FIRST ARTICLE INSPECTION REPORT SUPPLIER PART | 1. DATE | 2. PAGE 1 OF | |||||||||||||||
3. PART NUMBER | 4. PART NAME | 5. PO AND ITEM NUMBER | 6. PROGRAM | ||||||||||||||
7. SUPPLIER NAME | 8. SUPPLIER ADDRESS | 9. SUPPLIER CODE | |||||||||||||||
10. DWG/PL/E.O. | 11. SHT | 12. REV | 13. BUYER TOOLING | 14. BUYER PLAN REVISION | |||||||||||||
15. MATERIAL TYPE AND TEMPER | |||||||||||||||||
16. MATERIAL HEAT LOT NUMBER | |||||||||||||||||
17. SUPPLIER MFG PLAN REV & DATE | |||||||||||||||||
BUYER APPROVAL OF SUPPLIER MFG PLAN REQ’D: YES NO | |||||||||||||||||
18. I & R REQ YES NO | 19. ACCEPTANCE TEST PROCEDURE (ATP) & REV | ||||||||||||||||
CONTROL NO. | BUYER APPROVED ATP REQ’D: YES NO | ||||||||||||||||
20. HARDNESS: REQ’D. | ACTUAL | 21. CONDUCTIVITY: REQ’D. | ACTUAL | ||||||||||||||
LIST IN CHRONOLOGICAL ORDER THE SEQUENCE OF ALL REQUIRED PROCESSES | |||||||||||||||||
22. PROCESS PERFORMED | 23. SPEC | 24. REV | 25. DATE PROCESSED | 26. SUPPLIER/PROCESSOR | 27. CERT NO. | ||||||||||||
免费考研论坛网 | |||||||||||||||||
28. ADDITIONAL INFORMATION - BLUE PRINT NOTES, KEY CHARACTERISTICS, MANUFACTURING PLAN APPROVALS, PLANNING REQUIREMENTS, DIGITAL DATA, GRAIN DIRECTION, ETC. | |||||||||||||||||
29. PART SERIAL NO. together是什么意思 | 30. SIGNATURE DATE STAMP | ||||||||||||||||
31. BUYER MRB DOCUMENT NO. | 32. FAI TYPE NEW DELTA | 33. FAI RESULTS ACCEPT REJECT | |||||||||||||||
34. PART NUMBER | 35. DATE | 36. PAGE OF | |||||||
37. REF. | 38. CHARACTERISTIC AND TOLERANCE | 39. ACTUAL DIMENSION | 40. ACCEPT | 41. REJECT | 42. PRINT LOC. ZONE | 43. INSP. MEDIA | 44. REMARKS | ||
六级及格线 | |||||||||
代理人英文 | |||||||||
樱花国际日语怎么样 | |||||||||
FORM FIELD | 英语故事下载ENTRY | |
1. DATE | Enter date of FAI. | |
2. PAGE | Enter total number of pages included in the FAI report. | |
3. PART NUMBER | Enter the part number for the part submitted for evaluation. | |
4. PART NAME | Enter the nomenclature of part, per Engineering. | |
5. PO AND ITEM NUMBER | Enter the purcha order and line item number. | |
6. PROGRAM | Enter the program engineering designation, e.g. B-2, F-18, F-5, E-2C, etc. | |
7. SUPPLIER NAME | Enter the supplier name | |
8. SUPPLIER ADDRESS | Enter the supplier address | |
9. SUPPLIER CODE | Enter the supplier number (from Northrop Grumman purcha order) | |
10. DRAWING/PL/E.O. | Enter the engineering (including functional specification and digital media) drawing ud. Include sheet(s) and parts list revision(s). | |
11. SHT | Enter the drawing sheet number noted on the drawing. | |
12. REV | Enter the drawing revision listed/noted on the drawing. | |
13. BUYER TOOLING | If buyer furnished tooling is ud for manufacturing and/or product acceptance, enter the complete tool number(s) and tool code(s). | |
14. BUYER PLANNING REV | Enter the latest revision of the Northrop Grumman planning being ud. | |
15. MATERIAL TYPE & TEMPER | Enter alloy and temper for material utilized. | |
16. MATERIAL HEAT LOT NO. | Enter the heat lot/batch number for material utilized. | |
17. SUPPLIER MFG PLAN, REVISION AND DATE | Enter the supplier’s planning control / identification number, revision level, and date. Indicate if buyer approval is required by checking the applicable block. | |
18. I&R REQ | Check the applicable block. If yes, enter applicable control number identifier. | |
19. ACCEPTANCE TEST PROCEDURE & REVISION | Enter the acceptance test procedure number and revision level. Indicate if buyer approval is required by checking the applicable block. | |
20. HARDNESS | Enter required range and actual range of results. | |
21. CONDUCTIVITY | Enter required range and actual range of results. | |
22. PROCESS PERFORMED | Enter the process name applicable to the engineering drawing requirement. See “Required Process” on page 2 of the instructions. | |
23. SPEC收敛函数 | Enter the specification that defines the process requirement per the engineering drawing. | |
24. REV | Enter the revision of the specification that was ud to perform the process. | |
