TO: 营业部/采购部 | CC:Patrick | From:开发部 | |||||||||
预研阶段 Study Stage | 产 品 型 号 Model No. | 产 品 名 称 | |||||||||
开发阶段 Develop Stage | Description | ||||||||||
新产品研究申请表编号 Study Request No. | 新产品数据表 编号 PIF No. | ||||||||||
开发指令书编号 : Develop Order No. | 设计任务书编号: New Project No. | ||||||||||
(A) | 新产品初步工序 New Product Preliminary Procedure :- | ||||||||||
工时 Working Hours | |||||||||||
序号 | 产 品 工 序 Product Procedure | 目标 Target | 预算 Plan | 预算成本 Est.Cost | 实际成本 Act.Cost | ||||||
A1 | 分析客户样板 Study customer samples | 8 | |||||||||
A2 速写是什么意思 | 初步结构图 Preliminary construction drawing | 16 | |||||||||
A3 | 初步零件图 Parts drawing for quotation only | 16 | |||||||||
A4 | 初步物料单 Preliminary B.O.M. for quotation only | 16 | |||||||||
(A) 部份合计 Sub-total (A) = | 56 | ||||||||||
(B) | 新产品最后工序 New Product Final Procedure :- | ||||||||||
B1 | 确定结构图 Conform construction drawing | 40 | |||||||||
B2 | 确定零件图 / 物料申请 Conform parts drawings | 64 | |||||||||
B3 | 手办 Mock-up sample | 40 | |||||||||
B4 | 工程样板及测试 Eng. Sample & testing | 32 | |||||||||
B5 | 工程BOM Eng. B.O.M | 8 | 岳阳楼 | ||||||||
B6 | 考试样板 / 测试 / 文件 Lab testing & documents | 40 | |||||||||
B7 | 图纸修正 / 装配图 / 爆炸图 Modification drawings | 80 | 团总 | ||||||||
B8 | 特殊工装夹具 Special production fixture | 16 | |||||||||
B9 | 包装设计 / 数据 Packing information | 16 | |||||||||
B10 | 生产BOM跟进 Production B.O.M | 16 | |||||||||
B11 | 产品规范/包装图 Product spec. & packing drawing | 16 | 星开头的成语 | ||||||||
B12 | 产品移交 Product re-tun | 8 | |||||||||
B13 | 试产 Pilot run | 24 | |||||||||
(B) 部份合计 Sub-total (B) = | 400 | ||||||||||
(C) | 新产品工模和特别机械设备 New Product Toolings & Special Equipment :- | ||||||||||
C1 | 特别机械设备或夹具 ,如需要 Special machine or fixture, if needed. | ||||||||||
C2 | 五金工模总数,见附页 Total metal toolings :- ( e attachment ) | ||||||||||
C3 | 塑料工模总数,见附页 Total plastic toolings :- ( e attachment ) | ||||||||||
C4 | 铸铁工模 Cast Iron Tooling | ||||||||||
C5 | 其它工模,见附页 Others :- ( e attachment ) | 多音字差 | |||||||||
C6 | BOM物料成本 BOM Material cost | ||||||||||
(C) 部份合计 Sub-total (C) = | |||||||||||
(D) | 申请考试注册成本预算 Listing Cost Estimation :- | ||||||||||
D1 | 美国/加拿大认证申请 CUL application | ||||||||||
D2 | 欧洲认证申请 TUV / GS application | ||||||||||
D3 | 北欧认证申请 SEMKO application | ||||||||||
本文发布于:2023-07-30 00:55:55,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/89/1101396.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |