8D报告模板-中英文

更新时间:2023-05-03 01:59:43 阅读: 评论:0

Complete 完整的(8D    Short Form简式的( D4, D5, D6 & D7 Only)
Steps 1 - 3 and estimated time for resolution must be completed within 12 hours
步骤1 - 3,预计解决时间必须在12小时内完成
Step 4 - 7 must be completed within 2 weeks, in ca of more than 2 weeks; detailed plan must be attached
步骤4 — 7必须在2周内完成如果超过2,必须附详细的计划
Date Issued发出日期
CAR Number CAR编号 
Recurrence of defect  欢迎光临英文 是否重复发生
Yes   -  No If yes: old CAR No.对应旧的CAR No。:
Issued To发放给:                         Supplier供应商:                  CAR Requestor 要求者:
Part Number产品型号:                 Part Des:           
Qty controlled检测数量        Qty。 Rejected不良数量
Defect Description缺陷描述:
Who:
What:
Why:
When:
Where:
How:
How Many:
Traceability Data (e.g. cast lot no。; delivery slip no.; rial number, colour dots,):
可追溯性数据(货柜号;送货单号;批次号;色彩点;)
Photo / Sketch图片/草图
Effects Estimation影响效果评估:
Request originated by要求来源于:
Customer Spill 客户处  Internal Inspections内部检查  Customer Satisfaction客户投诉
        Logistics物流 / Packaging包装    Other______________
CAR information nt to:
CAR信息发送到:   
Supplier Quality供应商质量            Process Quality制程质量
Customer Quality 客户质量            Production Dept生产部
  Technology Dept 技术部                Process Technology Dept过程工艺部
    Suppliers供应商                                Other采购部_____________
Cost Recovery will be requested是否需要成本补偿
Yes
No
( 1 )  Select a Team ( Must have "BUY—IN" and ability to solve problem ) :
确定团队必须有接受/认同和解决问题的能力)
Team Leader
团队组长
Supplier Quality
供应商质量
Manufact。 Engineering
制造工程师
Process Quality
过程质量
Process Engineering
工艺工程师
Customer Quality
客户质量
Manufacturing
生产部
Other
其他
( 2 ) Define & Describe the problem (Analyze the problem freq。, loc., effects, etc., and define desired solutions) :定义&描述问题(分析问题频率、地方、效果等并定义所需的解决方案)
Who:
What:
Why:
When:
Where:
How:
How Many:
Frequency of problem (ppm):   
问题的频率(PPM):
Reasons of non—detestability:
非检测的原因:
Estimation of conquences:
后果评估:
Extension to other Part Numbers/Lines/Plants:
扩展到其他零件编号、生产线、工厂:
( 3 ) Containment (Immediate actions required to eliminate defects at supplier, mfg., and customer locations)
围堵措施: (需要确认缺陷问题在供应商、生产线和客户处的数量)
VERIFY
查证
OK
NON
OK
Action / Notes / Identification of OK parts
行动、备注、识别好的部分
Supplier供应商处
Warehou库存品
WIP在制品
Customer客户处
Others
Temporary Countermeasureuntil the implementation of definitive corrective actions) : 临时对策(直到确定的纠正措施的实施)
Timing
Impact %
1)
( 4 ) A) Identify Root Cau applying cau effect analysis确定根本原因应用造成影响的分析
(4) B  Identify Root Cau with min.“3 why-why ”: 确定根本原因和最少有“3个为什么”
Material物料
NA
Why ?
Machine机器
NA
Why ?
Method方法
NA
Why ?
Man
NA
Why ?
Measurement测量:
NA
Why ?
Environment环境:
N/A
Why ?
4) C) Verify root Caus,  根本原因
the root caus are根本原因是:
( 5 ) Permanent Corrective Action: (Choo & Implement Corrective Action )
        纠正措施:(选择和实施纠正措施)
Timing
Impact %
( 6 ) Verification of Corrective Action (Resp。 Team) 纠正措施的验证:
Quality department 质量部门
Corrective action implemented  on (Date) ____ Pls e feasibility analysis report for long term action
Tracking period:  from week____to week ____
纠正措施实施日期) ____   请见上实现可行性分析报告长期行动跟踪期____星期到___星期
Documentation of Verification Evidence文档验证的证据:   
Test and Measure results测试和测量结果      Capability性能      Audit 审核   
Attribute Data属性数据          Fmea            Control  Plan 控制计划
Preventive Maintenance Instruc。 预防性维护的教诲        Other____________
Information nt to信息发送到 Supplier Quality供应商质量  Process Quality制程质量  Customer Quality 客户质量
Customer Quality 客户质量  Production Dept生产部  Technology Dept 技术部  Process Technology Dept过程工艺部    Suppliers供应商  Other_____________
( 7) Prevention预防: (Preventive action taken, to e this does not occur again预防行动确保不会再发生) (Resp. Team):
FMEA Updated FMEA更新              Yes  No    Date                  
Previous FMEA (以前FMEASeverity严重性____  Occurrence发生率____ Detection探测度____ RPN_____
Revid  FMEA (修改FMEASeverity严重性____  Occurrence发生率____ Detection探测度____ RPN_____
Control Plan Updated控制计划更新                      Yes  No    Date _______   
Procedures Updated  操作指导更新                        Yes  No    Date
Information  to other plants信息给其他工厂            Yes  No    Date _______
Information  to other Supplier 信息给其他供应商    Yes  No  Date _______
Other其他_____________________                      Yes  No    Date _______
Audit signature                                                    Audit Date
审核签名:                                                            审核日期:
( 8 ) Recognize team success  ( Acknowledge team and communicate results) :
确认团队成功(承认团队和沟通的结果)
This CAR will be clod, If there are no more than two concutive batches.
如果连续2批次无重复发生,这个CAR将会关闭           
1批次供货:
2批次供货:
Evaluation of Corrective Action矫正行动有效性评估(Resp。 Issuer) 
Acceptable可接受            Unacceptable不能接受
Remarks备注: _____
____________________________________________________________________________
Review Signature:___ ___________________________        Date:__ ____________
Communication to the Customer completed on (Date)向客户沟通完成日期 :__ _________
  Accepted可接受            Unaccepted不能接受
Corrective action implemented  starting from纠正措施实施开始日期  __________   
附件:

本文发布于:2023-05-03 01:59:43,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/93452.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:行动   问题   质量   措施
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图