Area: | Date: | Inspected By: |
ITEMS | Aspects to Be Inspected | YES | NO | N/A |
Hou Keeping | Project work areas are clean and free of excess trash, debris | |||
Walkways and passageways clear | ||||
Materials or equipment properly stored | ||||
Electrical cords, hos, welding leads, etc., elevated or properly arranged to prevent trip hazards | ||||
Scrap material free of protruding nails or other puncture hazards | ||||
Trash receptacles are provided for work areas and water kegs | ||||
The warning signs, HSE posters are erected properly | ||||
Barricades and/or rebar caps installed and maintained | ||||
PPE | Hard hats worn and maintained as required | |||
Hearing protection worn as required | ||||
Eye protection required and worn in a proper manner | ||||
Proper foot protection worn for job performed | ||||
Face shield or goggles/safety glass worn as required | ||||
Others: respirators, gloves, chemical resistant garments | ||||
Work at Height | Approved safety harness are worn and ud properly | |||
The edge and holes prenting fall hazards are protected properly | ||||
All the working platforms ud for working at height are inspected, approved and tagged out by dedicated supervisor prior to u and the following inspection conducted on a weekly basis with corresponding records kept | ||||
Fall protection equipment is ud only for fall protection | ||||
Fall protection maintained and has current inspection | bgs | |||
The Ladder ud properly | 海伦英语口语 | |||
Grating/floor plate/guardrail removal by permit only and protected | ||||
Built as per specification/Method Statement | ||||
Proper access and egress provided for scaffolds | ||||
Scaffolds tagged correctly | ||||
Proper ladder for the job performed/properly cured | ||||
Proper angle and exceed the landing 3 feet (0.9 meter) | ||||
Excavation | Sloping and shoring proper | |||
Access and egress provided every 25 feet (7.5 meters) | ||||
Barricaded properly with necessary warning signs erected | ||||
LRC for UXO clearance available | ||||
国庆节升旗仪式Soil and materials stored at least 1m away from the excavation edge | ||||
Vehicle and heavy equipment keep 1.5 times of the excavation depth away from the excavation edge | ||||
Banks man designated to direct mechanical excavation | ||||
Lifting Operations | The equipment and accessories approved and tagged by dedicated supervisor (ATO) | |||
The Equipment / tools ud and operated properly | ||||
Lifting plan meticulously prepared with corresponding risk asssment conducted and communicated to concerning persons | ||||
All the necessary personnel such as signal man, rigger, banks man and supervisor are trained (LAT) and in position and know their respective responsibility | ||||
The hazardous area is barricaded with warning sign erected properly and unnecessary personnel restricted | ||||
Vehicle and Mobile Equipment | 功夫熊猫2英语版Lights, brakes, horns, alarms working properly | |||
Seat belts provided and ud | ||||
Properly maintained and in safe conditions | ||||
The reversing of vehicle is conducted under the direction of banksman | ||||
Equipment ud properly | ||||
Licens or certifications as required | ||||
Tools and Equipment | Electrical cords - no damage and current inspection | |||
Tools/Equipment are maintained in a safe condition | ||||
Tools are properly carried and stored | ||||
Pneumatic/hydraulic ho connections properly cured | ||||
Proper tools ud for the job performed | ||||
Proper adjustment on work rest/wheels properly dresd on bench grinders | ||||
Fire Protection | Flammables stored properly | |||
Oxygen and combustibles parated | ||||
Containers/Gas cylinders labeled as to content | ||||
Fire extinguishers properly located and inspected | ||||
Flash arrestors installed | ||||
Compresd gas cylinders properly maintained | ||||
Containment of hot work and welding screens as required | ||||
Regulator gauges properly attached and maintained | ||||
Fire watcher designated to overwatch the hot work | ||||
Confined Space Entry | Gas test conducted prior to entry and following test conducted as per defined in the risk asssment | |||
Sufficient ventilation | ||||
Rescue equipment and procedures in place | ||||
Anti-explosion Lighting | 如何申请新加坡留学 | |||
Keep an entry log for entrants enter into and out of the confined space | ||||
Gas cylinders are NEVER to be taken into a confined space | ||||
Standby man to be in place at all times whilst workers are inside the confined space and Regular contact with the workers is required | 国庆节贺词 | |||
Permits | Applicable permits posted on work site | helvetica | ||
Risk Asssment and TBT are written in the proper language(English, Chine or Arabic) as appropriate | ||||
TBT is conducted among participants | ||||
Procedures followed (i.e., hazard asssment, confined space, lead, asbestos) | ||||
Method Statement and other procedures in place and communicated to concerning individuals | ||||
The checklist is available and filled out by concerning personnel | ||||
The Certification needed for specific job is available | ||||
Unsafe Conditions and Behaviors Description | ||||
SN | Description | RESP. | Clod Date | Verified |
1 | ||||
nby | ||||
the world as i e it | ||||