英文采购合同

更新时间:2023-08-09 04:17:23 阅读: 评论:0

hooker

Contract No.:XXX
Sales and Purcha ContractFOR
Mangane Ore
This contract is made and entered into onXX, Feb2008under terms and conditions as per the international chamber of commerce-600 (ICC UCP-600/2007 revision) by and between:
The Buyer:
Address:
Tel:
The Seller :
Address:呈现的意思
Tel:
Whereby ller agrees to ll to buyer and Buyer agrees to buy from ller Mangane Ore under following the terms and conditions stipulated below:
Article 1 Commodity
Concentrated  mangane Ore
Article 2 Specifications
Concentrated  Mangane Ore400的公办二本
Size: 0-5mm (90% min)
% Mn min.      40.0%
% Fe max.      15.0%
% Silica ( SiO2 ) max.      1.0%howo
% Aluminum ( Al ) max.      4.0%
% S max.      0.20%
% P max.      0.10%
Moisture max.      7%
十月英文
托福拼分Article 3 Quantity:
500 MT, partial shipment not allowed.
Article 4 Origin and Port of loading
4.1 Republic of ABC
4.2 Loading port:
Article 5 Packing/Deliveryfree loop歌词翻译
5.1 In50 kg sack
北京环球雅思5.2 Incontainer Shipment, more or less 20 tons.
Article 6  Shipment/Delivery
6.1 500MT(+/-5%)partial shipment not allowed
6.2 Shipment will be 90 days after signing of this contract and after the acceptance of the Letter of Credit by ller’s bank. L/C will be openedafter BuyerreceivingProforma Invoice from Sellerwith confirmation of the delivery schedule.
6.3 The Buyer has the right to appoint the independent surveyor or his reprentative to conduct the Pre-shipment Inspection and/or conduct the joint-inspection of the material with buyer for his own account.
thl
Article 7 Contracted Price and Values
Price:Mn: 48% and above - USD0.00/%/DMTCFRCY Port, China
        40% - 47.9%  - USD 0.00 /%/DMTCFRCY Port, China
The Mn content will be average of the joint-inspection testing result at loading port.
Article 8 Payment
8.1 Payment shall be effected in full by an irrevocable Letter of Credit, which will be opened by 1stclass bank in Hong Kong or Singapore, 100% at sight upon prentation of shipping documents.
A. Seller’s Banking Details:
Bank Name        :                               
Bank Address    :   
Account Name    : 
S.W.I.F.T. CODE SWIFT    :
B. Buyer’s bank issues L/C to the Seller's bank via S.W.I.F.T. wire transfer.
Buyer’s Banking Details:
Bank Name                : (will be advid)
Bank Address    :                                     
Account Name:   
S.W.I.F.T. Address SWIFT  : 
Article 10 Inspection of Analysis & Weight
The shipmentinspection and analysis shall be done byCCICappointed by the Seller and one independent surveyor (i.e.: SGS or Geo-Chem, etc) appointed by the buyeras agreed by both parties at site before loading to container. While final weightand qualitydetermination shall be done atloadingportby the above joint-survey.Moisture content shall be deducted from the total weight shipped.
Article 11 Documents
Seller shall prent the following documents to the buyer:
A.    Signed Commercial Invoice for 100% of the total cargo value indicating, quantity, unit price and the total Amount of Value of the delivered commodity , 1 original and 3 copies.
B.    Certificates of quantity, quality and weight issued byCCICand one independent surveyor appointed by the buyer.
正铲挖土机C.  Certificate of Origin issued by ABC Department Of Trade or concerned Government authorities, I original and 2 copies.
D.  Weight List, showing total weight , 1 original and 3 copies.
E.    Bill of Lading, 3 original copies and 3 non-negotiable copies.
Article 12 Force Majeure
The Seller shall not be responsible for the delay of shipment or non-delivery of the goods due to Force Majeureunder UCP 600. The ller shall advi the buyer immediately of th
e occurrence mentioned above and within 3 days thereafter the ller shall nd a notice by courier to the buyer of their acceptance of a certificate of the accident issued by the local chamber of commerce under who jurisdiction the accident occurs as evidence thereof. Under such circumstances the ller , however, are still under obligation to take all necessary measures to hasten the delivery of the goods. In ca the accident lasts for more than 60 days the buyer shall have the right to cancel the Contract.
Article 13 Arbitration
All disputes arising out of or in connection with this Contract shall be finally resolved by arbitration in accordance with the Rules of Arbitration of the International Chamber of Commerce (UCP-600/2007 or Uniform Customs and Practice for Documentary Credits) by one or more arbitrators appointed in accordance with the said rules. The arbitration shall be conducted in ABCbythe English language.
Buyer                                                                Seller
(Authorized signature/al)                            (Authorized signature/al)
ANNEX 1-------International Chamber of Commercepublished copy of theUniform Customs and Practice for Documentary Credits-600/2007. A copy of the publication is attached to the CONTRACT FOR SALES AND PURCHASE OF PHILIPPINE MANGANESE ORE signed by and between_____________and _________________ dated ________________.

本文发布于:2023-08-09 04:17:23,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/191962.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:意思   公办   翻译   环球
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图