设备ITP

更新时间:2023-07-26 10:07:33 阅读: 评论:0

5
设备安装 equipment installation
ps自动拼图
5.1
容器与换热器安装vesls and heat-exchangers installation
5.1.1
进场检验
Receiving inspection
SH/T3542-2007
SH/T3532-2005
每台设备
Each equipment
B
I/QR
W/R
W/R
--
--
J115
5.1.2
基础检查交接
Foundation handover
SH/T3542-2007
SH/T3532-2005
每台设备
Each equipment
A
I
H
H
--
J204
5.1.3
基础准备
Inspection of Foundation preparation
SH/T3542-2007
SH/T3532-2005
每台设备
Each equipment
B
I
W
W
--
--
J204
5.1.4
开工报告
Commencement Report
合同要求
Contract specification
开工前
Before commencement
A
H
H
H
H
--
SH/T3503-J105A
5.1.5
特检院报检
BPVI Notice(pressure vesl)
BPVI Requirement
开始前
Before commencement
A
H
R
R
--
H
BPVI Format
5.1.6
检查安装调整(位置、标高、水平方位、垂直度,方向)
Check alignment(position, height, level, verticality, orientation)
SH/T3542-2007
SH/T3532-2005
每台设备
Each equipment
B
I
W
W
--
--
J314,J315
5.1.7
底板灌浆
Grouting ba plate
SH/T3542-2007
SH/T3532-2005
每台设备
Each equipment
B
I
W
W
--
--
J111,J130
SH/T3543 G116
5.1.8
梯子、平台安装
Ladder, platforms asmble
GB50205
SH/T3532-2005
按要求
As required
B
I
W
W
--
--
自检记录lf-checking record
SH3514-P1302
5.1.9
向特检院报检
BPVI Acceptance for pressure vesl
BPVI Requirement
按要求
as required
A
I/R
R
--
--
H
BPVI Format
5. 1.10
封闭前内部检查
Inspection of Internal Equipment
SH/T3542-2007
SH/T3532-2005
按需要
As required
B
I
W
W
H
--
F7407
乌雕
5.1.11
最终外观检查(尾项清单)
Final visual inspection (punch list)
SH/T3542-2007
SH/T3532-2005
每台设备
Each equipment
A
I
H
H
H
--
Extra129
5.1.12
机械验收
Mechanical Acceptance
SH/T3542-2007
SH/T3532-2005
每台设备
Each equipment
A
I
H
H
H
--
F02451
5.2
塔、冷却塔安装 Installation of column, Cooling Tower
5.2.1
进场检验
Receiving inspection
SH/T3542
SH/T3514-2001
每台设备
Each equipment
B
I/QR
W/R
W/R
--
--
J115
5.2.2
基础检查交接
Foundation handover
SH3542
SH/T3514-2001
每台设备
Each equipment
A
I
H
H
H
--
J204
5.2.3
基础准备
Inspection of Foundation preparation
GB50231-98
SH/T3532-2005
每台设备
Each equipment
B
I
W
W
--
--
J204
5.2.4
向特检院报检
BPVI Notice(pressure vesl)
BPVI Requirement
开始前
Before commencement
A
H
R
R
--
H
BPVI Format
5.2.5
塔预吊装检查
Check pre-asmbling
SH3515/3542
SH/T3514-2001
每台设备
Each equipment
B
I
W
W
--
--
自检记录lf-checking record
5.2.6
检查安装调整(位置、标高、垂直度、方位)
Check alignment (position, height, verticality,  orientation)
SH3542
SH/T3514-2001
每台设备
Each equipment
B
I/QR
W/R
W/R
--
--
J314
5.2.7
底板灌浆
Grouting ba plate
自我反思100字
SH3542
SH/T3514-2001
每台设备
Each equipment
B
I
W
W/R
--
--
J111,J130
5.2.8
梯子、平台安装
Ladder, platforms asmble
GB50205
SH/T3514-2001
按要求
as required
B
I
W
S
--
--
自检记录lf-checking record
3514-P1302
5.2.9
封闭前内部检查
Internal Inspection of equipment before closing
SH/T3542
按需要as required
B
I
W
W/R
-H-
F7407
5.2.10
向特检院报检
BPVI Acceptance for pressure vesl
BPVI Requirement
按要求
as required
A
I/R
R
--
H
BPVI Format
5.2.11
最终外观检查(尾项清单)
Final visual inspection (punch list)
GB50231-98
SH/T3514-2001
每台设备
Each equipment
A
I
H
H
-H-
Extra129
5.2.12
机械验收
Mechanical Acceptance
GB50231-98
SH/T3514-2001
每台设备
Each equipment
聊斋志异之小谢
A
I
H
H
H
--
F0245
5.3
塔盘、内构件与填料安装  trays, internals and packing installation
5.3.1
      进场检验
Receiving inspection
SH3542
SH/T3514-2001
每台设备
Each equipment
B
I/QR
W/R
W/R
--
--
J115
5.3.2
支撑圈和梁安装
Support ring and beam installation
SH3542
SH/T3514-2001
按需要as required
B
I
W
S
W
自检记录lf-checking record
5.3.3
检查塔盘装配(方位、螺栓、水平、堰高等)
Check tray asmbling orientation bolting, level, weir height, baffles
SH3542
SH/T3514-2001
按需要as required
