上海赛科90万吨乙烯工程 Shanghai SECCO 900KTPA Ethylene Project | ||
单项(单元)工程: Work Item (Unit): | 施工质量规则附表目录(一) PR-00-CIJ-QU-0002 Construction Quality Rules Annexed Table Index (I) | 项目编号: Project No.: |
表号 Table No. | 表格名称 Table Title | 备注 Remarks |
√ -A01 | 施工组织总设计报审表Review Request on Overall Construction Organization Design | 3 |
-A02 | 工程技术管理文件报审表Review Request on Engineering Technical Management Document | 4 |
-A03 jog | 分包单位资格报审表Review Request on Qualification of Subcontractors | 5 |
√ -A04 | 单位工程开工报审表Review Request on Commencement of Work Unit | 6 |
-A05 | 工程复工报审表Review Request for Resume of Work | 7 |
√ -A06 | 施工测量放线报验单 Construction Surveying and Setting Out Inspection Request | 8 |
√ -A07 | 材料/构配件/设备报审表 Material/Component/Equipment Review Request | 9 |
-A08 | 单位工程划分申报表 Work Unit Division Application Report | 10 |
√ -A09 | 单位工程工序质量控制点申报表 Report Table of Work Procedure Quality Control Points of Unit of Work | 11 |
-A10 | 工序质量控制点核验通知 utanWork Procedure Quality Control Point Inspection Notice | 12 |
-A11 | (检验批)分项工程质量报验申请表 (Inspection Batch) Work Item Quality Inspection Application | 13 |
-A12 | 分部工程质量报验申请表 Work Section Quality Inspection Application | 14 |
-A13 | 单位工程质量报验申请表Work Unit Quality Inspection Application | 15 |
-A14 | 竣工测量报验申请表Completion Surveying Inspection Application | 16 |
-A15 | 工程中间交工检验通知Intermediate Handover Inspection Notice | 17 |
-A16 | 工程交工报验单正常情况下Construction Takeover Inspection Request | 18 |
-A17 | 事故报告单Accident Report | 19 |
-A18 | 监理工程师通知回复单 Supervision Engineer Notice Respon | 20 |
-B01 | 监理工程师通知单 Supervision Engineer Notice | 21-22 |
-B02 | 工序质量控制点检查认可书 Work Procedure Quality Control Point Inspection and Acceptance Certificate | 23 |
-B03 | 工程中间交工证书Intermediate Handover Certificate | 24 |
-B04 | 工程暂停令 Work Suspension Order | 25 |
-B05 | 巡视旁站监理记录Patrol Supervision Record | 26 |
-B06 | 会议纪要(一) (二)Minutes of Meeting (I)(2) | 27-28 |
上海赛科90万吨乙烯工程 Shanghai SECCO 900KTPA Ethylene Project | ||
单项(单元)工程: Work Item (Unit) | 施工质量规则附表目录(二) Construction Quality Rules Annexed Table Index (II) | 项目编号: Project No. |
表号 Table No. | 表格名称 Table Title | 备注 Remarks | ||
-C01 | 监理工作联系单 Supervision Correspondence | 29 | ||
-C02 | 工程变更单Variation Order | 30 | ||
-C03 | 抽检记录 Spot Inspection Record | 31 | ||
√ -C04 | 工程建设有关单位及主要人员(一)(二)(三)Main Parties and Persons Involved in the Project (1), (2) and (3) | 32-33 | ||
早教中心哪个好-C05 | 工程承包单位及承包内容 Construction Contractor Info. And Scope of Contract | 34 | ||
-D01 | 交工技术文件封面 Handover Technical Document Cover | 35 | ||
-D02 | 交工技术文件总目录 Master Table of Contents of Handover Technical Document | 36 | ||
-D03 | 交工技术文件目录 Table of Content of Handover Technical Document | 37 | ||
-D04 | 讨厌的英文交工技术文件说明 Note of Handover Technical Document | 38 | ||
-D05 | 开工报告 Commencement Report | 39 | ||
-D06 | 工程中间交接(机械竣工证书)Intermediate Takeover (Mechanical Completion Certificate) | 40 | ||
-D07 | 联动试运行合格证书 Linkage Commissioning Qualified Certificate | 41 | ||
-D08 | 工程交工证书 Project Takeover Certificate | 2005年高考试题 42 | ||
-D09 | 交工技术文件移交证书 Technical Document Handover Certificate Upon Take-over of Work | 43 | ||
