The question below is bad on the following information:Which of the following
distributions would be the central warehou allocation of120units of inventory to district
warehous A,B,and C if the equal run-out method were ud? Warehou Daily usage On-hand inventory
A1060在职mba分数线
B30160
C20140
闸管
20units to A,60units to B,40units to C
20units to A,80units to B,20units to C(√)
100units to A,0units to B,20units to C
20units to A,53units to B,47units to C
A warehou has20,000orders per year with an average of10line items per order.The warehou experiences800backorders per year averaging 5line items per backorder.What level of customer rvice is achieved when the percentage of line items shipped on
schedule is ud?
96%
97%the反义词
98%(正确答案)
99%
Which of the following communicates in-transit inventories to a warehou?
Bill of distribution
Master schedule
Order acknowledgment to warehou
Distribution requirements planning(√)
Which of the following data is an input to distribution requirements planning?
Location points
Order value
Shipping schedules
Interplant demand(正确答案)
Which of the following issues is most likely to lead to the u of a short-term,rather than long-term,forecasting process?
How to respond to a competitor's test marketing of a new product(正确答案)
How to configure the supply chain to support a new market gment
Whether to outsource a capital-intensive subasmbly process
Whether to take a price-leadership or a product-differentiation posture
Which of the following factors has the greatest effect on the length of the forecast horizon?
Cumulative product lead time
日语在线翻译Purpo of the forecast(正确答案)
Frequency of forecast revision
Size of forecast period
Which of the following statements about both econometric models and market rearch is true?
They can be ud in place of adaptive smoothing
They are uful in aggregate planning(√)
They are uful in forecasting at the stockkeeping unit levelthere will be blood
They are examples of intrinsic forecasting techniques
When quantitative data are being evaluated,a very small bias in a forecast can best be explained by which of the following statements?
The absolute values of all forecast errors were approximately equal.
The variability of forecast data was skewed
A very small alpha factor was ud.
Positive forecast errors approximately offt negative forecast errors (√)
The forecast tracking signal is the ratio of the:
cumulative error to the MAD.(√)
cumulative error to the forecast
forecast to the MAD
standard deviation to the MAD
A demand filter can best be ud for which of the following purpos?
To remove asonal variability from forecast data
To remove scrap loss from a work center history
To adjust the alpha factor
To flag a large order(√)
Elements calculated in the master scheduling process include
allocations.
time fences.
rvice-parts forecast
available-to-promi(√)
Available-to-promi data facilitates the process of
inventory planning
capacity planning
forecasting
order entry(正确选项)
A bill of resources typically contains information about a product's
inventory balances
necessary的用法key work centers(√)
production schedule
complete list of components
Which of the following actions is best for a company to take when a2-week plant shutdown for retooling is planned for the next year?
Increa planned production(正确答案)
Alter the strategic plan
Increa material requirements planning safety-stock levels
Decrea the planned sales level during the shutdown
The most effective way to cope with uncertainty of demand and to improve customer rvice is to reduce:
lead times(正确答案)
backlogs
safety stock
product options
Which of the following tools is ud to accommodate forecast errors when developing the master production schedule?
Planning time fence
Firm planned orders
Safety stock(√)
Available-to-promi
In an asmble-to-order environment,which of the following factors is most significant in determining which items should be master scheduled?
Size of the forecast error
Length of the master schedule horizon
Number of levels in the bill of material
Number of product options(正确答案)
Rough-cut capacity planning is best ud to:rob
determine labor requirements
establish order priorities
asss the load on a work center
evaluate the master production schedule(正确选项)
The question below is bad on the following information:Which of the following weekly production rates best supports the criteria?
In a repetitive manufacturing environment where a level production rate must be maintained,the following customer backog must be satisfied with NO late shipment;
woodstockWeek Customer backlog qty
责任意识178
268
レクイエム
390
458
556
70
78
80(√)
90
Translation of a master production schedule directly into key resources results in a:

本文发布于:2023-06-14 10:36:20,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/144626.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图