Type Test Report for HIVERT-Y 6kV 96A System 合康高压变频器测试报告(英文版)

更新时间:2023-05-22 04:13:03 阅读: 评论:0

Reference No.: 2003 Electrical Test 018
cnn chinaTian Jin Test Institute for Generating & Distribution & Electric Control Equipment
China National Center for Quality Supervision and Test of Electrical Control and
LV Distribution Equipment (CECDE)
1DPH  0HGLXP 9ROWDJH 9DULDEOH )UHTXHQF\ 'ULYH
7\SH                +,9(57 <
&RQVLJQPHQW 8QLW    :XKDQ +LFRQLFV 7HFKQRORJ\ &R  /WG
.LQG RI 7HVW        &RQVLJQPHQW 7HVW
China National Center for Quality Supervision and Test of Electrical Control and LV Distribution Equipment
TESTING  REPORT
Reference No.: 2003 Electrical Test 018  7RWDO    3DJHV    3DJH
Name
Medium Voltage Variable Frequency Drive Trademark / Type
HIVERT-Y06/096Rated Voltage: 6000V    Capacity: 1000kVA Main
Technical
战略的构成要素有哪些
Data
Rated Current:  96A Kind of Test
Consignment Test Consignment
Unit
Wuhan Hiconics Technology Co., Ltd. Address of
Consignment
Unit
4th Floor 3 Yejin Rd., Qinshan District, Wuhan Production
accurate什么意思
Unit
Wuhan Hiconics Technology Co., Ltd. Address of
Production
Unit
4th Floor 3 Yejin Rd., Qinshan District, Wuhan Sampling
Place
/Sampler /Sample Provider Qiuquan Chen Sampled
Quantity
/Sampling Basic /Production Date on-site Sampling
Date
/Arrival Date Sample No.
2003DK005Letter of Authorization 2003-Z018Inspection
Basis
Q/HC02-2002  Technical Condition of HIVERT-Y Range Medium Voltage Variable Frequency Drive Inspection
Date March 4, 2003 - March 8, 3003
Inspection
Conclusion
According to 18 inspection items, the product complies with
the inspection basis. Therefore, the consignment Test is pasd. Issue Date: March 11, 2003
Remarks For inspection items, e page 2.
Approver ˖                      Auditor ˖                        Editor:
zipperChina National Center for Quality Supervision and Test of Electrical Control and LV Distribution Equipment
TESTING  REPORT
Reference No.: 2003 Electrical Test 018
Summary Sheet of Inspection Item and Conclusions7RWDO    3DJHV  3DJH
No. Inspection/Test
Item Conclusion
Page
1General Examination (Clearance and Creepage
拉丁语翻译Distance, Safety Grounding, etc.)
Check out 3-4
2 Protection Level Test Check out    5
3 Insulation
Resistance Test Check
out
6 4 Light-load
Test Check
out 7
5 Load余下
Test Check
out 9
6 Rated Output V oltage Test Check out 8
7 Unbalance Level of Output V oltage Test Check out 8
8 Harmonic Content of Output V oltage and Current Test Check out 10-17
9 Harmonic Content of Input V oltage and Current Test Check out 18-24
10 Rated Output Frequency Test Check out 8
11 Adjustable Range of Frequency Test Check out 25
12 Precision Test of Frequency Stability Check out 26
13 Frequency Resolution Test Check out 27
14 Continuously Running Test Check out 28
15 Startability
Test Check
out 29-30
16 Efficiency
Test Check
out 31
17 Power Factor Test Check out 31
18 Cooling Performance Test Check out 32
Auditor˖Xia Liu  Editor: Shumin Liu
China National Center for Quality Supervision and Test of Electrical Control and LV Distribution Equipment
TESTING  REPORT 7RWDO    3DJHV    3DJH
Reference No.: 2003 Electrical Test 018General Examination Test Date: March 4, 2003
issue是什么意思
Inspection Basis: Product Technical Requirement 4.3.1; 4.3.11; 4.3.14; 4.3.21
Sample No.: 2003DK005Items Test Content
Structure Test
The structure of device is modular type. By means of electrostatic spraying,
there is even coat of molding power on cabinet body with non-reflection. In the
front of master control cabinet, there is HMI, red button for high voltage break, blue
button for system ret, yellow button for alarm stop, green button for industrial
frequency switch, black button for remote/local switch. There is red alarm lamp on
the top.
There are 18 units in power cell cabinet and 2 air blowers (200W) above it.
Serial bus of power cell is flexible circuit conductor (20h 2mm 2). There are 2 air
中韩互译在线翻译器blowers (200W) above transformer cabinet and temperature display unit on it with
temperature adjustment function.
There is gate lock and pha-quence label. When the door of transformer
cabinet or master control cabinet is open, alarm runs. Outlet and inlet wires of
device and power cell are black flexible circuit conductor (6mm 2). Ground wires are
yellow-green double colored wire (6mm 2).
Overall dimension satisfies the design requirement. Measured Value (mm) Electric Clearance Creepage Distance Measuring Points
Prescribed Value Measured Value Prescribed Value Measured Value Between input (transformer) A and B > 50 145 > 125 145 Between input A (transformer) and ground
> 50 126 > 125 126 Between fu inlet wire/ pha A of
unit 4 (power cell cabinet) and ground
t 35 35  /Between pha A outlet wire of unit 5
(power cell cabinet) and ground t 35 115  /
Between output C (VFD) and ground  / > 125 170 Clearance andidol是什么意思
Creepage
Distance Between output (VFD) A and C > 50 160
Max. Grounding
Resistance (:)Measuring Points Prescribed Value Measured
Value
Between PLC (master control cabinet) and ground İ0.1 0.00237Between framework of terminal blocks  (master control
cabinet) and ground
İ0.1 0.00324Between right framework (transformer) and ground
平和国际学校İ0.1 0.00425Between shell of air blower and ground  İ0.1 0.00328
Safety
Grounding Ground wires: 6mm 2 yellow-green double colored wires; M8, grounding label.
Conclusion: Check Out
Auditor ˖Xia Liu                        Editor: Shumin Liu

本文发布于:2023-05-22 04:13:03,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/117869.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:要素   学校   构成   国际
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图