Personnel Lifts 供工作人员的电梯(英文)

更新时间:2023-07-08 22:01:27 阅读: 评论:0

PERSONNEL LIFTS CHECKLIST
Project #:    ____________________________________
Date:        ____________________________________
Completed by:    ____________________________________
运动项目英语
PERSONNEL LIFTS
YES
NO
COMMENTS
1.
Are only trained and authorized workers permitted to operate personnel lifts?
 
 
 
2.
Is the documentation of authorized workers training available?
 
 
 
3.
Are each personnel lift inspected, maintained, and repaired in accordance with the manufacturer's operating and maintenance manual and relevant standard?
 
 
 
4.
Is the personnel lift inspection log readily available?
 
 
 
5.
Is each personnel lift supplied with an operator's manual, safety procedures, maintenance, and repair requirements?
gaopeng
 
 
 
6.
Are controls clearly marked, easily understood, and guarded against accidental activation?
 
 
 
7.
Are the manufacturer's operating instructions for all personnel lifts permanently affixed to the personnel lift in a conspicuous location, well protected from the weather?
 
 
 
8.
Is the rated capacity for each man lift conspicuously displayed?
 
 
 

bule14岁英语学习
9.
Does the personnel lift have both primary and condary controls?        (Primary controls are ud by the operator in the basket. Secondary controls are accessible from ground level).
 
 
 
10.
television的音标
Are all personnel lifts equipped with emergency stop devices? Are emergency stop devices readily accessible to the operator?
 
 
 
PERSONNEL LIFTS
YES
NO
COMMENTS
11.
Is the personnel lift equipped with an alarm or other warning device that automatically activates when the machine ba is more than 5 degrees out of level in any direction?
 
 
 
12.
Is the hydraulic or pneumatic asmbly designed to prevent free descent in the event of a sudden loss of hydraulic or pneumatic pressure?
 
 
 
13.
Does the personnel lift have skid and slip resistant working surfaces?
 
 
 
14.
Does the access gate swing inward? Is it lf-closing?
 
 
 
15.
Is the access gate equipped with restraining devices to prevent accidentally opening?
 
 
 
16.
Is the personnel lift guardrail t 42 inches?
curity什么意思
 
 
 
17.
Are workers prevented from standing on mid-rails and reaching from the personnel lift?
 
 
 
18.
Are parate anchorage points provided for the number of people who may safely occupy the personnel lift?
 
 
 
19.
Is the anchorage point location and lanyard designed to keep the free-fall distance as short as possible?
 
 
 
20.
Are workers required to u full body harness with shock absorbing lanyards at all times?
 
 
 
21.
Is the aerial lift being operated near energized electrical lines?
 
 
 
22.
Are there any over head hazards (steel erection, overhead crane)?
 
 
 
23.
Are personnel lifts with outriggers capable of preventing retraction with a sudden loss of hydraulic or pneumatic pressure?
 
 
 
24.
Are the personnel lift outriggers designed to ensure that the personnel lift basket cannot be raid unless the outriggers are properly t?
expen
 
 
 
PERSONNEL HOIST RIDING SYSTEM
YES
NO
COMMENTS
25.
Have all workers read and understood all instructions and labels regarding installation, u, inspection and maintenance of hoist systems they will u?
 
 
环保袋英文 
26.
Has a competent person other than the ur inspected each personnel-riding device within the previous year and determined that is in good working order?
 
 
 
27.
Have all components of the personnel- riding system been inspected prior to rigging and u at the installation site?
 
 
 
国庆节 英文
28.
Are procedures and equipment in place for rescue and evacuation of all personnel using a personnel-riding system?
 
 
 

本文发布于:2023-07-08 22:01:27,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/171388.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:项目   运动
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图