Tendering投标
自编山歌歌词大全Contractor pre-qualification承包商资格预审
Prepare list of contractors for pre-qualification准备资格预审的承包商目录
Prepare pre-qualification document for contractors准备承包商的预审文件
Issue pre-qualification document to P&G for review为评审向P&G发行预审文件
Update pre-qualification doc更新预审文件 儿童太空画
Issue pre-qualification doc to contractors向承包商发行预审文件
Pre -qualification period预审期
Pre -qualification return预审返回
Pre -qualification asssment and shortlist prepare预审评估和候选人预备
Issue shortlist of contractors for tender to P&G向P&G发行投标的承包商候选人
P&G review and confirm shortlist P&G评估和确认候选人
P&G confirmation of shortlist for tender P&G关于投标候选人的确认
Mail works tender邮件作品投标
Preparation of boQ,tender documents boQ,投标文件准备
Issue to P&G for review 为评估向P&G发行
P&G review & commentP&G评估及评论
Issue tender doc comments发行投标文件评论 冰心散文诗
Update tender documents更新投标文件
Issue tender 发布投标
Tender period 投标期
Tender return 投标返回
Issue tender addenda 发行投标附录
Return of tender addenda 投标附录返回
Tender evaluation & award 投标评估及决标
Tender asssment & evaluation 投标估价及评估
Contractor interviews 承包商会面
Tender clarifications 投标说明
Tender negotiations 投标谈判
Prepare tender recommendation report 准备投标推为报告
Issue tender recommendation report 发行投标推为报告
Confirmation of appointment by P&G P&G任命确认
Letter of award 决标信
估算/费用估算:estimate/cost estimate;
估算类型:types of estimate;
详细估算:是偏差幅度最小的估算,defined estimate; 植物作文三年级
设备估算:equipment estimate;
分析估算:analysis estimate;
报价估算:proposal estimate;
控制估算:control estimate;
初期控制估算:interim control estimate/initial control estimate
批准的控制估算:initial approved cost
核定估算:check estimate
首次核定估算:first check estimate
二次核定估算:production check estimate
人工时估算:man hour estimate
材料费用/直接材料费用:material cost/direct material cost
设备费用/设备购买费用:equipment cost/purchad cost of equipment
散装材料费用/散装材料购买费用:bulk material cost/purchad cost of bulk material
施工费用:construction cost
施工人工费用:labor cost/construction force cost
设备安装人工费用:labor cost associated with equipment
散装材料施工安装人工费用:labor cost associated with bulk materials
人工时估算定额:standard manhours
施工人工时估算定额:standard labor manhours
标准工时定额:standard hours
劳动生产率:labor productivity/productivity factor/productivity ratio
修正的人工时估算值:adjusted manhours
人工时单价:manhours rate
施工监督费用:cost of construction supervision
施工间接费用:cost of contruction indirects
分包合同费用/现场施工分包合同费用:subcontract cost/field subcontract cost
过年的手抄报怎么画公司本部费用:home office cost
公司管理费用:overhead
非工资费用:non payroll
开车服务费用:cost of start-up rvices
其他费用:other cost
利润/预期利润:profit/expected profit
服务酬金:rvice gains
风险:risk
风险分析:risk analysis
风险备忘录:risk memorandum
节约用水的图片未可预见费:contingency
基本未可预见费:average contingency
最大风险未可预见费:maximum risk contingency
用户变更/合同变更:cilent change/contract change
认可的用户变更:approved client change
待定的用户变更:pending client change
项目变更:project change
内部变更:internalchange
批准的变更:authoried change
强制性变更:mandatory change
选择性变更:optional change
欢快轻音乐内部费用转换:internal transfer
认可的预计费用:anticipated approved cost 面粉英文
涨价值:escalation
项目费用汇总报告:project cost summary report
项目实施费用状态报告:project operation cost status report
总价合同:lump sum contract
偿付合同:reimbursible contract
预算:budget

本文发布于:2023-07-24 23:16:16,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1095300.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:费用   投标   估算
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图