顾客名称Customer name: 项目名称Project name: | |||||
设备名称Equipment name: 规格Specification: 编号Code: | |||||
检验依据: 产品工艺质量检验规程 工艺序号:QC/PR-10 Inspection according to:Product processing quality Inspection Rules. Process Code:QC/PR—10 | |||||
顾客提供钢件制作检验报告单: 交接人: Customer providing the steel structure manufacture inspection report: Agent: | |||||
钢件检验 Steel Inspection | 项 目 Project | 检测要求 Inspection requirements | 检验数据 Inspection data | 处置方法 Treatment method | 检验人员/时间 Inspector/Time |
腐蚀程度Corrosion condition | 一般锈蚀 Commonly rusty | 检验Inspection: 时间Time: | |||
焊缝平/高度 Welding am level/highness | 平Level/<2mm | ||||
飞溅焊瘤 Splash Welding nubble | 不允许存在 Not allowed | 处置计划 Treatment Plan | |||
砂眼气孔 Sand hole | 不允许存在 Not allowed | ||||
角缝打磨 Angle grinding | 棱角edge/corner angle R≥3mm 内角Internal angle R≥5mm | ||||
凹痕深度 Concave deepness | ≤0.5mm | ||||
锋口毛刺 Sharp burr | 不允许存在 Not allowed | ||||
原因分析处置Reason analysis and treatment: | |||||
返工检验 Inspection for doing poorly done work over again | 时 间 Time | 完 成 情 况 Accomplished condition | 操作人员/时间 Operator/Time | ||
补焊Repairing welding: 时间Time: 打磨Grinding: 时间Time: | |||||
最终评定Final asssment: | |||||
检验员Inspector:: 时间Time: | |||||
客户名称Customer name: 工程名称Project name: | ||
设备名称Equipment name: 规格Specification: 编号Code: | ||
检测依据:橡胶衬里产品工艺质量检验规程 工序号:QC/PR—10 Inspection according to:Rubber lining product processing quality inspection rules. Process Code:QC/PR-10 | ||
检测要求 Inspection requirements | 检 测 结 果 Inspection result | |
产品product | 试板Test plate | |
1.外观目测100% External appearance Examination by Visualization | 缺陷Shortcoming: 裂口Gap: 翘边Side raid: | 规格Specification: |
2。厚度检测Thickness test:+15%、—10% 检测仪器Instrument for Inspection: 规定值Standard: | 仪器编号Instrument No.: 实测值Reality: | 实测值Reality: |
3。火花检测Sparking test:100% 检测仪器Instrument for Inspection: 电压规定值Voltage standard: | 仪器编号Instrument No。: 实测值Reality: | 实测值Reality: |
4.硬度检测Hardness test:不少于6处 not Less than 6 positions 检测仪器Test Instrument: 规定值Standard: | 仪器编号Instrument No.: 实测值Reality: | 实测值Reality: |
5.剥离强度测试Peeling strength test: 测量仪器Test Instrument: 规定值Standard: N/mm | ||
6。粘结强度测试Bonding test: 测量仪器Test Instrument: 规定值Standard: N/mm2 | 实测值Reality: | |
硫化人员Vulcanization Operator: 修整人员Repair operator: 检验员Inspector: 时 间time: 时 间Time: 时 间time: | ||
原因描述Reason description: | ||
质量评定Quality asssment: | ||
备注Note: | ||
设备名称Project name: 编号No.: | ||
计划数量Planed quantity: 规格Specification: 批次Group No。: | 牛奶面膜怎么做||
天气Weather: 温度Temperature: 湿度Humidity: | ||
施工人员Workers: | 生产车间Workshop: | |
日 期Date: | ||
检验员Inspector: | ||
胶浆检查 Adhesive Inspection | 胶浆Adhesive : 代号Code: 制作时间Manufacture Time: 存放时间Deposited period: 浓度比Concentration ratio: 稀释剂Thinner: 粘性试验Adhesiveness test: | |
复合方式Compound way: 辊速Roller Speed: | ||
