Inspection Items 检查项目 | 货款两讫Results 结果 | Date Corrected 整改日期 | Remarks 备注 | ||
Horizontal Track Move 平移井搬迁 四级题型 | Yes是 | No否 | N/A 无关 | ||
Skidding device is good condition. 平移装置状况良好 | ☐ | ☐ | ☐ | ||
Main parts skidding device are good condition (including The skidding device consists of the tracks, cylinders, one diel engine drive hydraulic power station, one operation unit, high pressure pipe system, etc) 平移装置主部件状况良好。(包括导轨组成,液缸、液压站、操作台、高压管线系统等等) | ☐ | ☐ | ☐ | ||
skidding device install as per requirement and easily to operate. 平移装置按照要求安装,容易操作。 | ☐ | ☐ | ☐ | ||
Pad location is good condition and The entire site should be leveled, compacted. 排井现场状况良好,整个井场是水平和压实的 yanks | ☐ | ☐ | ☐ | 典雅的意思 | |
Clean-up the barrier on the direction of rig track moving is or not 平移方向的障碍物是否被清除干净。 | ☐ | ☐ | ☐ | 扼腕||
Check the connections of derrick and substructure for reliability and deformation or not.检查井架和底座连接是否可靠和变形。 | ☐ | ☐ | ☐ | ||
clean up sundries on the rig floor . 钻台杂物清理干净 | ☐ | ☐ | ☐ | ||
fix moving parts is or not. 移动部件被固定与否。 | ☐ | ☐ | ☐ | ||
mscdCheck all bolts are fix and no loosing connection. 检查所有螺杆连接固定良好无松动。 | ☐ | ☐ | ☐ | ||
Law down rat hole and mou hole. 大小鼠洞已被甩下。 | ☐ | ☐ | ☐ | ||
Remove oil, water, air, cable connections which do not move together. 移除不和搬迁一起的油、水、气管线和电缆 | ☐ | ☐ | ☐ | ||
Remove V-door, cat-walk, emergency egress, stair ca, electric elevator etc. 大门坡,跑道,逃生滑道,梯子和电梯等被移除。 | ☐ | ☐ | ☐ | ||
Move flow line, mud gas parator, BOP control unit and control lines, cement tank and lines, catching tanks and lines to next well position. 高架槽,液气分离器、BOP控制管线、固井罐和管线,跟踪罐和管线被搬到下口井的位置。 | ☐ | ☐ | ☐ | 新东方背单词||
Hold safety meeting pre-pad rig move 平移井搬迁前是否召开安全会。 | ☐ | ☐ | ☐ | ||
the personnel is proper arrange and clear onelf responsibility or not. 人员是否被合理分工并了解自己的职责。 | ☐ | ☐ | ☐ floorplan | ||