Rasco GmbH, Geigelsteinstr. 6, 83059 Kolbermoor, Germany, Phone: +49-8031-2337-0 Internet: , Email:
SO3000 Jaguar
Customer Documentation
Installation
Installation
1Intention of this chapter (3)
2Safety notes and required equipment (3)
2.1Safety notes (3)
2.2Personal protective equipment (PPE) (3)
2.3Tools and material (4)
轻乳酪芝士蛋糕
3Shipping the packed machine (4)
4Temporary storage (4)
5Unpacking the machine (4)
6Checking for completeness (5)
7Installing the handler (5)
7.1Required working space around the handler (5)
7.2Transport safeguards (5)
7.3Move / locate the handler (6)
7.4Seismic protection (7)
7.4.1Calculations with loader/unloader (stacked) (7)
7.4.2Calculations with loader/unloader (slotted) (7)
7.4.3Center mass and weight, anchorage points (pedestals) (8)
7.5Optionally: Mount / remove soak module (9)
7.6Mount / remove loader/unloader module (12)
7.7Connect cables and hos between modules (14)
7.8Supply connection (15)
7.8.1Power supply (handler ba / soak module) (16)
7.8.2Pressure supply (handler ba) (17)
7.8.3LN2 supply (handler ba / soak module) (17)
7.9Tester interface connection (18)
7.10Customer specific ttings (18)
1 Intention of this chapter
This chapter contains information and specifications to install the handler.
It is prepared for:
•Maintenance personnel.
2 Safety notes and required equipment 2.1 Safety notes
差强人意什么意思
DANGER
水磨河村Electrical shock can result in death or rious injury.
Follow the corresponding instructions!
CAUTION
The LN2 fluid can cau burns at limb like finger or
hand.
If you connect/disconnect the LN2 ho to the handler
or soak module wear protective goggles and
protective gloves.
开黄花的植物CAUTION
Lifting of heavy equipment can cau back injury.
Follow the corresponding instructions.
CAUTION
You can crush toes or feet if a heavy module tilt over.
Follow the corresponding instructions.
CAUTION
You can get frightened through loud noi created by
leakage or damage of the pneumatic ho.
2.2 Personal protective equipment (PPE)
U the personal protective equipment (PPE) in accordance with the instructions provided by the PPE supplier.
•Protective goggles
•Protective gloves
•Safety shoes
2.3 Tools and material
•Service lamp (standard equipment fixed at the left side of handler ba front)
•Screwdrivers t
•Open wrench t
•Allen key t
3 Shipping the packed machine
The handler is shipped in a clod wooden box. The bottom of this box is a pallet for using a forklift. During transport the machine is in its normal position.
The handler must be handled with care during shipment or transfer in order to Array avoid damage to its components!
技嘉p43The following information regarding shipping and handling of the packed handler may be found on the shipping markings:
•Overall dimensions
•Gross weight
•Cautionary markings
The handler shall only be shipped by appropriate means of transport!
4 Temporary storage
If the handler is to be temporarily stored before final installation, the storage location
should narrow the following requirements in order to avoid machine damage:
•Undamaged shipment packing
•Level surface
西安培华学院是几本•Temperature range 0°C to 50°C (32°F to 122°F)
•Max. relative humidity 90%
5 Unpacking the machine
The unpacking procedure will be done only by the Rasco rvice personnel!
6 Checking for completeness
Before installing the handler, check the delivery for completeness.
U the packing list, which is included in the manual.
名言名句大全小学生7 Installing the handler
7.1 Required working space around the handler
For further information of the physical handler dimensions e manual “General – Handler specifications”!
Pos. Standing posture
SEMI minim. in mm Kneeling posture
SEMI minim. in mm
Recommended
作弊检讨书
from Rasco in mm
Width (w) 690 1220 1300
Length (l) 690 1220 800
(only standing
posture necessary) Height (h) 1980 1450 2000
Picture 1: Required body clearance and electrical clearance (top view, front view)
7.2 Transport safeguards
Check that all transport safeguards are removed.
For further information e packing/unpacking procedure!