Revision History 更改记录 |
Rev 版本 | Change 更改内容 | Writing By 编写 | Date 日期 |
01 | New relea | Jason Yan | 2011-4-20 |
Department Head Approve 部门经理批准 |
Signature Date Signature Date Originator: Manufacturing: 起案者: Jason Yan 2011-4-20 制造部viney: Quality: Programmer: 质量部: 抚顺翻译公司 项目组: swear是什么意思 Engineering: HR: 工程部: 人力资源: Material: QMS: 物料部: 质量管理体系: |
Checked by: Date: 文件检查: 日期: |
Effective Date: REV.Expiry Date: 文件生效日期: 文件失效日期: |
| | | |
1.Purpo (目的)
To specify and establish the procedure of NPI build process in Electronics (Shanghai) Ingenico project.
制定NPI在伟创力(上海)Ingenico项目的生产流程。
2.Scope(使用范围)
2.1 This procedure applies to Electronics Shanghai manufacturing sites Ingenico project.
本流程适用于上海伟创力Ingenico项目。英孚口语
堰塞湖什么意思
2.2 This procedure applicable for NPI process, including Front End and Back End.
本流程适用于NPIat at流程,包括前段和后段。
3.Definition(术语)
PCBA -Printed Circuit Board Asmbly
印刷电路板
NPI -New Production Introduction
新产品导入
FA -First Article
首片(台)
PQC -Online Production Quality Inspector
在线质量检查员
WI -Work Instruction
操作指导书
4.Responsibility(职责thereare)
4.1 Program
4.1.1 PM/PA is leader for NPI activities, is responsible to get the NPI build plan and update 3 months forecast monthly to team member.
PM/PA作为NPI活动的主导者,负责获得NPI活动的计划并每月更新后三个月的计划给各成员。
4.1.2 PM/PA as acting leader of preparation stage, is responsible to call kick-off meeting two months before the build schedule while some brief info could be found on FTP site, especially for new technology introduced.
PM/PA负责主导NPI活动的准备阶段,需在新产品计划实施前的2个月召开第一次准备会,并负责将产品的基本信息放在公共网址上,特别是关于新技术引进的信息。
4.1.3 PM/PA is responsible to make sure all necessary items are ready according to project tracker log at least two weeks before build schedule.
PM/PA负责在新产品实施前2周确认产品信息追踪表上的各项必备信息齐全、完整。
4.1.3 PM/PA is the responsible for solves ECO & TIP issues during NPI on time.
PM/PA负责解决在新产品实施过程中新的ECO&TIP所产生的问题。
4.1.4 PM/PA is responsible to collect NPI reports and submit to customer for approval.
PM/PA负责收集NPI的报告并发给客户确认。
4.2 Quality
4.2.1 Quality engineer generate Q-Plan by product Family.
质量工程师负责根据产品制作Q-Plan.
4.2.2 Quality engineer is responsible to confirm the flow chart and ensure flex flow was correctly t into system before production build according to information provided by process engineer.
QE负责根据PE提供的信息在新产品生产实施前建立Flex flow系统并确认流程图。
4.2.3 Quality engineer is responsible to generate FC and OBA WI, training operator on line.
QE负责制作FC和OBA的操作指导书,在线培训操作人员。
4.2.4 PQC follow FA check process while product start.
屈指可数是什么意思
PQC在新产品生产开始时遵循首台确认的流程进行相应操作。
4.2.5 Quality engineer on line check production according to documents and WI in order to buy off the process.
QEbaby是什么意思英文在线确认生产活动符合文件和操作指导书的要求。
4.2.6 Quality engineer as acting leader for generate the quality report within one week after product built.
QE在新产品生产各阶段完成后一周内主导质量报告的生成。
4.3 Test
4.3.1 Functional test engineer is responsible for tting traceability system, put label mask into system and fix all system requirement. Check the label with PE.
TE海淀翻译公司负责根据客户要求设立追踪系统,将标签文件建好并完成各系统设定。同PE一起检查标签的打印符合要求。
4.3.2 Functional test engineer is responsible for tting product software download station and customization software download station, related software must be installed properly on line.
TE负责软件下载和测试工位的建立,相应软件安装到位。
4.3.3 Functional test engineer is responsible for generate Wintest WI and training operator on line.
TE负责制作测试操作指导书并在线培训操作人员。
4.3.4 Functional test engineer is responsible for support to analysis on defect terminals and finish quality report on related part.
TE负责支持不良产品的分析活动并完成质量报告中的相应部分。
4.3.5 Debug engineer is responsible for support to analysis on defect terminals and finish quality report on related part.
调试工程师负责支持不良产品的分析活动并完成质量报告中的相应部分。
4.4 Production
4.4.1 Prepare and check material loading for manufacture according to loading list.