工序检验交接卡(黑塔工序)-中英

更新时间:2023-05-12 09:31:12 阅读: 评论:0

                                                        990505.GB   
Februar 2003   
POR
工序检验交接卡(黑塔工序
Process Inspection Transferring Card (Semi-finished Products)
                                                  HWE-MP-QC-03-0011-2017
工程名称
Project Name
塔段编号
Tower Segment No.
检验项目
Inspection Items
自检人签字
Self Examiner
检验员签字
Inspector
返修次数及缺陷情况
Repairing Times and Defects
备注
Note
塔段组对
Tower Segment Fit-up
环缝VT
VT of Circumferential Seam
主焊缝UT
UT of Main Welding Seam
内件装焊尺寸
Asmbling and Welding Size of Inner Accessories
塔段外形尺寸Overall Dimensions of Tower Segment
法兰平面度
Flatness of Flange
MT/PT
塔段 VT
VT of Tower Segment
 
Sandblasting
 
Painting
内件安装Installation of Inner Accessories
成品终检
Final Inspection of Finished Products
 
Illustration
1. 上道工序合格后班组自检合格后签字(日期),方可报质检员检验,质检员检验合格在工序检验交接卡上签字(日期)。流转卡为班组长持有,检验合格后班组或车间之间凭此卡进行工序交接。
After checked and signed by lf examiner, QC should do inspection and if the process is qualified, QC should sign on transferring card. This card should be kept by group leaders and after qualified inspection, workshop or relevant group transfers process according to this card.   
2.标记“●”为必检项,必须经过质检员专检;标记“★”为终检项,必须经过检验合格后方可流转至下一车间或入成品库。
Tho marked with “●”are required inspection items and they must be inspected by QC. Tho marked with“★”are final inspection items and must pass inspection before turning to next process. 
3.最后工序时,此卡原件交品质部存档备份,生产部自留一份存档。
After all process finished, QC department keeps original one and production department keep a copy. 
4.此卡最终解释权归品质部。
QC department rerves all the right for final explanation of this card.

本文发布于:2023-05-12 09:31:12,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/887344.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:检验   合格   质检员   存档   内件   工序
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图