In the third quarter
This is the third quarter of your business in guiyang
First, strictly interlock discipline and strengthen interlock test card control measures
No modification of signal circuit or interlocking software (data) shall be made without the approval of the procedure.
2, in order to strengthen the management of electric property test, found the power supply for floor drain excess current, signal cable insulation, it should immediately organize handling, and curity issues into library management, report step by step.
Second, strengthen the interlock testing organization and the card control
The interlock test is carried out by the head of the interlock test, which strictly carries out the interlocking discipline, the interlock test is not complete and the delivery is strictly forbidden.
The electric ction shall, on the basis of the completion of the interlocking test in the construction unit, should first check the wiring and do it
To match the picture and conduct a comprehensive simulation of interlocking test; After connection with the equipment, complete interlock verification test should be carried out. The hump interlock test should also include simulated slip and real
car slide test.
3, signal depot formulation of interlocking test plan, targeted, detailed interlocking test content, clear opening interlocking test items, test methods and conditions, determine the necessary interlocking test time.
5, contents, procedures, steps and methods of the interlocking test should be in accordance with the "interim measures for railway signal interlocking test" and "implementing rules for the chengdu railway station signal interlocking check test execution. The interlocking test of the new equipment is carried out by the engineering director of the office of the railway administration.
企业财务活动包括6, signal depot for interlocking test, shall obtain the railway by DianWuChu interlocking test certificate issued by the personnel exerci specialist command, specialist operations and personnel supervision. Workshop, work area is responsible for the interlocking test by a signal depot and interlocking test certificate issued by the above departments personnel, implements the command, s
omeone operation, someone supervision.
The interlock test must be conducted within the time of the skylight or construction approval. At the same time, it is necessary to carry out the interlock test in the skylight to affect the normal u of the downward normal line.
Third, the pratt railway rvice is maintenance skylight signal I maintenance project
粤语新年歌曲Annual signal interlock relationship check test.
Internal and external equipment replacement.
(1) change the equipment of single wheel repair, such as 20 or more relay.
(2) other indoor and off-t equipment can be replaced in the skylight.
Four, sd railway electricity maintenance skylight Ⅱ operation signal level maintenance project综评学生版
The switch equipment, track circuit, signal machine, optical cable, all kinds of box boxes and other outdoor signal equipment maintenance.
Five, the sd department of railway signal points outside the content of the job: optical cable route inspection, indoor and outdoor equipment patrol inspection and switch switch test shall not affect the communication equipment such as mechanical strength and electrical properties of homework. The
signal-point off-site operation may be performed outside the skylight, but the interval between the train and the previous train is strictly prohibited by the speed of 160km/h and the previous train. Other maintenance items must be included in the skylight, strictly forbidden to u the interval time operation.
Six, sd department of railway signal points outside work must
develop a skylight outside the maintenance plan, skylight points outside the maintenance operation plans approved by the workshop equipment management unit or gment level. Online homework station liaison with approved the work plan, equipment management unit at the station the driving equipment check register within the registration, the station attendant sign recognition. The online operation must t up the station liaison, the field guard, and stop the operation when contact is broken.医生简笔画
7, the notice to the publication of the measures for the examination of the performance of the office o
f the guiyang electric rvice ction
The shop dispatching command no match for the dispatch order number of the corresponding working area, and 200 yuan for each inspection in the workshop and area.成交英语
2, each work area on Friday reported before 18:00 workshop next week point outside the maintenance operation plans, then cross into the work area by workshop director, lack of a work area plans, workshop, team's review of 100 yuan, and so on.
3, no plan, no dispatch order to do the homework, each examination area 400 yuan.
4, no plan temporary work needs to go up or deal with the hidden trouble, the workshop dispatcher is after receiving the application of the area,After check with workshop director, director of cadres at point, according to the arrangement of work content to confirm whether the workshop under the远古蛮荒
dispatcher to scheduling command scheduling command (and write), not according to the requirements, issued an order each time the dispatcher evaluation of 200 yuan, area has not been shop scheduling command, make operation scheduling command, without authorization, appraisal 400 yuan each time.
林俊杰醉赤壁8, the control measures of bad test after changing the rails - when changing the rails and the switch in the interlock area of the central interlocking station, the following provisions shall be carried out
2, works departments in the station centralized interlocking area after replacement of rail and rail, departments should immediately test track circuit signal shunt residual pressure value, found that the residual pressure exceeds bid, to inform, head of the public works construction, and in the driving device check register to register, department of public works construction sign recognition, by public works construction department for processing. The traffic department is required to handle the driving in accordance with the requirements registered in "the registration book for the inspection of driving equipment".
Control measures for poor test after change of rail - in automatic closing ction (excluding automatic shaft closing of the meter)
When changing steel rails within the interval, the following provisions shall apply
1, the public works department in interval after replacement
亚洲最帅

本文发布于:2023-07-25 23:34:39,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1096633.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:活动   简笔画   远古   最帅   包括
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图