装卸时间事实记录常用语(SOF)
一、 船舶抵达
1. 抵达引水锚地Anchored at Pilot anchorage. Arrived at Pilot anchorage
2. 抵达检疫锚地Anchored at Quarantine anchorageabro
3. 等候引水Awaiting pilot, Waiting for pilot
4. 等候联检Awaiting Joint Inspection
5. 检疫通过Free Pratique granted
6. 进行联检Joint Inspection conducted
7. 联检完毕Joint Inspection completed
8. 等候潮水进港Awaiting tide for entry
9. (从引水站)驻往装、卸泊位Proceeding to berth for loading/discharging
10. 从锚驶往装/卸泊位Heaved up (Weighed) anchor and proceeded to berth for loading/discharging
11. 驶靠第X号码头Proceeded & berthed alongside wharf NO…
gldm12. 从浮筒移至装/卸泊位Shifting from buoys to loading/discharging berth
研究生复试自我介绍13. 船系XX号浮筒Moored at buoys NO…
14. 因…不能进港Failed to enter due to…
15. 因…返回锚地Turned back to anchorage due to…
二、装卸准备
1.准备装卸Preparation for loading/discharging
2.首末次开盖舱First opening& final closing of hatches
3.整理吊杆 Rigging derricks.
4.清扫舱(船员/工人清扫)Cleaning holds (by crew members/shore labors)
5.铺垫舱 Dunnaging and matting
6.水密检验通过 Water tight test pasd
7.接油管 Connecting oil pipes
8.拆油管 Disconnecting pipes
9.搭雨蓬 Erecting rain tents
10.拆雨蓬 Taking off rain tents
11.搭防动设备 Erecting grain fitting (at hatch NO…)
同意的英文12.搭防动板 Erecting shifting boards(at hatch No…)
13.拆防动板 Dismantling shifting boards(at Hatch No…)
14.工人上船做准备 Stevedore boarded for preparation of holds
15.商检人员上船验舱 Cargo Surveyors boarded for inspection of holds
16.验检不合格 Inspection of holds not pasd
17.验舱合格 Inspection of holds
18.第X舱商检合格 Hold No. X inspection pasd
19.全部货舱通过 All holds inspection pasd
20.安放漏斗 Erecting feeders
三、 装卸作业
1. 开始安装 Loading/discharging commenced1. 继续安装 Loading/discharging continued
2. 恢复装卸 Loading/discharging resumed
resolution是什么意思3. 暂停装卸 Loading/discharging suspended
4. 在雨蓬下装卸 Loading/discharging under rain tents
5. 开几条路(几个头)装卸 Loading/discharging with …gangs
6. 装卸完毕 Loading/discharging completed
7. 公估 Determine the quantity of cargo loaded by draft survey
8. 卸地脚 Discharging cargo sweepings
9. (特殊)平舱 (Special)trimming of cargo
10. 扫舱 Sweeping holds在线学习英语的网站
11. 等驳船 (车皮) Awaiting lighters/wagons
12. 等加载 Awaiting arrangement for additional cargo
13. 等待租方装货安排 Awaiting Charters’ loading arrangement
14. 等待租方装货安排 Awaiting shifting
15. 等候舱口照明 Awaiting cargo lights
16. 因XX原因装/卸暂停 No work (Loading/discharging suspended) due to…
四、 装卸时间
1. 递交NOR Notice of Readiness tendered
2. 接受NOR Notice of Readiness accepted
3. 收到NOR Notice of Readiness received
4. 开始计算时间 Time commenced received
5. 用于装/卸的时间 Time ud for loading/discharging
6. 不计时间 Time not to count
7. 按租约不计时间 Time not to count
8. 扣除1/5时间 Time deducted by 1/5
9. 星期日不计时间 Time not count on Sunday
10. 元旦、春节、“五一”、国庆节不计时间 New Year’s Day/Spring Festival/May day/National Day of People’s Republic of China, time not Count
11. 星期六下午不计时间 Saturday afternoon, time not to count
12. 例假日前一天XX时不计时间 The day before holiday, time not to count after…hours
13. 例假后一天8小时前不计时间 The day after holiday, time not to count before 8 a. m
14. 星期一8时起前不计时间 Monday, time not to count before a.m
15. 星期一从8时起算时间 Monday, time to count from 8.am
16. 冷却吸扬机时间 Time for cooling the motor of sucker
17. 装卸重货时间 Time not to count for loading/discharging heavy lifts
18. 雨蓬下装卸不计时间 Loading/discharging under rain tents, time not to count
19. 雨蓬下装卸,时间按50%计算 Loading/discharging under rain tents, time 50% to coun
t
五、 因气象、船舶属具原因停工
1. 因雨停工 Suspended loading/discharging due to rain/snow
2. 因间断下雨停工 Suspended loading/discharging due to intermittent rain
3. 因防下雨停工 Suspended loading/discharging due to precaution against rain
4. 天快下雨 Suspended loading/discharging due to threatening weather
5. 因潮水上码头停工 Suspended loading/discharging due to tide flooding over the wharf
6. 因台风信号升挂停工 Suspended loading/discharging due to hoisting of typhoon warning signal
西南大学是985还是2117. 因港口受台风影响而停工 Suspended loading/discharging due to the port affected by typhoon
8. 台风警报解除Typhoon Alarm relead
9. 因扫沟水停工 Suspended loading/discharging due to sweeping of the bildge 欧美电影大全
10. 因扫雪停工 No work due to sweeping of snow
11. 移至…避风 Shifting to…for taking shelter against typhoon/storm
12. X舱因绞车故障停工 Loading/discharging suspended in hatch NO…Due to winch breakdown(trouble)
13. X舱因吊货钢丝故障停工 Loading/discharging suspended in Hatch NO…Due to cargo Runner trouble.
14. X舱因硬尾绳故障停工 Loading/discharging suspended in hatch NO…Due to winch breakdown(trouble)you are stupid