SAP月末结帐步骤,包含CKMLCP等具体使用

更新时间:2023-05-19 12:03:25 阅读: 评论:0

SAP 月末结帐步骤(2009-05-13 00:42:57)
SD Relevant Steps:
1.Check if all delivery in due list have been procesdVL06G (Could t background jobs to automatically generate the billing due list for posting)
2.Check if all picking in due list have been procesdVL06P
3.Check if all goods issue in due list have been procesdVL04
4.Check if all billed AR has been relea to accountingVFX3
 
PP Relevant Steps:
1.Check if all back flash error has been solved (COGI Check every day this kind of problem and solved on time)
2.Check if all production orders that will not be followed have been finally confirmed or technically clod. Do final confirmation even small quantity variance exist but we consider this order has finished
3.Do technical clo at month end for the orders will not be followed in the future
4.Confirmation. Do not confirm any asmbly scrap when do production order conf.
father的音标 
MM Relevant Steps
1.Check if all goods movement has been booked in SAP美丽中国梦
2.GR/IR clearing accounts maintenance if needed
3.Open the MM period for movement posting when new period starts MMPV
 
桥头堡是什么意思
FI Relevant Steps
1.Book all accounting entries for:
my hump- Accrued expen
- Do recurring entry (prepayment, accrued expen, amortization)
- Process G/L, vendor, customer balance & open items
- Cost allocations by FI
2.AM Fixed ast depreciation run and period postingAFAB
3.AM Periodic posting ASKB
4.G/L,AR,AP balance check & Open item clearing
5.Foreign currency ruation for bank/cash & AR AP open items
Bank/cash ruation: F.06
AR AP open items: F.05
6.GR/IR clearing account regrouping process F.19
7.Automatic clearing for G/L accounts, vendor and customer F.13
 
CO Relevant Steps
1.Relea standard cost estimate
CK24Only when there are costing run to be relead.
2.Cost reallocation according to activity
Distribution: CKV5
Asssment: KSU5
3.Cost splitting among activity KSS2
4.Actual activity price calculation KSII
5.Production order ruation with actual activity price CON2
6.WIP calculationfor the production orders KKAO四六级成绩公布的时间2021
prism7.Variance calculation for the production orders KKS1
8.Production / Costing orders ttlement CO88/KO88
9.Material ledger closing > MMPV first
a.Create costing runCKRU00
b.Allow ttlementCKMF_RUN
c.Allow closing entriesCKMG_RUNout from under
d.Material lectionCKMB_RUN
e.Determine costing quenceCKMC_RUN
f.Settle single levelCKMH_RUN
g.Settle multi levelCKMM_RUN
h.Post closingCKMI
 
 以下面这个为准吧:
财务月结步骤:

月末最后一天:

锁定所有SAP用户(除少数需要处理月结操作财务用户外)  SU10
停止物料出入库
月末费用过账、分摊分配等
作业价格重估  CON2
过去完成时态在制品计算  KKAO
生产订单结算  CO88
所有用户冻结,只留一个操作用户  SU10
物料账月末处理:选择        bullshit什么意思中文CKMLCP 
物料账月末处理:确定顺序    CKMLCP
物料账月末处理:单级处理确定  CKMLCP
检查单级处理确定中的错误(如果处理中发现错误,并进行了修改,请重新从“物料账月末处理:选择        CKMLCP”开始操作)
物料账月末处理:多级处理确定  CKMLCP
检查单级处理确定中的错误 (如果处理中发现错误,并进行了修改,请重新从“物料账月末处理:选择        CKMLCP”开始操作)
产品成本估算  :          CK40N
物料价格标记            CK24/CK40N
打开物料期间            MMPV (打开期间前,必须已处理完所有的单级及多级的错误,仍然打开的是零)
物料价格下达            CK24/CK40N  (价格下达必须在物料账月末处理-记账清算前)
物料账月末处理:记账清算    CKMLCP测试运行)(此步骤必须先测试运行)
检查物料账月末处理是否正确   
物料账月末处理:记账清算    CKMLCP  (正式运行) 

查询物料账相关报表,检查数据是否正确。

月末处理结束。打开锁定用户
SAP方丈-FI-月结年结备忘录
一年一度的年度结算,哈哈,不知道这样的念经每天到底是为了什么?又是新的一年,是否还需要继续念经呢?
[原创]SAP方丈-年度结算的步骤
年度结算的步骤

1、执行月度结算 (财务人员)
按照平常月度执行月度结算
相关链接:月度结算

2、新的年度会计凭证号码范围是否已经维护(内部顾问)
FBN1查询凭证号码范围的跨及年度、OBH2的跨维护会计凭证号码到新的会计年度
3、检测成本中心、成本要素、作业类型有效期(内部顾问)
    使用事务代码KS13检查成本中心的有效期,并作维护;
    初级英语听力使用事务代码KA23检查成本要素的有效期,并作维护;
    使用事务代码KL03检查作业类型的有效期,并作维护。
    使用事务代码F.07结转应收应付。
4、科目余额结转[T-CODE:F.16/FAGLGVTR] (财务副主任)
将总分类帐会计科目余额结转至新的会计年度
5、利润中心余额结转[T-CODE:2KES] (财务副主任)
将利润中心余额结转到新的会计年度
6、固定资产年结[T-CODE:AJAB/AJRW] (财务副主任)
结转资产余额到新的会计年度
7、核对明细帐与总帐数据 F.03(财务副主任)
8、确认新的会计制度,是否需要新添会计科目 FS00(财务副主任)

本文发布于:2023-05-19 12:03:25,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/90/114522.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:处理   物料   结算
相关文章
留言与评论(共有 0 条评论)
   
验证码:
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图