FIRST ARTICLE INSPECTION REPORT SUPPLIER PART
1. DATE
     
2. PAGE
1 OF     
3. PART NUMBER
     
4. PART NAME
     
5. PO AND ITEM NUMBER
     
6. PROGRAM
     
7. SUPPLIER NAME
     
8. SUPPLIER ADDRESS
     
9. SUPPLIER CODE
     
10. DWG/PL/E.O.
11. SHT
12. REV
13. BUYER TOOLING
14. BUYER PLAN REVISION
     
     
   
   
     
15. MATERIAL TYPE AND TEMPER
     
     
   
   
     
16. MATERIAL HEAT LOT NUMBER
     
     
   
   
     
17. SUPPLIER MFG PLAN REV & DATE
     
     
   
   
     
BUYER APPROVAL OF SUPPLIER MFG PLAN REQ’D: 
YES        NO
     
   
   
18. I & R REQ
YES          NO
19. ACCEPTANCE TEST PROCEDURE (ATP) & REV
     
     
   
   
CONTROL NO.
     
BUYER APPROVED ATP REQ’D:
YES        NO
20. HARDNESS:        REQ’D.
     
ACTUAL
     
21. CONDUCTIVITY:    REQ’D.
     
ACTUAL
     
LIST IN CHRONOLOGICAL ORDER THE SEQUENCE OF ALL REQUIRED PROCESSES
22. PROCESS PERFORMED
23. SPEC
24. REV
25. DATE PROCESSED
26. SUPPLIER/PROCESSOR
27. CERT NO.
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
免费考研论坛网     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
28. ADDITIONAL INFORMATION - BLUE PRINT NOTES, KEY CHARACTERISTICS, MANUFACTURING PLAN APPROVALS, PLANNING REQUIREMENTS, DIGITAL DATA, GRAIN DIRECTION, ETC.
     
29. PART SERIAL NO.
together是什么意思     
30. SIGNATURE    DATE    STAMP
     
31. BUYER MRB DOCUMENT NO.
     
32. FAI TYPE
NEW        DELTA
33. FAI RESULTS
ACCEPT        REJECT

FIRST ARTICLE INSPECTION REPORT SUPPLIER PART (DIMENSIONS)
34. PART NUMBER
     
35. DATE
     
36. PAGE
    OF      
37.
REF.
38. CHARACTERISTIC AND TOLERANCE
39. ACTUAL DIMENSION
40. ACCEPT
41. REJECT
42. PRINT LOC. ZONE
43. INSP.
MEDIA
44. REMARKS
     
六级及格线     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     代理人英文
     
     
     
     
     
     
     
     
     
     
     
     
樱花国际日语怎么样
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     
     

FIRST ARTICLE INSPECTION REPORT SUPPLIER PART (FAIR)
INSTRUCTIONS FOR PREPARATION AND PERFORMANCE
Assure the supplier has completed the FAI report in accordance with the following instruction and submit to Northrop Grumman.  U black ink when completing this form.  Where a change must be made to existing data on the FAI form, draw a single line through existing data and initial.
英语故事下载
FORM FIELD
ENTRY
1. DATE
Enter date of FAI.
2. PAGE
Enter total number of pages included in the FAI report.
3. PART NUMBER
Enter the part number for the part submitted for evaluation.
4. PART NAME
Enter the nomenclature of part, per Engineering.
5. PO AND ITEM NUMBER
Enter the purcha order and line item number.
6. PROGRAM
Enter the program engineering designation, e.g. B-2, F-18, F-5, E-2C, etc.
7. SUPPLIER NAME
Enter the supplier name
8. SUPPLIER ADDRESS
Enter the supplier address
9. SUPPLIER CODE
Enter the supplier number (from Northrop Grumman purcha order)
10. DRAWING/PL/E.O.
Enter the engineering (including functional specification and digital media) drawing ud.  Include sheet(s) and parts list revision(s).
11. SHT
Enter the drawing sheet number noted on the drawing.
12. REV
Enter the drawing revision listed/noted on the drawing.
13. BUYER TOOLING
If buyer furnished tooling is ud for manufacturing and/or product acceptance, enter the complete tool number(s) and tool code(s).
14. BUYER PLANNING REV
Enter the latest revision of the Northrop Grumman planning being ud.
15. MATERIAL TYPE & TEMPER
Enter alloy and temper for material utilized.
16. MATERIAL HEAT LOT NO.
Enter the heat lot/batch number for material utilized.
17. SUPPLIER MFG PLAN,
REVISION AND DATE
Enter the supplier’s planning control / identification number, revision level, and date. Indicate if buyer approval is required by checking the applicable block.
18. I&R REQ
Check the applicable block.  If yes, enter applicable control number identifier.
19. ACCEPTANCE TEST PROCEDURE & REVISION
Enter the acceptance test procedure number and revision level. Indicate if buyer approval is required by checking the applicable block.
20. HARDNESS
Enter required range and actual range of results.
21. CONDUCTIVITY
Enter required range and actual range of results.
22. PROCESS PERFORMED
Enter the process name applicable to the engineering drawing requirement.  See “Required Process” on page 2 of the instructions.
23. SPEC收敛函数
Enter the specification that defines the process requirement per the engineering drawing.
24. REV
Enter the revision of the specification that was ud to perform the process.
25. DATE PROCESSED
Enter the date that the material was procesd.
26. SUPPLIER/PROCESSOR
Enter the name of the supplier who performed the process listed/called out on the drawing.
27. CERT NO.
Enter the certification number that is noted on the certification received from the supplier.
28. ADDITIONAL INFORMATION
Reference all applicable blue print notes, specific planning requirements, manufacturing and or qualification plans requiring buyer or customer approval, key characteristic requirements, grain direction, etc., in this ction that have not been identified in other form fields.
29. PART SERIAL NO
Enter part rial number(s) if applicable.
30. SIGNATURE, DATE, STAMP
Enter signature, date and acceptance stamp.
31. BUYER MRB DOCUMENT NO.
我愿意i do片尾曲Enter the Buyer MRB document number when one is initiated for a nonconforming condition (I.E., K-Tag, SMRR, NT, MES Tag).  The First Article is not considered complete until all nonconforming conditions have been satisfactorily answered and/or eliminated.
32. FAI TYPE
Indicate if the FAI report documents a ‘New’ First Article or a ‘Delta’ First Article by checking the applicable block.
33. FAI RESULTS
Indicate the FAI results by checking the applicable block.