复合过程 Compound Process | 胶料Rubber material: 代 号Code: 粘合面处理 Compound surface treatment 层次Level: 要求厚度Standard Thickness : 实测厚度Actrual Thickness: | |
外观质量Surface Quality: 电火花检测Spark test: | ||
原因分析及处置Reason analysis and treatment: | ||
设备名称Project name: 规格Specification: 编号No.: | ||||||||||||
胶料Rubber Material: 代号Code: 批次Group No。: | ||||||||||||
检验依据:橡胶衬里工艺工序质量检验规程 工序号:QC/PR-01-09 Inspection according to: Rubber lining processing procedure quality inspection rules。 Procedure No。: QC/PR—01—09 | ||||||||||||
衬胶过 程 Rubber lining process | 项 目 Project | 过 程 检 验 | 项 目 | 过 程 检 验 | ||||||||
下料尺寸 Material dimension | 合格□ 不合格□ Conformity□Nonconformity□ | 坡口宽度 Slope width | 合格□ 不合格□ Conformity□Nonconformity□ | |||||||||
胶片刷浆 Brushing adhesive on rubber sheet | 合格□ 不合格□ Conformity□Nonconformity□ | 接缝宽度 Seam Width | 合格□ 不合格□ Conformity□Nonconformity□ | |||||||||
衬胶布置 Rubber lining arrangement | 合格□ 不合格□ Conformity□Nonconformity□ | 缺陷修整 Shortcoming reparing | 合格□ 不合格□ Conformity□Nonconformity□ | |||||||||
衬胶流向 swot模板Rubber lining direction | 合格□ 不合格□ 星光红宝石Conformity□Nonconformity□ | 衬后检测 Inspection after lining | 合格□ 不合格□ Conformity□Nonconformity□ | |||||||||
施工人员/时 间 Workers/Time | ||||||||||||
时间Time: 班次Team No: | 时间Time: 班次Team No: | |||||||||||
下料Material preparing: | 下料Material preparing: | |||||||||||
衬胶rubber lining: | 衬胶Rubber lining: | |||||||||||
刷浆brushing adhesive: | 刷浆Brushing adhesive: | |||||||||||
检测inspection: 电压voltage: | 检测inspection: 电压voltage: 笔记本怎么用 | |||||||||||
基体温、湿度控制记录 Body temperature & moisture control record | ||||||||||||
温度Temperature℃ | ||||||||||||
湿度Temperature % | ||||||||||||
温度Temperature℃ | ||||||||||||
湿度Temperature % | ||||||||||||
原因分析与处置Reason analysis and treatment: | ||||||||||||
检验部位Inspection position: | ||||||||||||
质量确认Quality affirmance: | ||||||||||||
单位负责人Company principal /日期Date: 施工负责人Manufacture Principal/日期Date: | ||||||||||||
设备名称Project name: 规格Specification: 编号No。: | |||||
检验依据:橡胶衬里工艺操作规程 工序号:QC/PR-01—09 Inspection according to: Rubber lining processing manufacture rules。 Procedure No。: QC/PR-01—09 | |||||
胶浆名称Adhesive name: 代号Code: | |||||
涂刷胶浆要求:基体表面涂刷三遍,第一、二遍胶浆干燥时间不低于2小时,第三 遍实际掌握,胶片表面涂刷二遍,干燥时间为15~45分钟。 Brushing adhesive requirements: brush three times for tank body surface; the adhesive drying time should be not less than two hours for the first and cond time; for the third time, do according to the fact, brush the rubber surface for two times, and dying time should be 15~45 minutes。 | |||||
步骤 Step | 操作人员 Operator | 时间 Time | 基 体 body | 质检员 Inspector | |
温度Temperature | 湿度Temperature | ||||
原因分析与处置Reason analysis and treatment: | |||||
检验部位Inspection position: | |||||
质量确认Quality affirmance: | |||||
单位负责人签字Company principal’s signature: 日期date: | 施工负责人签字Manufacture principal’s signature: 日期date: | ||||