項次 | 英文名稱 | 中文名稱 | |
3 | ABC Classification | ABC分類 | |
4 | ABC Inventory Control | ABC庫存操纵 | |
5 | Abnormal Demand | 反常需求 | |
6 | Account Payable | 應付賬款 | |
7 | Accounting | 會計 | |
8 | Accounts Receivable | 應收賬款 | |
9 | Accounts Receivable | 應收賬款 | |
10 | Accruals | 預估費用 | |
11 | Acquisition | 併購 | |
12 | Action Message | cibi活動信息 | |
13 | Action Report | 行動報告 | 备考安全|
14 | Action-Report-Flag | 活動報告標志 | |
15 | Actual Capacity | 實際能力 | |
16 | Actual Costs | 實際成本 | |
17 | Add/Delete BOM | 增刪材料表 | |
18 | Addition Equipment | 額外設備 | |
19 | Additional Manpower | 額外人力 | |
20 | Additional Space | 額外空間 | jingle|
21 | Adjust On Hand | 調整現有庫存量 | |
22 | Aggregate Planning | 總體規劃 | |
23 | Agile Manufacturing | 靈活製造 | |
24 | Aging Reports-Analysis | 賬齡分析表 | |
25 | Allocated Inventory﹝AL﹞ | 保留量 | |
26 | Allocations | 已分配量 | |
27 | Allowance | 寬放 | |
28 | Alternate BOM | 替代材料表 | |
29 | Alternative Routing | 替代工序 | |
30 | American Production and Inventory Control Society | 美國產業治理學會﹝APICS﹞ | |
31 | Anticipation inventory | 預期庫存a | |
32 | Applications | 應用軟件 | |
33 | Asmble to Order﹝ATO﹞ | 訂單組裝 | |
34 | Asmbly | 裝配 | |
35 | Asmbly Order | 裝配訂單 | |
36 | Asmbly Parts List | 裝配零件表 | |
37 | Automation | 自動化 | |
38 | Autonomic ion | 自主化 | |
39 | Available | 可用的 | |
40 | Available Inventory 好人好事演讲稿 | 可達到庫存/可用庫存 | |
41 | Available Material | adieu可用材料 | |
42 | Available Stock | 可達到庫存 | |
43 | Available Work | 可利用工時 | |
44 | Available-To-promi | 可答應量 | |
45 | Back Panel | 背板 | |
46 | Back-Flush | 倒沖入賬 | |
47 | Backlog | 待交貨 | |
48 | Backorders | 欠交訂單/延誤交期 | |
49 | Balance sheet | 資產負債表 | |
50 | Balance-On-Hand Inventory | 現有庫存餘額 | |
51 | Bank Reconciliation | 銀行對債 | |
52 | Batch Number | 批號 | |
53 | Batch Production | 批量生產 | |
54 | Benefits Data Management | 福利資料治理 | |
55 | Bill of Labor﹝BOL﹞ | 工時清單 | |
56 | Bill of Lading | 提貨單 | |
57 | Bill of Material﹝BOM﹞ | 材料清單 | |
58 | Bill of resources﹝BOR﹞ | 資源表 | |
59 | BOM Code | 材料碼表 | |
60 | BOM Explosion | 材料表展開 | |
61 | BOM Implosion | 材料表逆展 | |
62 | BOM Structure | 材料表結構 | |
63 骑行爱好者 | Branch Warehou | 分庫 | |
64 | Budget Variance | 預算差異分析 | |
65 | Budgeted Capacity | 預算產能 | |
66 | Built-On-The-Line Parts | 線上生產零件 | |
67 | Bulk Issue | 大批發料 | |
68 | Bullwhip Effect | 長鞭效應 | |
69 | Burden Allocation | 製造費用分攤 | |
70 | Burden Rate Maintenance | 費用分攤率治理 | |
71 | Business Plan﹝BP﹞ | 事業計劃 | |
72 | Business Process Reengineering﹝BPR纤细的意思﹞ | 企業程序再造 | |
73 | Buyer | 採購員glad是什么意思 | |
74 | CAD/CAE Interface | 電腦制圖界面 | |
75 | Cancellation | 訂單之取消 溏心风暴主题曲 | |
76 | Capacity | 能力/產能 | |
77 | Capacity Control | 產能操纵 | |
78 | Capacity Planning | 產能規劃 | |
79 | Capacity Requirements Planning﹝CRP﹞ | 產能需求計劃 | |
80 | Carrying Cost | 保管費 | |
81 | Carrying Cost Rate | 保管費率 | |
82 | Cash Application | 收款 | |
83 | Chang Notices | 變更通知 | |
84 | Change Lot Date | 修改批量日期 | |
85 | Change Route | 修改工序 | |
86 | Change Structure | 修改產品結構 | |
87 | Check Prep. Distribution & Reconciliation | 應付票據操纵 | |
88 | Check-in | 結入 | |
89 | Check-Out | 結出 | |
90 | Checkpoint | 檢查點 | |
91 | Common Part BOM | 共用件材料表 | |
92 | Competitive analysis | 競爭分析 | |
93 asg to | Component | 組件 | |
94 | Computer Aided Design System﹝CAD﹞ | 電腦輔助設計系統 | |
95 | Configuration Code | 配置代碼 | |
96 | Configuration Control | 架構操纵 | |
97 | Connected Flow | 相連材料流 | |
98 | Consolidated Freight | 合並貨運 | |
99 | Consolidations | 總合報告表 | |
100 | Constraint Management | 限制因素治理 | |
101 | Contact-Name | 聯系者名 | |
本文发布于:2023-06-12 06:27:13,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/90/142187.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |