(管理与人事)GoldenSample管理办法

更新时间:2023-06-04 09:39:26 阅读: 评论:0

做不抱怨的教师过程工程研究所
機密等級:
機密
USI Controlled Document
Confidential Level:
Confidential
Document Title(文件名稱) :
Management Procedure of Golden Sample Golden Sample管理辦法
Document Number(文件編號):
AT-0801-E105
Revision(文件版本):
A6
Revi Date:
11/29/2010
Prepared by(撰寫者):
Jack shen
Create by which Unit(制定單位) :
GRM/GME/STE
AG-0801-M006-F2                                                      Rev.:A1
   
Amendment Records
舌苔红是什么原因
Item:
Date:
Revision:
Page:
Change Description:
Changed by:
1
12/07/2004
A1
All
First draft.
Eden Chu
蚕蛹是什么2
01/27/2005
A2
6,12,17,
23
1. Add red label for bad golden sample.
2. remark MSD PD1 280 power products
golden sample control system.
Belen Chen
3
含比喻的四字词语
06/30/2006
A1
34,35
All
1.To add the field for the description of the
FAULT golden sample.
2.To change the Doc. No. from
AG-0801-P027 to AT-0801-E105
3.To modify the flowchart
4.To correct the format
Emmitt Lee
4
06/20/2008
A2
1,33,34
35,36,37
1.To define the duration and verification of Golden Samples by different products.
2.To add a notice for the products which have more than one FCT process.
3.To upgrade the table(AT-0801-E105-F11) from Rev.A1 to Rev.A2.
Emmitt Lee
5
11/28/2008
恩师赠言A3
26,27
39
1.To add the item 4.2. The fabrication of Golden Sample
2.To add the GRR report
Emmitt Lee
6
04/10/2009
A4
26, 27, 38
1. Modify the occasion of Golden Sample for ction 4.1.
2. Modify the description of fabrication of Golden Sample for ction 4.2.
最新男士发型
3. Modify the Board Asmbly Manufacturing Golden Sample Label (AT-0801-E105-F11)
Eden Chu
7
12/26/2009
A5
38
26
1.Modify the Board Asmbly Manufacturing Golden Sample Label (AT-0801-E105-F11)
2.Add more explanations to 4.2.2 for Golden Sample之製作
Jackshen
8
11/30/2010
A6
鸡粪30,31
40~49
1. New Golden sample Label approved must achievement with in 24 hours.
2. To prevent Golden sample escape to customer site, need lock PCBA's rial number form SFIS.
3. PD supervisor need Lock PCBA's rial number after Receiving and signing for Golden sample.
4. Management Procedure of Board Asmbly Manufacturing Test Golden Sample For VPD Products (AUO,CMI).
Jeff Tng
AG-0801-M006-F3                                                      Rev.:A1

目    錄
Table of Content
1. 目的
Purpo
2. 適用範圍及時機
Scope and Occasion
3. 零件產品Golden Sample管理辦法 (Chine)
3.1. 適用範圍及時機
  3.2. 作業流程圖
  3.3. 作業輸入/項目. 作業規定要點. 作業輸出
  3.4. 相關文件與表單
3. Control of Component parts Golden Sample (English)
3.1. Scope and Occasion
3.2. Operation Flow
3.3. Operation input / item, key criteria, output
3.4. Related doc. And sheet
4. Management Procedure of Board Asmbly Manufacturing Test Golden Sample
4.1. 使用範圍及時機
    Scop and Occasion
4.2. Golden Sample之製作:
    The fabrication of Golden Sample
4.3. 測試治具及程式開發製作階段Golden Sample使用及管理流程圖及說明
    The flow chart and descriotion of Golden Sample usage and management in the
stage of test fixture development and fabrication
4.4. 量產階段Golden Sample使用及管理流程圖及說明
    The flow chart and descriotion of Golden Sample usage and management in the
mass production stage.
4.5. 工程變更(EC)變更時Golden Sample使用及管理流程圖及說明

本文发布于:2023-06-04 09:39:26,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/984151.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:管理   文件   流程   作業   使用   工程   項目   範圍
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图