Client:
Conclusion
Report Date:
19-Set-2013 Inspection No.:
bothered
SQI-3220
PENDING(e remark 6-9)
INSPECTION REPORT
Inspector: CHEN
Page 1of 24
A. GENERAL
PRODUCT VIEW
SUMMARY SECTION
Inspection Date: 19-Set-2013 Report Issued Date:
19-Set-2013
PO No.: Item/Product No
Product Description: MULTI –FUNCTION COOKER Order Quantity:
3800 Available
咎由自取
Inspection Quantity 3800 Qty of export carton
1088
Vendor/Supplier: Factory Address: GUANG DONG ZHANJIANG Service Type: FINAL INSPECTION Sample Size:
200 PCS
Re-inspection: NA
B. INSPECTION RESULT SUMMARY
PROJECT TYPE
ACCEPTED
REJECTE
esky
D
PENDING NA REMARKS*
strikeoutPRODUCT SPECIFICATION
X QUANTITY
X
WORKMANSHIP/APPEARANCE/
FUNCTION
following是什么意思X See remark 7 ON-SITE TESTS
primeraX See remark 8 PACKING & ACCESSORIES
X
See remark 9
LABELING&MARKING X
SHIPPING MARKS (Section J)
OVERALL RESULT (Final decision from client)
Pending client review and approval * Refer to Section C for Remarks
关于风的作文
C. IMPORTANT REMARKS
1
The testing/measuring equipments applied during the inspection were all calibrated and within the period of
validity. Yes ( X ); No ( ).
2 Client approved sample / inspection spec available for inspection reference at time of inspection: Sample: Yes ( ); No ( X ) -Factory Sample: Yes ( ).Client’s Check list.: Yes ( ), Packing list no.(PI. no.): / ;Date: / No ( ).
3 All edges of master cartons / mail order boxes were aled with clear tapes as the attached photos. Yes ( X ); No ( )
4 Actual instruction manual was conformed to the product inside. Yes (x ); No ( ) NA( )
5 Shipping mark and Gift box details plea e photo attachment.
6. The factory cannot provide the CE report and CDF list
7* Found that 7% of the product into the tank cover side clearance after big (about 2-3 cm)
8* The cooking actual functionality found water aling ring
9* The order client requirement is each gift box to shrink film, but in fact, all products are not shrink film Photos To Follow:
includefile
Remark 7 Remark 8
Remark 9
D. QUANTITY
PO. No. Item No. Order Qty Order Sample Size
(PCS)
(PCS) Qty
(CTN)Packed
Not
Packed
(PCS)
CR MA MI
DTPI-1004/13 MCB-01 4352 1088
4352 0 200 0 7 12
E. INSPECTION CRITERIA
Inspection Standard: ANSI/ASQ Z1.4 SINGLE SAMPLING PLAN (formerly known as MIL-STD-105E)
General Inspection Level
Workmanship/ Visual/Function G-II
AQL - Critical Defectives: Expected hazard of
human life, health or environment
Not
Allowed
中国制造英文[ X ] Normal Inspection [ ] Reduced Inspection [ ] Tightened Inspection AQL - Major Defectives: Usability or life time
probably significant affected
1.5
Sample Size 200PCS AQL – Minor Defectives: Usability or life time
probably less or not affected
4.0
F. WORKMANSHIP/APPEARANCE/ FUNCTION DEFECTIVES
Description Critical Major Minor
Function indicator lights flashing0 1 0
Panel loo0 2 4
Plastic white0 1 2 Scratch mark on product 0 1 5
Dent mark on inner pot0 1 0
Residue in the crevice0 1 0 Black spots at bamboo steamer0 0 1
Total Found:0 7 12
Max Allowed0 7 14
Result:PASS PASS PASS Note: A Defective is defined as a unit of product that contains one or more defects. A Defect is defined as any non-conformance of the inspected unit of product with specified requirements. A single defect is taken into account per each defective
unit, in every ca the most rious defect exhibited by the individual sample being inspected regardless of the
characteristic.
Photo To Follow:
Function indicator lights flashing (1Major) Panel loo (2Major) Panel loo 2(Minor) Plastic white(1Major,2Minor)
Scratch mark (1Major) Scratch mark(1Minor)
Scratch mark on inner pot (1 Minor) Scratch (1Minor)
纱灯
Dent mark on inner pot (1Major) Residue in the crevice (1Major)
NA
Black spots at bamboo steamer (1Minor)
G. ON-SITE TESTS: