Technical Proposal技术建议/工程建议书
(技术标)
Personnel人员
Equipment设备
Site Organization现场组织
geography怎么读Method Statement施工方案
Personnel人员
advice的用法Form PER – 1: Propod Personnel人员表-1被推荐人员
Bidder shall provide the details of the propod personnel and their experience records in the relevant Information Forms below for each candidate:
投标人应当提供被推荐人的详情和他们相关信息的经验记录,下表是每一个候选人的信息表:
:
*As listed in Section 6 (Employer’s Requirements).
*按第6部分(业主的要求)中的列表。
Form PER – 2: Resume of Propod Personnel 人事表—2:推荐人的简历:陨落星辰3
liwu
The Bidder shall provide all the information requested below:
投标人应当提供以下要求的所有信息:
Summarize professional experience in rever chronological order. Indicate particular technical and managerial experience relevant to the project.
(时间)倒序专业经历概要。表明相关项目的特殊技术和管理经验。
蓝图英文
汉堡包的英语怎么写
广告学考研Site Organization现场组织
heartwork
我心飞翔歌词(Note: Evaluation of the Bidder’s Site Organization will include an asssment of the Bidder’s capacity to mobilize key perso nnel for the Contract consistent with its proposal regarding work meth
grayveeods, scheduling, and material sourcing in sufficient detail and fully in accordance with the requirements stipulated in Section 6 (Employer’s Requirements)).(注:投标人的现场组织的评估应包括评估投标人调动那些与合同所拟定的相关工作方法相一致的关键人员的能力、计划调度能力、充分详细的材料源和完全按照第6节规定的要求(雇主的需求))
Method Statement施工方案