SAE-AMS-S-13165_美国军用喷丸标准

更新时间:2023-07-25 03:22:14 阅读: 评论:0

SAE-AMS-S-13165
ADOPTION NOTICE
SAE-AMS-S-13165, "SHOT PEENING OF METAL PARTS", was adopted on
19-FEB-98 for u by the Department of Defen (DoD).  Propod changes by DoD activities must be submitted to the DoD Adopting Activity: Army Rearch Laboratory Weapons and Materials Rearch Directorate, Attn: AMSRL-WM-M, Aberdeen Proving Ground, MD
21005-5069.  Copies of this document may be purchad from the Society of Automotive Engineers 400 Commonwealth Drive
Warrendale, Pennsylvania, United States, 15096-0001.
www.sae/
___________________
Custodians:Adopting Activity:
Army - MR
Army - MR
裹足不前
Navy - AS
Air Force - 11
AREA MFFP
DISTRIBUTION STATEMENT A:Approved for public relea; distribution is unlimited.
曹操作文
SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The u of this report is entirely voluntary, and its applicability and suitability for any particular u, including any patent infringement arising therefrom, is the sole responsibility of the ur.”
SAE reviews each technical report at least every five years at which time it may be reaffirmed, revid, or cancelled. SAE invites your written comments and suggestions. Copyright 1997 Society of Automotive Engineers, Inc.
All rights rerved.Printed in U.S.A. QUESTIONS REGARDING THIS DOCUMENT:(412) 772-7154FAX: (412) 776-0243
2.APPLICABLE DOCUMENTS:
The following publications, of the issues in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein.
2.1U.S. Government Publications:
Available from DODSSP, Subscription Services Desk, Building 4D, 700 Robbins Avenue,
Philadelphia, PA  19111-5094.
MIL-S-851Steel Grit, Shot, and Cut Wire Shot; and Iron Grit and Shot-Blast Cleaning and --``,,``,`,`,,,,,`,`,,``,,,``,,-`-`,,`,,`,`,,`---
Peening
MIL-S-5002Surface Treatments and Inorganic Coatings for Metal Surfaces of Weapon
Systems
MIL-G-9954Glass Beads, For Cleaning and Peening
MIL-STD-45662Calibration Systems Requirements
RR-S-366Sieves, T est
景的成语
2.2SAE Publications:
Available from SAE, 400 Commonwealth Drive, Warrendale, PA  15096-0001.
J441Cut Wire Shot
J1830Ceramic Shot for Peening
3.REQUIREMENTS:
3.1Shot:
3.1.1Material: The shot ud shall be made from cast iron, cast steel, cut steel wire (or stainless cut
wire), glass, or ceramic as specified or approved.  The hardness shall be determined by any of the various methods applicable to small ctions at loads determined to provide a reliable conversion to Rockwell C.  Steel and iron shot shall conform to MIL-S-851.  For steel parts over 200,000 psi tensile strength, u hard steel shot in the range 55-65 HRC or ceramic shot, hardness
comparable to 57-63 HRC, unless otherwi specified (e 6.14).  Stainless steel cut wire shot, type 302 or 304 (condition B spring temper), and carbon steel cut wire shot shall conform to
SAE J441.  Glass beads shall conform to MIL-G-9954 except for sieve analysis.  Ceramic beads shall meet the requirements of SAE J1830.
3.1.2Size: Unless otherwi specified, the size of shot charged into the machine, whether new shot,
ud shot, or reclassified shot, shall be at the option of the contractor and shall be as specified in table II (cast sizes), table III (cut wire sizes), table IV (glass bead sizes) or table V (ceramic bead sizes).
3.1.3Shape: The shot or beads shall be free from sharp edges and inspected for deformed shapes or
broken shapes when examined per 4.3.1, 4.3.3, and figure 7.  Cut wire shot, if ud, shall be
preud or burnished to eliminate sharp edges (e 6.17.1).  A given sample size shall contain no more than the number of unacceptable deformed shapes as shown in figure 7, and defined in
table I below (e 3.3.9).
TABLE I.  Maximum allowable number of unacceptable deformed shapes
Cast Shot Sizes
Cut
Wire
Sizes
Glass
Bead
Sizes
(Inches)
Ceramic
Bead
Sizes
(Inches)
Sample
Size
(Inches)
*Maximum Allowable
Number of
Unacceptable
Deformed Shapes
