锂离子电池技术英文词句
2.3 asmbly line process(5/15)流水线工艺
film loading-vacuum on-film folding-sliding jig backward-top cutting-sliding jig forward-
wouldyoupleavacuum off-film unloading
放上包装膜—抽真空—包装膜折叠-分切夹心的后端-剪掉顶部-分切夹心的前段-释放真空-拿下包装膜
station 岗位 two station 两个岗位
folding 折叠 guide type 指导方式
top cutting 顶部剪切 knife 刀片
2.3 asmbly line process(6/15)流水线工艺
j/r loading-vacuum on-j/r jig backward-bottom former up-upper former down-
2010好莱坞大片放极组-抽真空-极组夹具放在后端-模板末端在上面-顶端在下面-
heating forming-former up,down-j/r jig forward-vacuum off-j/r unloading
加热模板-模板上下翻转-极组夹具朝前-释放真空-取下极组
mindedstation two station
岗位 两个岗位
heating forming pressing time,pret timer
加热模板 施压时间 施压次数
temperature thermocouple
温度热电耦
time:mmin,2~max.3c
时间:
press force :40~50kg哈尔滨英语学校
压力
temperature:150℃
温度
2.3 asmbly line process(7/15)流水线工艺
film loading-fim clamp-sliding jig backward-edge pushing-tab clamp-tab unclamp-
放上包装膜-包装夹具-分切极组末端-整边-放极耳夹具-卸下极耳夹具
sliding jig forward-cell unloading
分切极耳前端
station two station
heat aling top
热封
aling thickness control(micrometer)
热封厚度控制(毫米)
aling control pressing time,pret timer
热封控制 施压时间 施压次数
precision regulator
精度校准
temperature, thermocouple
温度热电耦
time :min.2~max.3c时间
press force:250kg
压力
temperature:180~250℃
温度
2.3 asmbly line process(9/15)流水线工艺
cell loading-vacuum on-sliding jig backward-side cutting-feeding-tab cutting-
放上电芯-抽真空-滑动夹心后端-裁边-流入下工序-剪极耳
sliding jig forward-cacuum off-cell unloaing
滑动夹心前端-释放真空-取下电芯
station two station
托福辅导班
side cutting knife
side cutting force 100kg
tab cutting knife
tab cutting force 100kg
2.3 asmbly line process(10/15)流水线工艺
歌舞青春1歌曲cell loading-sliding jig backward-vacuum pad down-open-needle down-e/l filling(e/l-needle up-needle up-vacuum pad up-sliding jig forward-cell unloading
station two station
e/l supply 3kuter sub-tank on equipment
metering pump hi -bar pump,hbd-2bc-17
accuracy; under 3.0;±0.1g
ocer 3.0; ±3.5g
2.3 asmbly line process(11/15)流水线工艺
cell loading-sliding jig backward-jig backward-jig up-vacuum(vacuum chamber)-
放上电芯-滑动夹心后端-夹心向后-再向上-抽真空-
aling block forward-aling
热封前端- 密封
--aling block backward-jig down-silding jig forward-cell loading-formation
热封后端- 夹心翻转向下-滑动夹心前端-取下电芯-成型
station two station
vacuum source 740mmhg max.vacuum pump
aling control pressing time pret tiomer
pressing force, precision regulator
temperature, thermocouple热电偶
time:min.3~max4c
press force:250kg
temperatrure:180~250℃
2.3 asmbly line process(12/15)流水线工艺
cell loading-conveyor drive-numbering-numbering-head down-vacuum on-
放上电芯- 启动传送带- 编号码-编号码-电芯朝下-抽真空
head up-head forwward-head down-vacuum purge-head up-cell unloading
beefsteak电芯朝上- 电芯朝前- 电芯朝下-真空净化- 电芯朝上-取下电芯
speed controller motor 25W
elephant
numbering ink jet printer
cell unloading magacine
2.3 asmbly line process(13/15)流水线工艺
piercing-cell loading-sliding jig backward-jig up-vacuum°assing-
穿透??- 放电芯-滑动夹心后端-夹心向上- 抽真空&脱气
aling block forward-aling-aling block backward-jig down-sliding jig forward-cell loading
热封前端- 热封 –热封后端-滑动夹心前端 –取电芯
high maintenancestation two station
piercing ∮6hole
vacuum source 750mmhg max.vacuum pump
ap是什么意思aling comtrol pressing time ,pret timer
pressing force,preision regulator调整压力
temperature,thermocouple(温度热电偶)
time: min.3~max.4c时间
press force:250kg(压力)
temperature:180~250℃(温度)
2.3 asmbly line process(14/15)流水线工艺