LEED施工资料3-风机盘管-FT-FCU

更新时间:2023-06-04 23:55:38 阅读: 评论:0

Functional Test功能性测试
Project项目:________________________________________
FT-___FAN COIL-风机盘管
1. Participants参加人员
Party参加方Participation参与者一懂事就结束
General Contractor总承包商
Design设计方
Commissioning Authority调试主管
Party filling out this form and witnessing testing (填表及见证方)________________
Date of test (测试日期)_______________
2. Prerequisite Checklist(前提条件)
a. The following have been started up and startup reports and prefunctional checklists submitted and approved
ready for functional testing:__
(下面已经列出的是启动报告和预调试清单,其已经提交和获批,为功能性测试准备就绪)
中国文化知识b. __ All A/E punchlist items for this equipment corrected.
(所有相关设备的A/E整修清单均校正)
c. __ Record of All Values for Current Setpoints (SP), Control Parameters, Limits, Delays, Lockouts,
藏象学说Schedules, Etc. Changed to Accommodate Testing:
(记录下所有现有的设定值(SPt),控制参数,限值,延迟,停止,明细表等,改变以适应测试)
3. Verification of Misc. Prefunctional Checks.
各种预调试检查的验证
上英语课
Misc. site checks of the prefunctional checklist and startup reports completed successfully. Pass? Y / N _____ 预调试清单的现场检查及启动报告是否完成通过? 是/ 否_______
读书分享会__ Unit mounted curely. __ Unit accessible for rvicing. __ No unusual noi or vibration in fan.
处暑机组牢固安装机组检修空间充足风机没有不正常的噪音或振动
英语句子翻译4. Functional Testing Record
粼粼的意思是什么
功能性测试记录
Notes:
测试结束Notes:

本文发布于:2023-06-04 23:55:38,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/989785.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:测试   机组   功能性   报告   启动   调试   参加
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图