SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The u of this report is entirely voluntary, and its applicability and suitability for any particular u, including any patent infringement arising therefrom, is the sole responsibility of the ur.”
SAE reviews each technical report at least every five years at which time it may be reaffirmed, revid, or cancelled. SAE invites your written comments and suggestions.
QUESTIONS REGARDING THIS DOCUMENT: (724) 772-8512 FAX: (724) 776-0243
TO PLACE A DOCUMENT ORDER; (724) 776-4970 FAX: (724) 776-0790
SAE WEB ADDRESS  www.sae
3.5Open Time—The time between adhesive application and asmbly (closing) of the bond.
3.6Peel-Strength Average—The peel-strength average is considered to be the midline of the peel-load variations
as displayed on the universal testing machine.
4.Equipment Required
4.1Universal Testing Machine—Must meet the requirements of ASTM D 1002 (cross head speed of 50 to
500mm/min (2 to 20 in/min), range 0 to 9.07 kg (0 to 20 lb)).
4.2Fixture—Constant 90 degree angle frictionless peel fixture.
4.3Roller—Able to apply a load of 0.357 kg/cm (2 lb/in) width.
4.4Specimen Cutter—Two single-edged razor blades held in parallel planes, 2
5.4 mm (1.0 in) apart.
4.5Timer—0 to 60 min.
4.6Spray Guns
4.6.1A TOMIZING—Manufacturer's recommendations—with assorted nozzles, air caps, needles, and pressurizing
pots.
4.6.2A IRLESS—Manufacturer's recommendations—with assorted nozzles, air caps, needles, and pressurizing
pots.
5.Method A—90 degree Peel
四大才女是谁5.1Sample Preparation—90 degree Peel
5.1.1Select one 100 x 300 mm (4 x 12 in) mi-rigid/rigid substrate panel for each test condition masking a
25x100 mm (1 x 4 in) strip along a 100 mm (4 in) panel edge.
NOTE—25 panel/strip 90 degree peel-test asmblies are required for each adhesive open time, warp, fill, and adhesive wet-film thickness condition being evaluated.  In instances where only one
substrate is coated with the adhesive, mask only that substrate.
我本来可以放弃5.1.2Cut the flexible material into one 25 x 300 mm (1 x 12 in) test strip for each mi-rigid/rigid substrate panel.
NOTE—When cutting fabrics with a defined weave, cut one t parallel to the warp and one t parallel to the fill.  Both ts shall be tested.
5.1.3Apply the test adhesive for approximately 200 mm (8 in) from one end of the flexible test material strips.
NOTE—For spray-applied adhesives, mask 100 mm (4 in) from one end of the substrate aligning the test strips side by side with their intended bonded surfaces facing up.  Adhesive wet-film
考研英语一真题
thickness shall be per manufacturer's recommendations.
5.1.4Immediately start the open-time timer after applying the adhesive.  Carefully remove the masking material
from the flexible test strip(s) before applying each strip to the center of a panel.
5.1.5At the appropriate open time(s), apply a flexible test material strip to the center of a mi-rigid/rigid panel
aligning the strip with the panels 300 mm (12 in) edges and assuring that the unbonded portion of the flexible strip is on the 100 mm (4 in) masked edge with the bonded portion of the flexible strip starting 25 mm (1 in) from the panel's edge.  Immediately pressurize the full-bond area rolling it four times (two times forward and two back) using the 0.91 kg (2 lb) roller.
NOTE—Every effort to eliminate the effects of adhesive squeeze-out on the peel sample should be made.
5.1.6Repeat the same procedure for the balance of conditions or until all samples are asmbled.  Remove any
masking from the mi-rigid/rigid panels.
5.1.7On the back of each panel describe the adhesive open time, warp and fill direction, adhesive film thickness,
and number the test asmbly.
5.1.8Condition the panel/strip test asmblies for 24 h at 24 °C ± 2 °C (75 °F ± 3 °F) (or manufacturer's
recommendations).
5.2Peel Procedure—90 degrees
5.2.1Mount the 90-degree peel fixture in the universal tester.
5.2.2Install a test asmbly in the 90-degree peel fixture aligning the flexible test strip with the universal testers
jaw to assure a 90-degree orientation before curing the asmbly in the peel fixture and the flexible strip in the jaw.
NOTE—After curing the test asmbly, assure the peel fixture continues to move freely.
5.2.3Activate the universal-testing machine to peel the strip from the panel at arate of 304.8 mm/min (12 in/min)
for a minimum of 152 mm (6 in).
