11.22 急救冲洗和洗眼站 Safety Shower and Eyewash Station                                             
          软管站  Ho Station
1  supply connection  供水接头
2  alternate supply  备用水源     
两浙路
3  brass whistle valve  铜笛阀
4 screwdriver stop  改锥旋动阀
5  plugged  堵住
6  galvanized pipe  镀锌管
7  pull chain  拉链
8  steel spring  钢制弹簧
9  aluminium foot pedal  铝制弹簧
10  floor flange stand  底盘、地轴架
11  lf-closing valve  自闭阀
12  shower head , deluge head  莲蓬头
13  pull chain & ring  拉链和拉环
14  stainless steel bow with twin 
宁静志远    fountain heads  带两个喷水头的不锈钢盆
15  panic bar  紧急手把,事故手把
16  block valve  切断阀
17  temporary breakaway type ho 
    coupling  快速接头,软管临时接头
18  ho  软管
19  root valve  检修阀 总阀
20  branch  支管
21  header  总管
22  condensate to header (clod system) 
    凝液去总管(闭式系统) 
23  steam  蒸汽
24  plant air  厂区空气
25  anti-freeze by-pass  防冻旁通管
26  water  水
梦见火烧房子
27  inert gas  惰性气体
28  steam trap  蒸汽疏水器
29  drain & test connection  排水和检查接头
19  流称图和管道布置图  Flow Diagram and piping Layout
19.1  工厂平面布置总图  Master Plot Plan
  1  administration building  行政大楼
  2  cars  车皮
  3  center road  中心大道
  4  gate & clock hou  大门和考勤室
  5  cooling tower  凉水塔
卧室立面图
  6  first aid & personnel change hou 
      急救和交接班室
  7  entrance road  中央大道入厂大道
  8  fuel or liquid row material unloading area 
      燃料或液体原料卸料区
  9  filling station  加油站
  10  future cafeteria  预留食堂
  11  future cooling tower  凉水塔预留地
  12  future process area  工艺装置预留地
  13  liquid product  液态成品装车
  14  liquid storage spheres  储液球罐
  15  machine and maintance shop  机修车间
肥胖女人  16  plant fence  工厂围墙
  17  product packaging  成品包装
  18  parking  停车场
  19  scale  磅秤
  20  south city highway  城南公路
  21  south process road  工艺装置南路
  22  spur track  岔道
  23  steam generation  蒸汽发生站
  24  switch track  铁路支线
  25  team track railroad  存车轨道
  26  temporary construction RR.  临时建设铁路
  27  warehou  仓库
  28  water treatment  水处理
  29  future steam generation  蒸汽发生预留地
  30  process area 工艺装置区
  31  500′to rapid river 至急流河500英尺
19.5  管道布置 — 装置配管  Piping Layout-Installation Piping 
  1  yard piping  装置内配管
  2  yard piping rack yard pining support  装置内管架
  3  yard support bent  管廊,一排管架
      yard steel bent
四湖影院  4  one level yard  单层管架
  5  no elevation difference  标高相等
  6  flat turn  等高度改变走向
  7  changing direction change elevation  改变走向,改变标高
  8  yard bank  单个管架
  9  yard column  管架立柱
  10  top yard bank  管架上梁
  11  bottom yard bank  管架下梁
  12  headroom  (高度方向的)净空
  13  trench  (管)沟  (电缆)沟
  14  cover plate  沟盖扳
      trench cover
  15  spacing between yard support bents  管架间距
  16  lines span  管道跨距
  17  valve spacing  阀门净空
水浒传朝代
  18  line spacing  管道净空
  19  clearance (gap)  净空,净距
  20  structure  框架 ,构筑物
  21  operator  操作工
  22  platform  操作平台
  23  catwalk  检修走道,(有罐管架顶上的)人行栈桥
  24  cantilever  悬臂支架
  25  access road  检修支架
      walkway  走道,通行道
  26  yard span (yard steel span )  管道跨距
  27  grade (grade elevation ,ground level ,
      ground elevation )  地面标高
  28  pipe sleeper  管墩
  29  bare line  裸管,不保温管
19.6  配管图,管道(路)图  Piping Drawing
19.6.1  平面视图  Plan View
1  battery limit  界区
2  ML ( match line ) 
    接续分接线
3  C O D (continued on
  drawing )  连续图
4  E L (elevation)  标高
5  C L (center line)  中心线
6  BBP.EL (bottom
  ba plate elevation )
  底板底部标高
7  bypass  旁通管
8  symbol of equipment 
  设备位号
9  piping code  管道代号
10  line number  管线号
11  dimension of diameter 
    管径尺寸
12  drawing number  图号 
13  access road  通道
14  PE.EL (plain
    end elevation)
    平端标高
15  RV (relief calve)
    安全标高
16  VE (vaccum exhaust)
    真空排放
17  descriptive north
    制图北向
19.6.2  前视图  Front View
午后的雨
1  EL (elevation)  标高
2  B.O.P. (bottom of pipe)  管底
3  CL (center line)  中心线
4  three dimension diagram ,isometric
    diagram  (管段)空视图,轴测图,管段图
5  line number  管号
6  grade  地坪
7  ground EL.  地面标高
8  pipe stanchion (PS)  管架
9  F . W . (field weld)  现场焊
10  spool number  管段号
11  drawing identification  管段所在图号
12  concutive spool number  管段顺序号
13  insulation  保温层
14  alternate position  另一种布置位置
15  Ecc . Red . (eccentric reducer)
    偏心异径管 , 偏心大小头
19.7  管道组装图 (等角图,轴侧图,管段图)Pipe Line Isometric
      Diagram (Erection Diagram)
1  SKLET. (sockolet)  承口接管台
2  S.O.F. (slip on flange)  滑套法兰
3  number of pipe support  管架号
4  F.T.F. (fitting to fitting)  管件至管件

本文发布于:2023-07-25 18:05:36,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1096309.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:管道   装置   标高   接头   管架   预留   改变   大道
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图