-D10 | 未完工程项目明细表 Uncompleted Work List | 44 | ||
-D11 | 重大质量事故处理鉴定报告 Major Quality Accident Remediation and Evaluation Report | 45 | ||
-D12 | 工程联络单 Project Correspondence | 46 | ||
-D13 | 设计变更一览表 Design Change Schedule | 47 | ||
-D14 | 工程联络单一览表 Project Correspondence Schedule | 48 | ||
上海赛科90万吨乙烯工程 Shanghai SECCO 900KTPA Ethylene Project A—01 | ||||
单项(单元)工程: Work Item (Unit): | 施工组织总设计报审表 Review Request on Overall Construction Organization Design | 项目编号: Project No.: | ||
编号:No. | ||||
致(监理单位) To (Supervision Company):上海市电力工程建设监理有限公司(SPESC 我方已根据施工合同的有关规定完成了 SECCO电厂原水处理区储罐 工程施工组织总 设计的编制,并经我单位上级技术负责人审查批准,请予以审查。 We’ve completed overall construction organization design for works of SECCO Electric Field Raw water treatment Tanks as per related requirements as specified in the Construction Contract, which has been reviewed and approved by competent technical leader in our company, we hereby submit it for your review. 附Attachment:施工组织总设计Overall Construction Organization Design 承包单位(章): 项目经理(签字): 日期: Contractor(Chop) Project manager(Signature): Date: |
总监理工程师审查意见:Review remarks of Chief Supervision Engineer: 审查结论Review conclusion: □同意Approve □修改后再报To be resubmitted after revision □重新编制To be compiled again 项目监理机构(章): 总监理工程师(签字): 日期: Project supervision company(Chop): Chief supervision engineer (Signature): Date: |
业主项目经理审批意见Review remarks of the Owner’s project manager: 审查结论Review conclusion: □同意Approve □修改后再报To be resubmitted after revision □重新编制To be compiled again 业主管理机构(章): 项目经理(代表): 日期: Owner’s management level (chop): Project manager (Reprentative): Date: |
注:施工组织总设计审批意见中,特指的重大施工方案须经业主审批。 Note: Major construction method especially specified in review and approval remarks on overall construction organization design shall be also reviewed and approved by the Owner. |
上海赛科90万吨乙烯工程 Shanghai SECCO 900KTPA Ethylene Project A—02 | ||
单项(单元)工程: Work Item (Unit): | 工程技术管理文件报审表 Review Request on Engineering Technical Management Document | 项目编号: 72 Project No.: |
长春培训 编号:No. | ||
致(监理单位)To (Supervision Company):上海电力工程建设监理有限公司 现报上关于 原水处理储罐施工方案 工程技术管理文件,请予以审定。 The technical management document of works of is hereby submitted for review and approval. | ||||
序号 No. | 类别 Category | 编制人 Prepared by: | 册数 Volume(s): | 页数 Page(s) |
1 | 施工方案Construction plan | 李尚升 | 1 | 80 |
2 | ||||
3 | ||||
4 | ||||
假期见闻作文编制单位(章): JCC 技术负责人(签字): 申报人(签字): 李尚升 Prepared by(chop): Technical leader (Signature): Submitted by (Signature): | ||||
承包单位意见Contractor’s remark: □有 Yes /□无 No 附页 Annexed pages 承包单位(章): 技术负责人(签字) : 日期: Contractor (chop) : Technical leader (Signature): Date: | ||||
监理机构审核意见Review and approval remarks of the Supervision Company: 审定结论Review conclusion: □同意Approve □修改后再报To be resubmitted after revision □重新编制To be compiled again 项目监理机构(章): 总监理工程师(签字): 日期: Project Supervision Com.(Chop): Chief supervision engineer (Signature): Date:takeafter | ||||
生活大爆炸第一季15附注:施工组织总设计审批意见中,特指的重大施工方案,还需业主审批。 Note: Major construction method especially specified in review and approval remarks on overall construction organization design shall be also reviewed and approved by the Owner. | ||||