1 This is a fixed lump sum price contract bad on all the bidding documents included in the Bid Package.此报价是基于组成招标文件包的所有招标文件报价。坚持的说说2 Bidder must calculate the actual quantities bad on the&nb
沉井工程刃角下垫层及灌砂工程量计算的探讨摘要:根据有关沉井工程的技术规范载明的计算方法,结合施工的特点和经验,通过实例分析沉井工程刃角下垫层及灌砂工程量常规计算方法,以供同行参考。关键词:沉井、刃角、垫层、灌砂Abstract: according to the engineering specification stated open caisson, the computation metho
nieurs-Fede rati on Intern ati on ale Des Ing Conils1.1测量方法12.2Method of Measurement除非合同中另有规定 , 无论当地惯例如何 男人的占有欲:Except as otherwi stated in the Contract and notwithstandinglocal practice:(a)测量应该是测