一、用途
化灰机也叫石灰消化机、石灰消和机,是用于碳酸钙、磷酸氢钙的石灰消化设备,主要用于化工、化纤、造纸、电厂脱硫、制糖、生物制药、纯碱制造等行业。我公司生产的化灰机分为前排式化灰机和后排式化灰机两个系列。
潮流英语U
    Melts the ash machine also to be called the lime slaking machine, the lime slakeris us in the calcium carbonate, the calcium hydrogen phosphate lime slaking equipment, mainly us in professions and so on chemical, chemical fiber, papermaking, power plant desulphurization, sugar manufacturing, biological drugs manufacture, soda ash manufacture. Our company produces the ash fulage for the front-row type ash machine and the back row type ash machine two ries.
二、结构特点
化灰机主要由外筒体、内筒体、支撑装置及传动装置组成,尾部设有捞渣装置。该化灰机主要特点是采用由回转运动代替搅拌的化灰方法。化灰机内筒后部开有筛孔,石灰块同水在内筒接触消化,石灰乳穿过筛孔折流向加料口方向自下部排出口流出,未能消化的过烧及生烧石灰由外筒体尾部的捞渣装置排出筒外。该化灰机结构装置合理、操作方便、生产效率高,生产能力大、劳动强度小,对任何质量的石灰均适用。如图1.
muranoUnique featurekatebeckinsale
Melts the ash machine mainly by the outer sleeve body, the inner liner body, the blocking and the transmission device is compod, the rear part is equipped with fishes the dregs installment. Should melt the ash machine main feature is us by the gyroscopic motion replaces the agitation the ash method. Melts behind the ash machine inner liner to open has the mesh, the lime block with the water in the inner liner contact digestion, the milk of lime pass through the mesh baffling to flow out to the feed inlet direction from the lower part escapement, has not been able to digest the overroasting and lives the calcined lime to fish the dregs installment by the outer sleeve body rear part to discharge outside the tube. Should melt the ash machine structure equipment to be reasonable, the ea of operation, the production efficiency are high, productivity is big, the labor intensity is small, is suitable to any quality's lime.
三、规格型号及主要技术参数  Specification model and major technique parameter
规格型号
Specification model
Φ1.2m*12m
生产灰乳能力
Production ash young abilitym3/h
40
筒体转速
Tube body rotational speedrpm
35
筒体直径
Tube body diametermm
1200
筒体长度
Tube body lengthmm
12000
电机功率Electrical machinery powerkW
15
lilia
安装install the
(一) 零部件清查:Parts inventory:
    机器需在现场工地安装,设备分箱运抵现场。安装前要进行数量和质量检查。对损伤,变形的零件应更换,修复。应特别注意下列项目的检查:
1、 底座是否变形,螺栓孔距尺寸。
2、 托轮直径、长度;滑动轴承则应检查配合面接触情况。
3、 筒体的圆度、长度、段节接口变形情况。
4、 大齿圈及传动装置。
5、 细小零件的数量。
Machines at the scene contained in the site installation, equipment boxes arrived at the scene. Prior to installation to check the quantity and quality. Of injury, the deformation of t
he parts should be replaced, repaired. Should pay particular attention to the inspection the following items:
1, the ba is deformed Distance bolt size.
2, roller diameter, length; sliding bearing contact with it should check the situation.
3, the circular cylinder, the length of interface deformation ction above.
4, the ring gear and the gear.
5, the number of small parts.
(二)、基础验收The basis of acceptance
用户应会同安装部门、土建单位联合对设备基础检查验收。
Should be installed in the ur departments, construction units bad on the joint check and acceptance of equipment.
(三)、基础划线The basis of line
1、埋伏中心标版:在基础上面要埋设纵横向中心线的中心标板,在基础上面埋设标高基准点(或标高标板),每墩一个。
2googlle、画水平基准线:在各基础侧面,画一条水平基准线,并做好永久性标记,作为安装测量标高及长期观察基础下沉用。其标高误差不超过±0.5mm
3、画筒体纵向中心线:以支撑基础地脚孔横向中心点为基准求出各中心标板的中心点。允许偏差不超过±0.5mm
4、画基础的横向中心线:从有挡轮的基础为基准,按修正后各档水平距尺寸画出个基础墩的横向中心线。相邻各墩横向中心距允许误差不超过1.5mm;首尾两中心距允许的误差不超过±6mm
5、画传动系统中心线;根据已确定的筒体中心线,以大齿圈的位置为基准,画出传动系统的各中心线。
各中心线画出后应在相应的中心标板上用样冲打出中心点。
1, standard version of an ambush Center: In the basis of the above should be planted vertically and horizontally to the center of the center line of materials, laid in the basis of elevation above the reference point (or elevation materials), one for each pier.
  2, baline levels of painting: in the basis of the side, draw a horizontal reference line, and do a good job in permanent marker, as the installation of measurement bad on height and long-term obrvation of subsidence with. The elevation error is less than ± 0.5mm.
  3, vertical cylinder centerline painting: to support the foundation to the center pin hole horizontal centers calculated bad on a focal point for materials. Allow deviation does not exceed ± 0.5mm.
  4, bad on the horizontal centerline of painting: from the round of the basis of block-bad, according to a revid level of the file size of the basis to draw a horizontal centerline of the pier. Adjacent to the pier allows a horizontal center distance error of less than 1.5mm; from both centers to allow the error does not exceed ± 6mm.
  5, drawing the center line of transmission; have been identified bad on the centerline
of the cylinder, the location of a large ring gear to the ba, draw the center line of transmission.
研究生网上报名时间  Draw the center line should be marked in the center of the corresponding boards made with red-like focal point.
(四)、支撑装置的安装Installation support:
托轮组轴承有滑动轴承和滚动轴承两类。滑动轴承的托轴组应先检查托轮轴颈与滑动轴承的配合情况,以及球面瓦配合情况,不合格则需要刮研。
Wheel Bearing Group has two types of sliding bearings and rolling bearings. Sliding bearing axis of the care team should be asked to check with the sliding bearing axle neck with the situation, as well as the spherical-watt cope with the situation and failure you need to scratch Institute.
中国包揽乒乓球女单冠亚军
1、托轮组找正:Roller group is looking for:
托轮组中心位置找正,应以底座的纵横中心线对准基础的纵横中心线。托轮轴承组装配后,
两托轮轴线距底座纵向中心线应相等,并符合图纸尺寸,允许误差不超过0.5mm;托轮横向中心线应于底座横向中心线重合,误差不超过0.5mmgo to hell,同时托轮两端的轴向间隙应相等。同一档两托轮顶面中点联线应呈水平,允许误差不超过0.05mm/m;各档托轮顶面中点标高应与修正后图纸各档标高相符,相邻两档标高差允许偏差小于0.5mm,首尾两档允许偏差不超过2mm
Round of group care center is looking for should be the ba of the vertical and horizontal center line of vertical and horizontal alignment bad on the centerline. Wheel bearing asmbly group, the two asked axle centerline vertical line from the ba with the same, and in accordance with the drawings the size of allowable error of not more than 0.5mm; wheel ba longitudinal centerline should be in the horizontal center line of coincidence, the error is not more than 0.5mm, round at both ends at the same time care should be equal to the axial clearance. The same file two occasional round of top-line should be the mid-point was the level of permissible error of not more than 0.05mm / m; the file roller top center with the revid elevation drawings of the file the same elevation, elevation of the adjacent two respectively allowed deviation difference less than 0.5mm, two respectiv
ely, both to allow deviation of not more than 2mm.
2小学六年级英语毕业试卷、各档托轮安装后,必须进行细致的总检查,以有挡轮的托轮组横向中心线为基准测量:
相邻两档托轮组,横向中心线距允许误差3mm
首尾两档托轮组,横向中心线距允许误差6mm
Occasional round of the file installed, must be careful to check the total in order to block the occasional round of round of group-bad measurement of the horizontal center line: archy
Occasional round of group two respectively adjacent, horizontal center line of permissible error from 3mm;
Both occasional round of group two respectively, the horizontal center line of permissible error from 6mm;
(五)、传动装置的安装Installation drive
1、以大齿圈为基准安装小齿轮装置,其位置尺寸应符合图纸(注意此时相邻轮带应位于两挡轮中间)。依次安装减速器、电机。
2、调整大小齿轮的齿面接触和齿顶间隙。
在节圆附近接触长度应不少于齿宽的50%
1, bad on a large ring gear pinion installed devices, their location should be consistent with the size of the drawings (note the time zone should be located adjacent to the two-round round of the middle block). Followed by the installation of speed reducer, motor.

本文发布于:2023-07-21 06:59:57,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/184024.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:中心线   安装   基础   托轮   化灰机
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图