930—.132-.094—  1 x 1  8 780—.111-.079—  1 x 111 660CW-62.094-.066—  1 x 116 550CW-54.079-.056—  1 x 122 460CW-47.066-.047—  1 x 132 390CW-41.056-.039—  1 x 145 330CW-35.047-.03310.0461/2 x 1/216—CW-32——1/2 x 1/218 280CW-28.039-.0278—1/2 x 1/223 230CW-23.0331-.02340.0331/2 x 1/232细菌世界历险记
190CW-20.0278-.0197—1/2 x 1/245 170—.0234-.01650.0241/4 x 1/416 130—.0197-.0139—1/4 x 1/423 110—.0165-.01170.0171/4 x 1/432
70—.0139-.0098—1/4 x 1/445——.0117-.00830.0121/8 x 1/816——.0098-.0070—1/8 x 1/822——.0083-.00590.0081/8 x 1/831
*The numbers are approximations bad on approximately 10% of the actual particle count in the given sample size.--` ` , , ` ` , ` , ` , , , , , ` , ` , , ` ` , , , ` ` , , -` -` , , ` , , ` , ` , , ` ---
3.2Equipment:
3.2.1Automatic shot peening: The machine ud for shot peening shall provide means for propelling
shot by air pressure or centrifugal force against the work, and mechanical means for moving the work through the shot stream or moving the shot stream through the work in either translation or rotation, or both, as required.  The machine shall be capable of reproducing consistently the shot peening intensities required.  Except for wet glass bead peening (e 3.3.9), the equipment shall continuously remove broken or defective shot so that this shot will not be ud for peening.
3.2.2Computer-controlled shot peening: When specified in the contract or purcha order (e 6.2 and
6.8), the machine ud for shot peening shall be as in 3.2.1 and also shall be equipped with
computer aided monitoring equipment.  This equipment shall continuously monitor critical process parameters through interaction with a nsing system.  The media shall be metered to each nozzle a
有心的成语nd wheel with the desired shot flow.  Process parameters shall be as specified by the procuring activity (e 6.9).  The machine shall be stopped immediately and corrective action shall be taken when any of the established process limits is violated.  The electronic system ud for monitoring and controlling shot peening shall include a data recording device which will mark (plot) process interruptions or inconsistencies, and shall be maintained for the purpo of providing a hard copy record.
3.3Procedure:
3.3.1Dimensions and condition of parts: Areas of parts to be shot peened shall be within dimensional
and surface finish requirements before peening.  All heat treatment, machining and grinding shall be completed before shot peening.  All fillets shall be formed, all burrs shall be removed, and all sharp edges and corners to be peened shall be provided with sufficient radii to result in complete coverage without any distortion prior to peening (e 6.15).
3.3.2Precleaning: Except as otherwi specified or permitted, all areas to be peened shall be cleaned in
accordance with MIL-S-5002.  Procedures for stripping coatings shall be as specified or approved in the contract or on the applicable drawings.
--``,,``,`,`,,,,,`,`,,``,,,``,,-`-`,,`,,`,`,,`---
3.3.3Masking: Areas of the part or work piece and the dimensional tolerances of the areas which are
designated in the contract or applicable drawing to be free from any shot peening marks shall be suitably masked or otherwi handled to protect such surfaces from the shot stream or subquent damage.  Areas not requiring peening and not required to be masked shall be considered optional.
3.3.4Magnetic particle or penetrant inspection: Except as otherwi specified, when magnetic particle
削切or dye penetrant inspection is required, parts shall be subjected to such inspection before peening.
素质目标3.3.5Loading: Unless otherwi specified or permitted, parts shall be free from externally applied loads
乒乓球入门基本功
or forces during shot peening.

本文发布于:2023-07-25 03:22:14,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1095492.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:细菌   基本功   素质   历险记   入门   目标   世界
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图