单位工程名称 Name of unit project | 施工日期 Construction duration | |||||||||||||||
分部工程名称 Name of divisional project | 分项工程名称 Name of sub-divisional project | |||||||||||||||
施工图号 Construction drawing No. | 检查部位 Inspection location | |||||||||||||||
测试仪器型号、精度 Type and precision of test instru. | ||||||||||||||||
线路编号 Circuit No | 线路型号、规格、敷设方法 Circuit type、spec、laying mode | 绝缘电阻(MΩ)Insulation resistance | ||||||||||||||
AB | BC | CA | AN | BN | CN红酒的功效 | APE | BPE | CPE | NPE | |||||||
监理(建设)单位: Supervision Company(The Owner): (公章) 监理工程师: (Seal) Supervising Engineer: (建设单位代表): (Reprentative of The Owner): 年 月 日 Year/Month/Day | 施工单位: Construction Company: 班组长: Monitor of Work Team: (公章) 施工员: (Seal) Technician: 质检员: Quality Inspector: 年 月 日 Year/Month/Day | |||||||||||||||
单位工程名称 Name of unit project | 测试日期 Test date | ||||||
分部工程名称 Name of divisional project | 分项工程名称 Name of sub-divisional project | ||||||
施工图号奋斗文章 Construction drawing No. | 测试仪器型号、精度 Type and precision of test instru. | ||||||
测试部位 Test location | 接地性质 Grounding kind | 接地电阻(Ω) Grounding resistance | 测试环境 Surrounding of test | 结论 Conclusion | |||
设计值 Design value | 实测值 Measured value | 温度(℃) Temperature | 天气情况 Weather | ||||
胆小如什么 | |||||||
车辆报废年限 | |||||||
简图或备注: Sketch or remarks: | |||||||
监理(建设)单位: Supervision Company(The Owner): (公章) 监理工程师: (Seal) Supervising Engineer: (建设单位代表): (Reprentative of The Owner): 年 月 日 Year/Month/Day | 施工单位: Construction Company: 班组长: Monitor of Work Team: (公章) 施工员: (Seal) Technician: 质检员: Quality Inspector: 年 月 日 Year/Month/Day | ||||||
单位工程名称 Name of unit project | 施工日期 Cons. duration | ||||||||||||
分部工程名称 FRKName of divisional project | 施工图号 Construction drawing No. | ||||||||||||
测试仪器型号、精度 Type and precision of test instru. | |||||||||||||
电缆编号 Cable No. | 规格型号 Spec. and type | 起点 From | 终点 To | 敷设方式 Laying mode | 电缆头 型式 Type of terminal | 中间头数量 Number of connection | 绝缘电阻(MΩ) Insulation resistance | 长度(m) Length优美的摘抄段落 | |||||
相间 Phas | 对零 To zero | 对地 To earth | |||||||||||
电缆支架安装记录: Record of Cable support Installation: 1) 电缆支架最上层至竖井顶部或楼板的距离为______________m; 1)Distance from the upmost of support to the top of vertical shaft or floor slab is ___m; 2)电缆支架最下层至沟底或地面的距离为_____________m; 2)Distance from the undermost of support to ditch bottom or ground is _______m; 3)电缆支架层间最小距离为_________m; 3)The min. distance between layers of cable support __________m。 | |||||||||||||
本文发布于:2023-08-01 07:48:19,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/89/1104127.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |