KEY HES Requirements 规范关键点 | Yes/No | Comments如何系统的学日语 get stupid评注 aswellas |
Personnel conducting electrical installation or maintenance must be qualified and trained. 从事电气安装和维修的人员必须培训,持证上岗。 栏杆英文 | ||
All electrical equipment must have a pre-mobilization test/inspection by a competent person before being put into operation. Record of test/inspection must be on file at site for COMPANY audits and equipment must have a unique identification number so it can be traced back to its test/inspection records. 所有电气设备必须在入场前由合格人员检查测试,检查测试记录现场备案以供公司审查。每个设备只能有唯一编号以便追踪检查记录。 | ||
Power Supplied Via ELCB (30ma x 0.1s), power distribution with 3-pha 5-wire(TN-S)system. 供电必须经过漏电开关(30毫安,0.1秒)3相5quean线制(TN-S系统)配电, | ||
Multiple connections of cables to one switch shall be prohibited,”3 levels of distribution and 2 levels of protection” practice shall be followed. “一机,一闸,一箱”和“三级配电两级保护”规范得以遵从。 | ||
All cables are double insulated and in good condition (no damage, no deterioration etc). eu所有电缆是双层绝缘并完好(无破损,老化等) 杭州服装培训 | ||
Connection of industrial type (cable splice, socket, plug etc), domestic standard cables and fittings not allowed on site.工业连接(电缆连接,插座,插头)不允许使用家用标准的电缆和连接。 | ||
Cable and wire laying, all extension cords must properly protected (cable properly suspended or conduited), Wiring or cable shall not be submerged or lay over a water pool. . 电缆电线布线,延长线须恰当保护(如电缆恰当悬空,穿管)电缆电线不能泡于水中或悬于水面 。 | ||
Electrical lighting with safe voltage utilized when work in such condition which required.在规定情况下使用安全照明 | ||
Generators equipped with required covers, electrical panels must be weatherproof type,All electrical danger signs posted。发电机装备保护罩,配电箱须防雨型,张贴电气危险标志。 | ||
Distribution panels keep locked and panels’ keys held by authorized personnel who should put his name on the panel.配电箱上锁,钥匙由专人保管,保管人姓名标注在箱上。 | ||
. At inspection, repairing or installation of electric appliances, electrical system related must be de-energized and/or isolated prior to commencement of work. LO/TO procedure implemented。不得带电检查,维修和安装电气设备和线路,标识/锁定程序得以执行。 | ||
Overloading beyond the rated capacity shall be prohibited不允许过流过载, 电焊机须有二次侧空载降压保护。 | ||
holylandProper equipment grounding (generators, welding machines, panels, power tools etc) (发电机,电焊机,配电箱,电动工具等)正确接地subquently. | ||
All electrical equipments/tools must be regularly inspected/color coded and documented.所有电气设备/工具必须定期检查,色标和记录。 | ||