25. DATE PROCESSED | Enter the date that the material was procesd. | |
26. SUPPLIER/PROCESSOR | Enter the name of the supplier who performed the process listed/called out on the drawing. | |
27. CERT NO. | Enter the certification number that is noted on the certification received from the supplier. | |
28. ADDITIONAL INFORMATION | Reference all applicable blue print notes, specific planning requirements, manufacturing and or qualification plans requiring buyer or customer approval, key characteristic requirements, grain direction, etc., in this ction that have not been identified in other form fields. | |
29. PART SERIAL NO | Enter part rial number(s) if applicable. | |
30. SIGNATURE, DATE, STAMP | Enter signature, date and acceptance stamp. | |
31. BUYER MRB DOCUMENT NO. | 我愿意i do片尾曲Enter the Buyer MRB document number when one is initiated for a nonconforming condition (I.E., K-Tag, SMRR, NT, MES Tag). The First Article is not considered complete until all nonconforming conditions have been satisfactorily answered and/or eliminated. | |
32. FAI TYPE | Indicate if the FAI report documents a ‘New’ First Article or a ‘Delta’ First Article by checking the applicable block. | |
33. FAI RESULTS | Indicate the FAI results by checking the applicable block. | |
DIMENSIONS PAGE | |||
FORM FIELD | ENTRY | ||
34. PART NUMBER | Enter the part number for the part submitted for evaluation. | ||
35. DATE | Enter date of FAI. | ||
36. PAGE | Enter the page number and total number of pages included in the FAI report. | ||
37. REFERENCE | Enter the characteristic reference number. A unique identifier traceable to each characteristic or requirement of the engineering drawing. | ||
38. CHARACTERISTIC AND TOLERANCE | List all (100%) dimensions and the tolerance of each characteristic shown on the engineering drawing. | ||
39. ACTUAL DIMENSION | List actual dimension measured during evaluation. | ||
topis40. ACCEPT | Stamp block if actual dimension is within drawing tolerance. | ||
41. REJECT | Stamp block if actual dimension is out of drawing tolerance. | ||
42. PRINT LOC. ZONE | Enter the drawing zone location of the dimension. | ||
43. INSPECTION MEDIA | List type of instrument or equipment ud to perform inspection. | ||
44. REMARKS | Enter any additional information that clarifies the inspection operation. | ||
REQUIRED PROCESSES - Enter in chronological and quential order ALL process and testing required by the engineering and/or specifications for part manufacture and acceptance including organic coatings. Process such as metal finishing, heat treatment, stress relief, shot peening, hot forming, bearing staking, hole coining, chem-milling etc., shall be included in the First Article inspection process. Suppliers are responsible for assuring that all process are performed and in total compliance with the engineering / specifications including sub-specifications. Objective evidence of compliance is required for all products produced for Northrop Grumman. This objective evidence must include, as a minimum, the process specification nomenclature, number and revision level, processor identity, test reports / coupons (when applicable) and Certificate of Compliance for the procesd item(s). U of the Approved Special Processors List (ASPL) and/or other NG customer required special processors (located in OASIS ) in accordance with SQAR is mandatory. Ensure that approved special processors are approved specifically for process employed. NOTE: First Article Inspection Reports for Major Components and Asmblies, Structures Asmblies, and Functional Asmblies are a compilation of all detail parts/components (each having their own First Article Inspection Resort) and associated asmbly requirements summarized into a Top Asmbly First Article Report. | |||
本文发布于:2023-05-31 10:22:12,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/90/129176.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |