C10-4DM(Manual_DM_ries)日本神钢振动控制器手册

更新时间:2023-08-12 09:04:36 阅读: 评论:0

1. Introduction                                  1
2. Safety Instructions                      2
3. Precautions for operation            5
4. Structure and Name of Part                  6
5. Installation                        7
6. Check and Adjustment of Resonance point      8
7. Trouble Shooting                              9
8. Readjustment                                10
9. Specifications                                11 10. Outline Drawing                            12  11. Guarantee
13
The version C (DM-**C) prartsfeeder drive unit has a connector for power supply .
Instruction Manual for Dual Motion Partsfeed er
Model DM-30C, -38C, -45C
Before operating your dual motion partsfeeder , you and/or any other operator shall read and follow the safety instructions carefully to operate the equipment correctly , properly and safely . Then the instructions save you from any accident and/or injury and/or, any damage and/or loss of your property . The safety instructions are classified by the degree of injury and damage such as “Danger”, “W arning”, “Caution” and “Request”.
■ Plea keep the instruction manual on file as any operator is able to read and refer to it.
■ When you transfer or rent the equipment to the other you are required to submit the instruction
manual, coming to the ur’s attention, along with the equipment. The ur shall operate the equipment correctly , properly and safely .
■ Tho Safety instructions do not necessarily cover all danger , accident and/or damage. Plea
always follow the safety instructions and act the safety first attitude.
● Do not u the equipment in an environment where inflammable gas exist. The equipment has
no explosion-proof structure and then the u should cau an explosion or a fire.
● The equipment must be installed firmly on a rigid ba to avoid an accidental injury by toppling
韩文歌曲down, falling and/or abnormal running of it.
● Do not sprinkle the equipment with thinner, organic solvent, water , oil and oil products. It may
网球精英
cau any injury by abnormal running, getting a shock and a fire.
● Cut off the power , first of all, with a safety disconnect switch supplied by you before wiring,
competitivenesscleaning and maintaining the equipment.时尚词汇
● Do not operate the equipment in any vacuum chamber .
-Plea surely read this instruction manual- 2. Safety Instructions .
● Do not operate the equipment over the specifications agreed upon. The operation over the
specifications must result in damage, malfunction and/or short lifetime of it.
● Do not climb up on and/or put something heavy on the equipment to avoid an accidental injury by
toppling and/or falling down, and/or damage and/or abnormal running of the equipment.
● Do not damage the power cable and wirings to the equipment, such as abrasion of coating and
over bending, tensioning, coiling down, loading heavy weight on and/or pinching wires. The damage of a cable caus leakage and/or mal-conduction, which leads to a fire, getting workers shocked and/or abnormal running of the equipment.
● Wire the equipment correctly and properly consulting this instruction manual. Any wrong wiring
leads to abnormal running and/or breakdown.
● Inspect and make sure the wiring before turning on the power .
● The ground line must be connected on the ground terminal in the controller . The equipment must
be operated with ground without fail.
● Do not connect or disconnect connecters while the power is turning on. Do not stress the connecter
carelessly otherwi workers should be injured or get shocked and the equipment must be damaged.
● Keep sufficient maintenance space around the equipment. Small space makes the maintenance
work difficult and poor maintenance must damage the equipment
● Install the equipment in a clean and dry room. It has no dust-tight structure.
● n the ca of carrying a equipment, lift it with its mounting ba or the stand on which the
equipment is installed. Do not pull and lift it with the power cable.
● Install the equipment on a horizontal rigid frame or stand. The mounting ba of the equipment
should be bolted on the frame. In the ca of a weak frame, vibration of the equipment may spread into it and
cau resonance of the frame. The resonance affects the vibration of the equipment being mal-functioned.
● If you provide a weak bowl on the equipment the work pieces must be jumping on the both end of
the bowl.
● The equipment must provide a genuine controller to the model.
-Continued-
英语本科毕业论文Warning
● Keep clearance around the equipment and avoid the bowl or drive unit to hit against any object.
Hitting against any object results insufficient stroke of the equipment and clattering noi.
● Do not get the surface of the bowl dirty with oil, moisture, dust etc. The dirty bowl cannot handle
work pieces.
● Stop running at once when you hear any clattering noi or humming of the equipment. Check
and remove the cau of the noi. Running without maintenance must cau vere and non-restored damage on the equipment.
