风量的单位一般是CFM(cubic

更新时间:2023-06-15 15:15:58 阅读: 评论:0

马云英语演讲视频1. 风量的单位一般是CFM(cubic feet per minute 立方英尺/分)。 金威源的规格书上写的是0.47m3/min.根据单位换算: 0.47X( 3.27868852459 feet)^3/min=16.565 CFM.  (1 英尺=0.305 米)
2. 3the material of the bobbin E4008 is  the optional part, can not be ud as grounding insulation. So between the winding and the bobbin, insuation Tape should be ud. and the insulation tape shall be lected from the Ground & Interwinding Insulations in the insualtion system.
I mean All the insulation tape shall be lected from the material in the insulation system.
The insualtion tape ud as interwinding insualtion such as between primary winding and condary winding should lected from Ground & Interwinding Insulations. If the bobbin is ud as insulation it shall lected form Ground & Interwinding Insulationsucfly.
The manufacturer should know how to lect the insulation materials from the insualtion system.
3. The following item can not be ud.
    a. X capacitor shall be FOWX2, FOKY2 can not be ud as X capacitor now.
E186662
04. X-capacitor (CX2)
Xjavabeans
XIAMEN FARATRONIC CO LTD
MKP62
磅礴的拼音310Vac, 2.2uF
FOKY2
UL
--
    b. Gas tube shall be XUHT2, QVGQ2 can not be ud.
E163070
Gas tube (G1)
X
EPCOS AG
R6O8XA
600V
QVGQ2
UL 三分钟英语故事
--
UL 497B
4.
Pls help to arrange the test complete within two days
1.2.2.1 - MAXIMUM OUTPUT VOLTAGE, CURRENT, AND VOLT AMPERE MEASUREMENT TEST       
1.6.2 - INPUT TEST: SINGLE-PHASE               
2.1.1.7  CAPACITANCE DISCHARGE TEST       
2.2.2, 2.2.3, 2.2.4  SELV RELIABILITY TEST               
2.4.1, 2.4.2 - LIMITED CURRENT CIRCUIT MEASUREMENTS       
2.5  LIMITED POWER SOURCE MEASUREMENTS       
4.5.1, 1.4.12, 1.4.13  HEATING TEST               
birthdate2.10.2  DETERMINATION OF WORKING VOLTAGE - WORKING VOLTAGE MEASUREMENT TEST               
executive是什么意思
2.10.2  DETERMINATION OF WORKING VOLTAGE - HAZARDOUS VOLTAGE (CIRCUIT) MEASUREMENT TEST       
2.10.5.2, 2.9.5  TRANSFORMER/INSULATION ELECTRIC STRENGTH TEST       
5.3.3, 5.3.6b, ANNEX C.1 - TRANSFORMER ABNORMAL OPERATION TEST       
And start the following test in the first day.
简单美白2.9.1, 2.9.2, 5.2.2  HUMIDITY TEST
5.2.2  ELECTRIC STRENGTH TEST               
5.1, ANNEX D  TOUCH CURRENT TEST  (Single Pha; TN/TT System)       
5.3.1, 5.3.4, 5.3.6  COMPONENT FAILURE TEST        coast guard
欲望都市第六季5.3.1  5.3.8.2  ABNORMAL OPERATION TESTS       
5.3.6  POWER SUPPLY OUTPUT SHORT-CIRCUIT/OVERLOAD TEST 
5.
The maximum load of the AC outlet shall near the AC outlet.
And the CAUTION as below shall near the AC inlet
CAUTION:Forcontinued protection against risk of fire,replace only with same type and rating of fu.
6. 我们将现在用的X电容MKP62当作滤波电容.是否UL就不管制了.因为这么大的容量确实不好找.
 
请确认是否可行,谢谢!
不可以的,跨接在L/N 之间的电容是需要控制的。请参考标准。还有请赶快确认输入电压频率的范围和输入电流。我需要这些来写DATASHEET. 见95标准 1.5.6
7. 请在变压器规格书中加上  “Marking: Company name and system designation”  这段文字。
这是绝缘系统marking 的要求。

本文发布于:2023-06-15 15:15:58,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/146034.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:输入   是否   规格书   单位   系统   确认
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图