IN ACTION ROUND THE WORLD  Herrenknecht Gripper technology can be found in action in projects all around the world for all types of tunnel u and all diameters.
RING ERECTOR  installs steel arches to
stabilize the excavated tunnel.
BUCKETS transport the excavated看淡一切无所谓的句子
rock behind the cutterhead onto a belt  conveyor system.
CUTTERHEAD  The excavation tools are mounted in the cutterhead, which also supports the tunnel face.GOTTHARD BASE TUNNEL
–  Installed power: 3,500 kW – Weight: around 220 t
SHIELD  (partial shield) supports the rock behind the cutterhead.
MESH INSTALLER  places steel mats in the
inrted bolts.
DISC CUTTERS are mounted in the cutterhead and roll in concentric circles over the tunnel face. The rock is crushed by the contact pressure.GOTTHARD BASE TUNNEL怎么删除小程序
– Weight per disc cutter: around 125 kg –  Contact pressure per disc cutter: up to 26 t
ROOF BOLTING UNIT  can be moved around the machine’s axis. Drills holes for the bolts which stabilize the rock.
BELT CONVEYOR transports the excavated
material to the end of the back-up system.
WALKING DEVICE  The rear of the TBM and the back-up systems rest on the feet of the walking device. They are lifted as tunnelling progress, and the back-up system follows.
GOTTHARD BASE TUNNEL
- Overall volume of excavated material:    around 10.5 million m³.
河水简笔画THRUST CYLINDERS brace against the gripper
乳房美容
shoes and press the rotating cutterhead against the tunnel face.
GOTTHARD BASE TUNNEL
– Thrust force: 27,488 kN total – Stroke: max. 2 m
SHOTCRETE ROBOT lines the tunnel with
shotcrete to stabilize it.
CONTROL CABIN  From here the TBM driver operates the machine and monitors tunnelling.
SELECTION OF REFERENCE PROJECTS GRIPPER TBM
TUNNEL PROJECT
Jinping Hydropower            Station II, China
Tunnel length: 15,903 m  Mumbai Freshwater Pipeline, India Tunnel lengths: 4,366 m / 1,800 m / 1,675 m / 1,900 m
CONTRACTOR
有机高分子Ertan Hydropower          Development Company Ltd.
Patel Engineering Ltd., Pratibha Industries Ltd.
MACHINE DATA开学的图片
S-405 Gripper TBM
Diameter: 12,400 mm M-1150M / M-1249M
Gripper TBM3000XH / Gripper TBM2800XH Diameters:
3,000 mm / 2,800 mm描写雪景的成语
GRIPPER CYLINDERS  press the GRIPPER PLATES  laterally against the tunnel wall.
GOTTHARD BASE TUNNEL
- Gripping force: 72,142 kN total
>哨的拼音

本文发布于:2023-05-20 03:35:19,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/919500.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:雪景   看淡   程序   简笔画   美容   高分子   开学   描写
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图