FIRST ARTICLE INSPECTION REPORT SUPPLIER PART (FAIR)
INSTRUCTIONS FOR PREPARATION AND PERFORMANCE CONTINUED
DIMENSIONS PAGE
FORM FIELD
ENTRY
34. PART NUMBER
Enter the part number for the part submitted for evaluation.
35. DATE
Enter date of FAI.
36. PAGE
Enter the page number and total number of pages included in the FAI report.
37. REFERENCE
Enter the characteristic reference number. A unique identifier traceable to each characteristic or requirement of the engineering drawing.
38. CHARACTERISTIC AND TOLERANCE
List all (100%) dimensions and the tolerance of each characteristic shown on the engineering drawing.
39. ACTUAL DIMENSION
List actual dimension measured during evaluation.
topis40. ACCEPT
Stamp block if actual dimension is within drawing tolerance.
41. REJECT
Stamp block if actual dimension is out of drawing tolerance.
42. PRINT LOC. ZONE
Enter the drawing zone location of the dimension.
43. INSPECTION MEDIA
List type of instrument or equipment ud to perform inspection.
44. REMARKS
Enter any additional information that clarifies the inspection operation.
REQUIRED PROCESSES - Enter in chronological and quential order ALL process and testing required by the engineering and/or specifications for part manufacture and acceptance including organic coatings.  Process such as metal finishing, heat treatment, stress relief, shot peening, hot forming, bearing staking, hole coining, chem-milling etc., shall be included in the First Article inspection process.  Suppliers are responsible for assuring that all process are performed and in total compliance with the engineering / specifications including sub-specifications.  Objective evidence of compliance is required for all products produced for Northrop Grumman.  This objective evidence must include, as a minimum, the process specification nomenclature, number and revision level, processor identity, test reports / coupons (when applicable) and Certificate of Compliance for the procesd item(s). U of the Approved Special Processors List (ASPL) and/or other NG customer required special processors (located in OASIS ) in accordance with SQAR is mandatory.  Ensure that approved special processors are approved specifically for process employed.
NOTE:  First Article Inspection Reports for Major Components and Asmblies, Structures Asmblies, and Functional Asmblies are a compilation of all detail parts/components (each having their own First Article Inspection Resort) and associated asmbly requirements summarized into a Top Asmbly First Article Report.
Events that require partial (delta) or complete re-accomplishment of the FAI for affected characteristics include, but are not limited to:
A Whenever there is a change in the design affecting form, fit, or function of the part.
B Whenever a change in manufacturing process, location, tooling, or materials with the potential of affecting form, fit, or function.
C Whenever a change of source for any critical process or if an additional process is added.
D When required as part of corrective action for a part number with repetitive rejection history.
E Whenever there is a change in numerical control program or translation to another type machine.
F Following a natural or man-made occurrence, which may adverly affect the manufacturing process.
G When a lap in production occurs for a period longer than that allowed by the customer.
H When there was a nonconformance prent during the original FAI, and has been subquently corrected, a delta FAI is required for the corrected non-conforming condition.

本文发布于:2023-05-31 10:22:12,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/129176.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:考研   樱花   故事   收敛   片尾曲
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图