TEAM B衬里管道安装方案

更新时间:2023-07-26 10:04:28 阅读: 评论:0

Content 目录
1.Generation 工程概况
This method statement is prepared for Dow Corning Asia third pillar project pha II Team B of area B1(A21 A24), B2(A35 A36 A40) site lining pipeline installation work.. lining pipe is 3858m in the specific area.
本管道工程主要是道康宁亚洲第三支柱项目第二期项目TEAM B(B1(A21 A24) B2(A35 A36 A40))的衬里管道的现场安装工作。安装工作量:衬里管道约为3858(包括PTFEPVDFPGL及钛衬里)
2.Reference 施工依据
Process pipe layout, ISO drawings
工艺管道布置图,单线图
0136-OBJ-100014013  Specification for erection of metallic work
0136-OBJ-100014013  金属管安装规范
0136-OBJ-100210004  ZJG Standard for Painting and Protective Coatings
0136-OBJ-100210004  管道油漆和保护层标准
0136-STD-100710003  Pipe Support Standard
0136-STD-100710003  管道支架标准
0136-STD-100270006  Flange tightness procedure
0136-STD-100270006  法兰紧固程序
人的英语
0136-STD-100795812    Care & Protection Procedure
0136-STD-100795812    成品保护程序
Industry metal pipe construction and acceptance specification  GB50235-97
《工业金属管道工程施工及验收规范》                    GB50235-97
Industry metal piping construction quality inspection and acceptance specification GB50184-93
《工业金属管道工程质量检验评定标准》                GB50184-93
Industry equipment, pipe anti corrosive construction and acceptance specification HGJ299-91
《工业设备,管道防腐蚀工程施工及验收规范》          HGJ299-91
Process piping specification ASME B31.3 and ASME B31.1
《工艺管道规范》ASME B31.3喝茶图片ASME B31.1
实习期驾照CRANE (ASIA  PACIFIC) PTE LTD INSTALLATION AND MAINTANCE
CRANE  (亚太)  PTE 公司的安装及维护手册
3.Piping installation precondition 管道安装条件
3.1.专属头衔All the civil, mechanical and steel structure related to the piping is inspected and satisfied    with the requirement.
    与衬里管道安装有关土建、设备及钢结构工程已检验合格,满足安装要求。
3.2.Design drawing and other technical document is complete and all the drawing is inspected.
    灵组词语设计及其它技术文件齐全,施工图纸已汇审。
3.3.Construction method is approved, all the party both for management and construction personnel is in position and have clean acknowledge of the site situation, construction drawings, technical standard and related procedure.
    施工方案已经批准,参加现场管理及施工的人员已到位,并熟悉施工现场、施工图纸、技术标准和相关工作程序。
3.4.Vendor technician have issued technical explanation/training for piping construction team and administrators and guidance at site.
励志格言经典短句
管道生产厂家的技术人员已对管道施工及管理人员进行安装技术要求交底、培训,现场施工技术指导等。
3.5.Construction machinery preparation: all the related machinery are inspected and aligned as well as the paper work.
    公司经营策略施工机具准备:所有工机具已按校验程序校正,有合适的文件记录并能正常使用。
3.6.The lined pipes and fittings were arrived and inspected which can form into a integrity pipeline and also ensure continue work and schedule.
    衬里管及所需的安装材料已运到现场并且检验合格,且到场的管段及管件能组成完整的管线并能保证连续施工和安装进度的要求。
4.Material acceptance 材料的验收
4.1.Piping accessory acceptance 管道附件验收
4.1.1.Inspection should be taken to the accessories as the rules, the rated allowance sho
uld be standard as well as standard satisfied material.
对统一到货构配件按规定进行检查,其尺寸偏差应符合现行标准,材质符合设计要求。
4.1.2.Keep the flange surface clean and free of burr and groove.
法兰密封面应平整光洁,不得有毛刺及径向沟槽。
4.1.3.Rubber, plastic nonmetal shim should be of smooth character, no aging and layering. No damage crippling, wrinkling on the surface.
橡胶、塑料等非金属垫片应质地柔和,无老化变质或分层现象。表面不得有折损,皱纹等缺陷。
4.2.Valve inspection and acceptance 阀门检查验收
4.2.1.The delivered valve should be inspected for the rotating and operation device, which should be flexible and no hanging defect.
阀门到货后应逐个检查其传动装置和操作机构,要求动作灵活可靠,无卡涩现象。
4.2.2.All the received the materials should be lay down as the supplying list as well as the
classification and tag, mean while keep the clearance of the lay down area. Any material without quality certificate or being unacceptable should be refud. During storage, parate the SS material and CS material to avoid pollusion.
所接收的所有材料要根据供货商材料清单分类储存堆放并标识标签,同时保持堆放场地清洁。要拒收任何不可接受的或没有质量合格证的材料。在储存期间,不锈钢材料与碳钢材料应分开堆放,避免污染。
5.生物成语Material relea and control 材料的领用与控制
5.1.The installation schedule should be prepared as per the delivery by the engineer, material relea should be as per the approved installation method statement.
工程师应根据材料到货情况编制管道安装计划,根据批准后的安装计划,按每张施工图纸编制施工领料清单。

本文发布于:2023-07-26 10:04:28,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1097195.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:安装   施工   材料   管道   现场   要求
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图