质量保证计划
Quality Control Plan
(项目编号:TRSC/1701152)
Project No:TRSC/1701152
2017年7月17日
07-17-2017
质量保证计划
Quality Control Plan
1. 概述 General Description
1.1 目的 Purpo
为满足张家港特锐机械制造有限公司采购项目,项目编号:TRSC/1701152的要求,制定如下专项质量保证计划。
To meet the requirement of Tedrail (Project No.: TRSC/1701152), make the following quality control plan:
2. 质量目标 Quality Objectives
根据该项目合同及附件中有关技术要求,满足下述质量目标:
满足首检确认后双方达成一致的《产品技术规范》及《产品部件尺寸验收质量表单》等质量要求
According to the relevant technical requirements of the project contract, meet the following quality objectives:
Meet the FAI confirmed that the two sides agreed to reach a connsus on the "product delivery and acceptance specification" and "product parts size and acceptance quality form" and other quality requirements
3. 技术准备Technical Prepar谁发明了纸
ation
为保证满足本项目零件的制造、检查和验收的技术要求,供应商应建立和贯彻有效的质量控制程序,用以保证产品的设计质量。
To meet the requirements of the project of parts manufacturing, inspection and acceptance of the technology, supplier should establish and implement an effective quality control procedures, to ensure the quality of product design.
3.1 技术输入 Technical input
将技术协议书和其它必要的文件将作为编制技术文件的依据。
The technical agreement and other necessary documents will be ud as the basis for the preparation of technical documents.
3.2 技术输出 Technical output
3.2.1 工艺人员编制工艺文件、检查卡片等技术文件输出:
Process documentation, inspection cards and other technical documents output:
3.2.2 输出文件要符合有关标准、规范且正确、完整,经项目设计负责人批准后才能发放。
The output file should be in accordance with the relevant standards, norms and correct, complete, approved by the person in charge of the project design to be issued.
3.3 技术验证Technology verification
在项目技术经理主持下,由车间组织技术人员和有关部门专业人员对产品设计和工艺进行确认。
Under the auspices of the project technical manager, the technical staff and the relevant departments of the workshop to confirm the product design and process.
4 生产过程控制Production Process Control
4.1 工作内容Job Content
为使该项目产品生产过程具有实现产品设计要求的能力,用较先进的工艺技术,以及合理的制造成本,确保制造的产品能够完全达到设计要求和相关标准要求。
In order to make the project production process has the ability to ac全国学联
hieve the requirements of product design, technology advanced, and reasonable manufacturing cost, ensure the products can fully meet the design requirements and the relevant standards.
5 检查和试验Inspection and Testing
5.1 产品验收的定义与编制
Definition and establishment of product acceptance
5.1.1 产品验收一句包括国家标准、技术协议、产品图纸、工艺文件等文件。
Product acceptance, including the national standard, technical agreement, product drawing process documents and other documents.
5.2 进料检验Incoming Quality Control
该项目所有采购产品必须进行进料检验,要求材料证明书满足技术要求
All purchad products must carry out incoming inspection, in the ca of the mill cetification meet the technical agreement,
5.3 工序检验Process Inspection
5.3.1 操作者对本工序完工后的产品进行自检、互检,并填写“自检记录”或以及交检票提交质检人员,检验合格的产品经质检人员标识并在转序单据上签章后方可转入下一到工序。
The operator of the lf inspection, mutual inspection process after the completion of the product, and fill out the "lf inspection record" and submit ticket or quality inspection personnel, product inspection qualified by quality inspection personnel in order to identify and document the signature before it can be transferred to the next step.
5.3. 2 操作者和质检人员做好产品标识和检验状态标识、记录及信息反馈,对其结论的准确性负责。
Operators and quality inspectors do a good job of product identification and inspection status identification, records and information feedback, the accuracy of the results of their responsibility.
5.4 最终产品的检查和试验Inspection and Testing of final products
经质检人员检验合格的最终产品,由特锐负责发出。
The final product quality inspectors qualification, by Tedrail is responsible for issuing.
6 不合格产品的控制Control of Nonconforming Product
6.1 供应商对不合格品予以识别和控制,防止不合格品非预期的使用或交付。
Supplier of nonconforming product shall be identified and controlled to prevent unqualified unintended u or delivery.
6.2在不合格品得到纠正之后,对其再次进行验证(复验),以证实符合要求。
After the nonconforming product is corrected, it is again verified (RE), in order to confirm compliance with the requirements.
6.3 供应商保持不合格的性质的记录,以及随后所采取任何措施的记录。
Supplier keep records of the nature of nonconformities, and then take any measures to record.
6.4 当产品不符合规定要求,但不影响使用时,可以办理让步接收,如果合同中有要求时,让步接收需经特锐确认同意。
When the product does not meet the requirements, but does not affect the u, you can apply for concessions to receive, if there is a requirement in the contract, the concessions received by Tedrail to confirm the connt.