Qtr3rd Qtr4th Qtr
COMMENTS
Fully meet requirements
Meet requirements - >90% implementation
Need improvement - >70% implementation
Significant deficiency - >50% implementation
Not acceptable - <50% implementation
Requirements
(a) Process is fully documented on PMP for all supplier product lines.
(b) Practice is consistent with the documented PMP.
(c) Process and reaction plan in place.
(d) Demonstrate consistent discipline in updating PMP.
(e) SPCR notification is ud for all process change. Process change
is initiated only upon customer's approval.
5
5
4
3
2
0
Fully meet requirements
Meet requirements - >90% implementation
Need improvement - >70% implementation
Significant deficiency - >50% implementation
Not acceptable - <50% implementation
Requirements
(a) All factory process are covered by a well-documented SPC system.
(b) The u of the SPC is effective.
(c) Internal controls/monitoring to ensure compliance to Santak'
requirements for performance, cleanliness and reliability.
(d) Proper procedure in controlling incoming material and sub-suppliers.
5
5
4
3
2
0
Fully meet requirements
Meet requirements - >90% implementation
Need improvement - >70% implementation
Significant deficiency - >50% implementation
Not acceptable - <50% implementation
Requirements
(a) Shares responsibility of all failed parts.
(b) Advis Santak of potential problem.
(c) Committed to " Fit-For-U " concept.
5
5
4
3
2
0
Fully meet requirements
Meet requirements - >90% implementation
Need improvement - >70% implementation
Significant deficiency - >50% implementation
Not acceptable - <50% implementation
Requirements
(a) Provide weekly/monthly data package as per SQE's requirements.
(including data on Cpk's, SPC, ORT, LAR & DPPM performance)
5
5
4
3
2
0
FM-SQ-016-A
Santak Metal Manufacturing(WUXI) CO.,LTD
三达精密五金制造(无锡)有限公司
SUPPLIER PERFORMANCE RATING SCORECARD
CY :
Dept : QA
QUALITY SECTION (45 points)
MAX
SCORE
QUARTERLY RATING
1st Qtr2nd Qtr3rd Qtr4th Qtr
COMMENTS
Fully meet requirements
Meet requirements - >90% implementation
Need improvement - >70% implementation
Significant deficiency - >50% implementation
Not acceptable - <50% implementation
Requirements
(a) Provide regular and responsive improvement plan on LAR, DPPM
(Supplier Internal and Santak IQA) & defect pareto chart.
(b) All critical parameter achieve CPK goal (per individual program's goal)
(c) Has well defined goals and continuous improvement plans on Cpk,
Dppm and LAR.
(d) Trends show continuous improvement.
(e) Continually keeps them updated and communicated to Santak
5
5
4
3
2
0
DPPM =< 1000
DPPM =< 2000
DPPM =< 3000
DPPM =< 4000
DPPM =< 5000
DPPM > 5000
5
5
4
3
2
1
0
No RTV/UAI/Sort/Rework (100% LAR)
>= 98% LAR
>= 95% LAR
>= 92% LAR
>= 90% LAR
< 90% LAR
5
5
4
3
2
1
0
SC
A
No SCAR issued
SCAR can be replied in time
SCAR can not be replied timely
SCAR is rejected
5
5
4
2
0
S
C
No SCAR issued
The action is very good and the same problem will not happen in the
future coming goods
The action can lasts for period time but the same problem will happen
again in the future coming goods
The same defective parts will occur repeatly
The same defective parts will be much more than before
5
5
4
3
2
0
Total:
FM-SQ-016-A
Santak Metal Manufacturing(WUXI) CO.,LTD
三达精密五金制造(无锡)有限公司
SUPPLIER PERFORMANCE RATING SCORECARD
CY :
Dept : Engineer
Te
ch
ENGINEERING SECTION (25 points)
MAX
SCORE
QUARTERLY RATING
1st Qtr2nd Qtr3rd Qtr4th Qtr
COMMENTS
5
ECN updated in time and improvement =100% implementation
ECN updated improvement ≥90% implementation
ECN updated improvement ≥80% implementation
ECN updated improvement ≥70% implementation
ECN updated improvement ≥50% implementation
ECN updated improvement ≤50% implementation
5
4
3
2
1
0
De
sig
Design & Technical Support overtop customer's requirement
Design & Technical Support ≥90% customer's requirement
Design & Technical Support ≥80% customer's requirement
Design & Technical Support ≥70% customer's requirement
Design & Technical Support ≥50% customer's requirement
Design & Technical Support ≤50% customer's requirement
5
5
4
3
2
1
0
De
sig
Design Time to Market in time
5
5
4
3
2
1
0
Design Time to Marke lated date≥1 days
Design Time to Marke lated date≥3 days
Design Time to Marke lated date≥5 days
Design Time to Marke lated date≥7 days
Design Time to Marke lated date≥10 days
Co
m
Communicatiom respons in time
Communicatiom respons lated time ≥1 days
Communicatiom respons lated time ≥3 days
Communicatiom respons lated time ≥3 days
Communicatiom respons lated time ≥5 days
No Communicatiom respons
5
5
4
3
2
1
0
Pr
od
Product Improvement Activities is very good
Product Improvement Activities can last for a long time,but the same
rejected will happen again
Product Improvement Activities can last for a short time,but the same
rejected will happen again
Product Improvement Activities is not uful
No Product Improvement Activities
Reject to t down Product Improvement Activities
5
5
4
3
2
1
0
Total:
0
FM-SQ-016-A
Santak Metal Manufacturing(WUXI) CO.,LTD
三达精密五金制造(无锡)有限公司
SUPPLIER PERFORMANCE RATING SCORECARD
CY :
Dept : Purcha
MAX
SCORE
QUARTERLY RATING
1st Qtr2nd Qtr3rd Qtr4th Qtr
M
at
Outstanding
Good
Average
BUSINESS SECTION (30 points)
COMMENTS
5
5
4
3
0
Below Average
O
n
Between>=96% and<100%
Between >=92% and <96%
Between >=84% and <92%
Between >=76% and <84%
Below 76%
5
5
4
3
2
0
Pa
>65 days
60 - 65 days
51 - 59 days
45 - 50 days
Below 45 days
5
5
4
3
2
0
C
o
Just-In-Time & E-MAIL
Any one of the programs met
None
5
5
3
0
Se
Outstanding
Good
Average
Below Average
5
5
4
3
0
Pr
Maximum
Every 1% favourable than target
Equal target cost
Every 1% unfavourable than target
Every 5% unfavourable than target
>= 10% unfavourable than target
5
5
4
3
2
1
0
Total
FM-SQ-016-A
本文发布于:2024-03-21 11:08:41,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/zhishi/a/1710990521167941.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
本文word下载地址:供应商等级评分表.doc
本文 PDF 下载地址:供应商等级评分表.pdf
留言与评论(共有 0 条评论) |