Date:
Metalmin order:
Buyer:
Seller:
This contract is made by and between the buyer and ller whereby the buyer agrees to buy and
the ller agrees to ll the under mentioned goods on terms and conditions stated below:
1、 DESCRIPTION OF THE GOODS
Chrome Ore complying with the following specifications:
Contract
Ore type Guaranteed
Cr2O3
SiO2
Al2O3
MgO
Cr/Fe
P
S
Size:-1mm
ORIGIN:
2、 QUANTITY
3、 PACKING
4、 PRICE
5、 DELIVERY/SHIPMENT
5.1 CIF Lianyungang Port, China All destination charges for Buyer’s account.
5.2 Partial Shipment to be allowed and Transshipment to be allowed.
5.3 Shipment to be effected in Container chartered by the Seller and due to call at any Port of
Southern Africa for loading of material during September 2010. Latest shipment date in L/C
the 10 October, 2010.
5.4 Shipment Advice: The ller shall advi the buyer within 5 working days after completion
of loading giving full details of the Shipment including name of vesl, contract No., name
th
of commodity, approximate gross weight/L date and approximate invoice value.
5.5 Each sale is only deemed to take place on the buyer’s receipt of the relevant Bill of Landing
5.6 Shipment may be delayed on account of late opening of L/C.
6、 PAYMENT
6.1 By Usuance Letter of Credit (L/C) payable at 90 days from Bill of Landing and available by
negotiation with any bank covering 100% of the value of the shipment .The L/C to be
issued by any one of top 5 banks in China as listed below.
The Letter of Credit to be issued out immediately, and opened in a format acceptable to the
Seller.
6.2 Documents required for 98% Provisional Payment:
· 2 originals plus 3 copies of commercial invoice, bad on
· 2 originals plus 3 copies of packing list
· Full t of 3/3 Clean shipped On Board Ocean Bill of Landing, marked” freight prepaid”,
blank endord and notify party
· 1 originals plus 2 copies of Certificate of Weight issued by
· 1 originals plus 2 copies of Certificate of Quality issued by
· 1 originals plus 1 copies of Certificate of Origin issued by the Beneficiary
· 1 originals plus 2 copies of Certificate of insurance
· Documents Prior to L/C opening to be acceptable
· Late Prentation of Document to be acceptable
6.3 The balance of outstanding will be paid on the basis of the final results and shall be paid
through the sane L/C against the final invoice drawn according to final quality and
quantity results the final invoice should be confirmed by the buyer prior to delivery to the
bank
Documents required for balance payment:
·Final Invoice
·Certificate of Quality issued by CIQ in 1 photocopy
·Certificate of Weight issued by CIQ in 1 photocopy
6.4 Buyer needs to submit discharge date within 7 working days after vesl’s arrival. If buyer
cannot supply CIQ certificate of quality and weight at discharging port within 60 days
after completion of discharging at discharge port, the ller has the right to prent the
certificate copy of Quality and Weight issued by for final payment
6.5 In ca of any claim arising for any such reason, the buyer will notify the ller within 14
days from discharge date-with all the required paper work evidencing any charges or
loss incurred. The ller will have 7 days to gather all the required information together
an if claim is found to be plausible and acceptable; the customer will be reimburd
accordingly.
6.6 All bank charges outside country of issuance will be for the account of the ller
7、 INSURANCE
Marine Insurance shall be taken by the ller for the commodity of loading on board vesl
form port up to discharge port, for 100% of invoice value covering all risk, war risk and SRCC
as per institute cargo clau at llers expen—payable in China in U.S Dollars and the
insurance certificate shall be furnished along with other shipping documents.
8. SAMPLING&ANALYSIS
8.1 At the loading port, the independent inspection agency______________, at llers option,
___________shall determine the quality and weight etc as per international standards,
moisture will be deducted from the B/L weight. Certificate of Quality and Certificate of
Weight issued by this independent inspection agency shall form the basis for raising the
Invoice for 98% payment upon the Buyer. The cost of such weighing, sampling and analysis
shall be for Sellers’ account.
8.2 At the discharge port, CIQ shall carry out sampling. A certificate of Quality issued by CIQ
bad on the sampling and analysis at the discharge port and a Certificate of Weight issued
by CIQ at the discharge port shall be final and form the basis for the balance value of the
cargo for ttlement. The cost of such weight, sampling and analysis shall be at Buyer’s
account.
8.3 The Buyer will make available a copy of the CIQ report including analysis and weight, to the
Seller within 60 days after completion of discharging at discharge port.
The Seller rerves the right to appoint, at their cost, an independent inspection agency to
attend supervision of discharge of the cargo at the discharge port. Buyers to extend all
necessary cooperation for such analysis.
9. FORCE MAJEURE
Should any of the parties hereto be prevented from performing this contract due to any Force
Majeure event, the prevented partly hereto shall not be liable to the other party for any
damages, increa of costs or loss suffered by the other party which was cad by the
prevented party’s failure or delay in performing its obligations hereunder due to such Force
Majeure event. However, the prevented party shall notify immediately the other party by fax
or e-mail and deliver to the other party by registered mail a certificate issued by government
authorities or Chamber of Commerce as evidence thereof, If the shipment id delayed for a
period in excess of 31 days due to such Force Majeure event, the buyer shall have the right to
terminate this contract without bearing any abilities.
10. NOTICES
10.1 Any notice to be given for the purpos of this agreement shall either be delivered
personally or nt by first class recorded delivery post, courier, telefax (facsimile transfer)
or email.
10.2 The address for rvice on the parties shall be their respective address and facsimile
numbers as t out in the description of the parties above.
10.3 A notice shall be deemed to have been rved as follows:
10.3.1 If personally delivered at the time of delivery.
10.3.2 If nt by recorded delivery post at the expiration of 14 days after the same was
delivered into the custody of the postal authorities.
10.3.3 If nt by courier at the expiration of 7days after the same was delivered into the
custody of the postal authorities.
本文发布于:2023-11-04 06:48:27,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/zhishi/a/1699051707205770.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
本文word下载地址:contract格式.doc
本文 PDF 下载地址:contract格式.pdf
留言与评论(共有 0 条评论) |