NOTE—Pay particular attention that the 90-degree peel fixture continues to move easily maintaining a perpendicular alignment during the peel process.  If alignment along this axis exceeds
±10degrees, that portion of the test-strip sample should be disregarded.
5.2.4Record the breakaway and average peel value for each test asmbly.
5.3Report Requirements—90-degree Peel
5.3.1Report the test method number and any deviations from the recommended test method.
5.3.2Report complete identification of samples (open time, warp or fill, adhesive wet-film thickness), adhesive
type, as well as conditioning time, temperature, and humidity prior to aging and testing.
月亮之歌原唱5.3.3Report the average of the breakaway and average peel values for the samples (in kilograms per centimeter
[kg/cm] width or ounces per inch [oz/in] width).
5.3.4Report any inconsistencies or irregularities (substrate elongation, deformation, etc.) noted during the test.
6.Method B—180-degree Peel
6.1Sample Preparation—180-degree Peel
6.1.1Select one 100 x 300 mm (4 x 12 in) mi-rigid/rigid substrate panel for each test asmbly masking a
25x100 mm (1 x 4 in) strip along a 100 mm (4 in) panel edge.
NOTE—25 panel/strip 180-degree peel test asmblies are required for each adhesive open time, w
arp, fill, and adhesive wet-film thickness condition being evaluated.  In instances where only one substrate is
coated with the adhesive, mask only that substrate.
6.1.2Cut the flexible test material into one 25 x 500 mm (1 x 20 in) test strip for each mi-rigid/rigid substrate
panel.
NOTE—When cutting fabrics with a defined weave, cut one t parallel to the warp and one t parallel to the fill.  Both ts shall be tested.
6.1.3Apply the test adhesive for approximately 200 mm (8 in) from one end of the flexible test material strips.
NOTE—For spray-applied adhesives, mask 300 mm (12 in) from one end of the flexible substrate aligning the test strips side by side with their intended bonded surfaces facing up.  Adhesive
wet-film thickness shall be per manufacturer's recommendations.
6.1.4Immediately start the open-time timer after applying the adhesive.  Carefully remove the masking material
from the flexible test strip(s) before applying each strip to the center of a panel.
6.1.5At the appropriate open time(s), apply a flexible test material strip to the center of a mi-rigid/rigid panel
aligning the strip with the panel's 300 mm (12 in) edges and assuring that the unbonded portion of the flexible strip is on the 10 cm (4 in) masked edge with the bonded portion of the flexible strip starting 2.5 cm (1in) from the panel's edge.
6.1.6Immediately upon application, roll the entire bonded area of the flexible strip four times (two times
forward and two back) using the two-pound roller.
NOTE—Every effort to eliminate the effects of adhesive squeeze-out on the peel sample should be made.
6.1.7Repeat the same procedure for the balance of conditions or until all samples are asmbled.
6.1.8Condition the panel/strip test asmblies for 24 h at 24 °C ± 2 °C (75 °F ± 3 °F) (or manufacturer's
recommendations).
6.2Peel Procedure—180 degrees
烩牛肉的做法
6.2.1Inrt the 100 mm (4 in) adhesive free edge of the mi-rigid/rigid panel into one of the universal tester jaws.
Double back the loo 300 mm (12 in) of unbonded flexible strip aligning it between the universal testing machine jaws.  Secure both the panel and the aligned flexible strip in the jaws.
6.2.2Activate the universal tester to peel the flexible strip completely from the panel at a rate of 304 mm/min
(12in/min)
6.2.3Peel for a minimum of 152 mm (6 in) recording the breakaway value and average peel value for each test
asmbly.
6.3Report Requirements—180 degrees
6.3.1Report the test method number and any deviations from the recommended test method.
6.3.2Report complete identification of samples (open time, warp or fill, adhesive wet-film thickness), adhesive, as
well as conditioning time, temperature, and humidity prior to aging and testing.
关于月亮的网名
6.3.3Report average breakaway, and average remaining peel run values of the samples (in kilograms per
centimeter [kg/cm] width or ounces per inch [oz/in] width).
6.3.4Report any inconsistencies or irregularities (substrate elongation, deformation, etc.) noted during the test.
PREPARED BY THE SAE TRIM ADHESIVES SUBCOMMITTEE OF THE
SAE MATERIALS JOINING EXECUTIVE COMMITTEE

本文发布于:2023-07-22 01:31:47,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1091297.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

标签:月亮   赠言   脚臭   考研   牛肉   毕业   汗脚   真题
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图