B
I
W
W/R
W
J316
5.3.4
密封与强度
Check al and strength welding
SH3542
SH/T3514-2001
按需要as required
B
I
W
W
--
--
J329
5.3.5
人行通道封闭
Access clo
GB50231-98
SH/T3514-2001
SH3542
按需要as required
B
I
W
W
--
--
J111
debate的用法5.3.6
填料安装
Check filling packing
GB50231-98
SH/T3514-2001
SH3542
按需要as required
B
I
W
W
W
--
J317
5.3.7
封闭前内部检查
Inspection of Internal Equipment
GB50231-98
SH/T3514-2001
SH3542
按需要as required
B
I
W
W/R
W
--
F7407
5.3.8
最终外观检查(尾项清单)
Final visual inspection (punch list)
GB50231-98
SH/T3514-2001
每台设备
Each equipment
A
I
H
H
H
--
Extra129
J111
5.4
一般动设备安装rotating equipment installation(General)
5.4.1
进场检验
Receiving inspection
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
B
I/QR
W/R
W/R
--
--
J115
5.4.2
设备保管维护
Storage of Equipment
GB50231-98
SH3541
每台设备
Each equipment
B
I
W
S
--
--
自检记录lf-checking record
5.4.3
基础检查交接
Foundation work handover
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
B
I
H
H
H
--
J204
3543-G112
打印机状态错误是怎么回事
5.4.4
基础准备
Inspection of Foundation preparation
downtown
GB50231-98
SH/T3532-2005
SH3541
每台设备
Each equipment
B
I
W
W
--
--
SH/T3543 G113
J204
5.4.5
设备安装检查
Equipment Installation Inspection
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
B
I
W
W
--
--
J301
5.4.6
地脚螺栓一次灌浆
Initial grouting for anchor bolt
GB50231-98
GB50275-98
每台设备
Each equipment
B
I
W
W
--
--
J111
5.4.7
二次灌浆 cond grouting
GB50231-98
GB50275-98
每台设备
Each equipment
B
I
W
W
--
--
J111,J130
5.4.8
联轴器一次对中检查
1st Coupling final- alignment
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
B
I
W
W
--
--
J302
5.4.9
管道安装检查(无应力检查)
Piping installation check ( no-stress check )
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
B
I
W
W
--
--
SH3543-G402
Extra-418
5.4.10
联动器最终对中检查
Coupling Final-Alignment
GB50231-98
GB50275-98
每台设备
Each equipment
B
I
W
W
-W-
--
J302
5.4.11
单机试运行
Single running test of Equip.
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
A
I
H
H
-H-
--
J306
5.4.12
最终外观检查(尾项清单)
Final visual inspection (punch list)
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
A
I
H
H
-H-
--
Extra129
5.4.13
机械验收
Mechanical Acceptance
GB50231-98
GB50275-98
SH3541
每台设备
Each equipment
A
I
H
H
H
--
F0245
5.5
现场储罐制作安装  site storage tank installation
5.5.1
进场检验
Receiving inspection
GB50128-2005
SH/T3530-2001
每台设备
Each equipment
B
I/QR
W/R
W/R
--
--
J131
5.5.2
基础检查交接
Foundation handover
GB50128-2005
SH/T3530-2001
每台设备
Each equipment
A
I
H
H
H
--
J209
5.5.3
基础准备
Inspection of Foundation preparation
GB50128-2005
SH/T3530-2001
每台设备
Each equipment
B
I
W
W
--
--
J204
5.5.4
焊接工艺评定与焊接工艺指导书
          WPS & PQR
GB50128-2005
SH/T3530-2001
开始前before commencement
A
H
H
R
R
--
审核记录review record
5.5.5
焊工证书及考试
Welder certification and qualification test
GB50128-2005
SH/T3530-2001
每个焊工each welder
B
T/QR
W/R
W/R
--
--
审核记录review record
5.5.6
组对检查
Fit-up Inspection
GB50128-2005
SH/T3530-2001
每个口each joint
B
I
W
S
--
--
Extra412
5.5.7
焊接外观检查
Welding visual inspection
GB50128-2005
SH/T3530-2001
每个口each joint
B
I
W
S
--
--
Extea.412
5.5.8
渗透检查
NDT inspection (P.T)
JB/T4730.5-2005
按要求as required
B
T
H
W
R
--
J127
5.5.9
毛细作用
磁粉检查
MT
JB/T4730.4-2005
按比例as scale
B
T
H
W
R
--
J126

本文发布于:2023-07-26 10:07:33,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1097199.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:检查   安装   基础   位置   记录   焊接
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图