● Any operator should wear safety shoes and work gloves to handle a equipment.
● Y ou have to pay attention and take safety measures such as enough allowance to the specifications
and the rating, and/or a fail-safe system, when you want to u the equipment in unspecified  environment and/or circumstance by the specifications agreed upon otherwi the u of the equipment may endanger any person or property .
● Where the equipment becomes out of order and/or disud, it should be an industrial waste subject
to local regulation.
● Install the equipment on a horizontal rigid frame or stand free from heat, dust, humidity ,
condensation or freezing.
● In ca the work pieces are charged or magnetized, poor feeding rate or miss-orientation will occur.
Look and analyze the troubled phenomenon exactly and take proper countermeasure.
● The bowl must be designed so that the moment of inertia about the center axe, along the conveying
direction, of the bowl must be symmetrical on the moving frame of the equipment.  Un-symmetry results insufficient stroke. Y ou have to pay attention to the length, weight, rigidity and moment of inertia of the bowl.
● Where you would manufacture and tool the bowl and attachments it would break the symmetry
about mass or moment of inertia
of the bowl.
The un-symmetry slows down
何凯文六级or fluctuate the conveying speed of work pieces. Y ou should attach small pieces of weight on the bowl to balance and symmetrize the mass and moment.
The product of SINFONIA TECHNOLOGY has been fully balanced and symmetrized in the shop.
Danger!
Caution!
A place subject to
large vibration
Hot and moist place Outdoors
Don’t  u the partsfeeder where inflammable gas exist.
It has no explosion proof structure and will cau an explosion and/or fire.
Don’t u the partsfeeder any place shown below . An electric leak, damage and/or deterioration of the partsfeeder should result.
3. Precautions for operation
Caution!
the bowl.
should result. Before making any weld on the bowl
Caution!
B.Before making any weld on the bowl connect Disconnect!
Bowl mounting center bolt
Upper movable frame Horizontal movable core Horizontal fixed core coil
Fixed frame
Isolation rubber Horizontal stroke nsor Lower movable frame Vertical fixed core coil
Distance piece Bowl is of circumferential mounting or center mounting depending upon the using conditions.
Vertical leaf spring
Vertical stroke nsor
Horizontal leaf spring
(circumferential mounting) Bowl mounting bolt
4 . Structure and Name of Part
5. Installation
6. Check and adjustment of the resonance point
7. Trouble shooting
If any abnormal movement is there plea check the following items and tho of the instruction manual for the exclusive controller. After that, you would still have a problem plea consult it our agent or Sinfonia T echnology.
Trouble Checking Item
A. Partsfeeder doesn't run
B. The stroke is not enough
C. The stroke is too much
D. The unit is vibrating but
work pieces stay in the bowl
E. Clattering metal sound
F. Sudden rever
rotating movement
1. Horizontal stroke must be null, check it with a stroke indicator
Vertical stroke must be null, t the horizontal stroke null
and check the vertical stroke.
If horizontal or vertical stroke might be null, plea check the items below:
1-1. Is the stroke tting on the controller suitable?
含有近反义词的成语
2-2. Is the wiring between the unit and the partsfeeder correct?
2-3. Is there any breakage on the power cable and/or the magnet coil?
Remove the power cable and test it with a universal tester
2 .Is the pha difference t on the controller suitable?
1. Is anything strike against the bowl or drive unit?
2. Is there any loo bolt, the bowl mounting bolt or isolator feet?
3. Is there anything dancing on the ba frame?
4. Do the cores with a narrow gap strike mutually?coshion
Or does anything come into the gap?
See page 10 to check the gap
5. Does the stroke nsor with a narrow gap strike against the leaf
See page 10 to check the gap
1. Check the resonance points, the horizontal and vertical.
See page 8 readjust them
指示提单1. T oo wide gap between the stroke nsor and the leaf spring,
so that the nsor cannot detect the leaf spring.
劝架的话
See page 10 to check the gap
2. In ca of vertical stroke is too much, readjust the resonance point
See page 8 to adjust it
1. Small stroke tting on the controller
2. T ransportation lock metal fittings are still t
3. Lack of rigidity of the installing ba or structure
4. T oo wide gap of magnet cores or small pulling power
See page 10 to check the gap
5. In ca of small vertical stroke, readjust the resonance point
See page 8 to adjust it
1. W rong tting and/or operation of the controller
2. W rong wiring between the partsfeeder and the controller
8. Readjustment

本文发布于:2023-08-12 09:04:36,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/194452.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:成语   网球   词汇   提单   含有
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图