Field HES Checklist—Electrical safety
现场HES检查卡电气安全
KEY HES Requirements 规范关键点
Yes/No
Comments如何系统的学日语
get stupid
评注
aswellas
Personnel conducting electrical installation or maintenance must be qualified and trained.
从事电气安装和维修的人员必须培训,持证上岗。
栏杆英文
All electrical equipment must have a pre-mobilization test/inspection by a competent person before being put into operation. Record of test/inspection must be on file at site for COMPANY audits and equipment must have a unique identification number so it can be traced back to its test/inspection records. 所有电气设备必须在入场前由合格人员检查测试,检查测试记录现场备案以供公司审查。每个设备只能有唯一编号以便追踪检查记录。
Power Supplied Via ELCB (30ma x 0.1s), power distribution with 3-pha 5-wireTN-Ssystem.
供电必须经过漏电开关(30毫安,0.1秒)35quean线制(TN-S系统)配电,
Multiple connections of cables to one switch shall be prohibited,”3 levels of distribution and 2 levels of protection” practice shall be followed. “一机,一闸,一箱”和“三级配电两级保护”规范得以遵从。
All cables are double insulated and in good condition (no damage, no deterioration etc).
eu所有电缆是双层绝缘并完好(无破损,老化等)
杭州服装培训
Connection of industrial type (cable splice, socket, plug etc), domestic standard cables and fittings not allowed on site.工业连接(电缆连接,插座,插头)不允许使用家用标准的电缆和连接。
Cable and wire laying, all extension cords must properly protected (cable properly suspended or conduited), Wiring or cable shall not be submerged or lay over a water pool.
. 电缆电线布线,延长线须恰当保护(如电缆恰当悬空,穿管)电缆电线不能泡于水中或悬于水面
Electrical lighting with safe voltage utilized when work in such condition which required.在规定情况下使用安全照明
Generators equipped with required covers, electrical panels must be weatherproof typeAll electrical danger signs posted。发电机装备保护罩,配电箱须防雨型,张贴电气危险标志。
Distribution panels keep locked and panels’ keys held by authorized personnel who should put his name on the panel.配电箱上锁,钥匙由专人保管,保管人姓名标注在箱上。
. At inspection, repairing or installation of electric appliances, electrical system related must be de-energized and/or isolated prior to commencement of work. LO/TO procedure implemented。不得带电检查,维修和安装电气设备和线路,标识/锁定程序得以执行。
Overloading beyond the rated capacity shall be prohibited不允许过流过载, 电焊机须有二次侧空载降压保护。
holylandProper equipment grounding (generators, welding machines, panels, power tools etc)
(发电机,电焊机,配电箱,电动工具等)正确接地subquently.
All electrical equipments/tools must be regularly inspected/color coded and documented.所有电气设备/工具必须定期检查,色标和记录。
danielle bradbery

本文发布于:2023-07-20 11:56:18,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/183178.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:电缆   检查   保护
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图