F1300DB Mud Pump Package
泥浆泵组
操作手册
Instruction manual
HIGHLAND PETROLEUM EQUIPMENT CO.LTD
Contents
1. General…………………………………………………………………….. 1
综述
亚麻籽的食用方法2. Technical Parameters………………………………………………………. 1
技术参数
3. Structure Description….………………………………………………….. 1
结构描述
4. Installation and Adjustment………………………………………………. 1
逻辑关系图安装及调节
4.1 Installation of Transmission Device……………………………………. 2
传动装置的安装
4.2 Coplanar Inspection of Belt Pulley…………………………………….. 2
皮带轮的同平面检验
4.3 Adjustment of V-belt Tension…………………………………………. 2
V带拉紧装置的调节
4.4 Tighten of Joint Bolts……………………………………………….. 3
连接螺栓的紧固
4.5 Installing Charging Pump System…………………………………….. 3
安装灌注泵系统优秀广告
5. Installation of other accessories………………………………………….. 3
其他附件的安装
6. About YZ08/ YZ08A DC Motor……………………………………………3
YZ08/ YZ08A个性网个性签名直流电机
1.General毛笔字体设计综述
侧柏叶洗头生发
F1300DB mud pump unitization can be ud in oil and gas exploration and development site. It is ideal equipment for mud circulation of heavy-duty drilling rig.
F1300DB泥浆泵组用于石油天然气勘探开采。是大型钻机泥浆循环的理想设备。
The F1300DB mud pump unitization has features with simple construction, reliable performance, convenient maintenance, compact volume and easy transportation.
F1300DB泥浆泵组操作简单、性能稳定、维护方便、结构紧凑,易于运输。
2. Technical parameters 技术参数
1) V-belt type: 2×4ZV25J+1×5ZV25J
V型带
length: 7620mm
长度
2) Diameter of belt pulley: Φ535/Φ1025mm
皮带轮直径
3) Mud pump type: F-1300 triplex single acting
泥浆泵类型 三缸单作用
铁铲的拼音
rated power 960kW
额定功率
max. diameter of liner Φ180mm
最大缸套直径
max. pressure 30.59Mpa
最大压力
挣脱枷锁strokes per minute 120r/min
每分钟冲数
stroke 308.8mm
冲程
inlet 12" flange
进口 法兰
outlet 5" flange
出口 法兰
4) outside dimensions 8676×3314×3006mm
外形尺寸
5) Weight of mud pump 40000kg
泥浆泵重量
6) DC motor type YZ08 / YZ08A
直流电机类型
7) DC motor power 800kW of each
直流电机功率 每台800KW
3. Structure description 结构描述
F1300DB mud pump unitization consists of F-1300 mud pump, V-belt, DC motor, ba, belt sheave guard, safety valve hydraulic pipeline and electric spray pump system. Two DC motors drive mud pump through V-belt 2×4ZV25J+1×5ZV25J. Ba of DC motors can be adjusted on ba of mud pump for tension of V-belt. On the top of mud pump equipped a cantilever hoist frame for changing of easily worn parts or for repairing of hydraulic end.
F1300DB泥浆泵包括F-1300泥浆泵,V带,直流电机,基座,皮带滑轮护罩,安全阀液压
管线及电动喷淋泵系统。两个直流电机通过V带2×4ZV25J+1×5ZV25J驱动泥浆泵。直流电机基座可根据V带张紧情况进行调节。在泥浆泵顶部配备1个悬臂提升架用来更换易损部件或用来维修液压端。
On both side of mud pump fixed totally enclod V-belt guard.
泥浆泵两端固定有全封闭是V形带护罩。
4. Installations and Adjustment安装与调节
The DC motors and other accessories were took off and parately packed for transport. Ur should refer to drawing to asmble mud pump unitization.
直流电机及其它复件拆卸,独立包装运输。用户应参照图纸安装泥浆泵组。
4.1Installation of transmission device传动装置的安装
The transmission device is main part in the pump unitization. The installing accuracy and adjustment directly influence capability and rvice life of mud pump unitization. Install D
C motors together with their ba on ba of mud pump. Furnish V-belt and pre-tension. Pre-fasten all connecting bolts (slightly fasten, becau some bolts will be loon, taken off or fasten when doing fixation.)
传动装置是泥浆泵组的主要部件。安装精度与校准直接影响泥浆泵组的性能及寿命。直流电机同基座一起安装。配备V形带及预加张力。提前紧固所有的连接螺栓(轻微紧固,因为一些螺栓需要在定位时松动、拆卸或旋紧)
4.2 Coplanar inspection of belt pulley 皮带轮的同平面检验
When the prime motor is repaired or replaced, the belt pulleys need to be adjusted. The adjusting method is that two pieces of thin nylon wires are chon and straightly pulled along one plane of the belt pulleys, one piece of steel wire falls on the center line; the other down. By turning one of the belt pulleys such as belt pulley of motor, if four points contact two pieces of nylon wires, it proves that two belt pulleys have been under alignment. Tension V-belt (read below) and fasten all bolts. Inspect coplanar of belt pulleys again reference above method. If necessary, adjust again. Then all components
must be tightened thoroughly.
当维修或更换原动机时,需要调节皮带轮。调节方式为:选择两条细尼龙线,沿着两个皮带轮的同一端面拉直,1条在中心线上方,1条在中心线下方. 通过旋转1个皮带轮,例如电机皮带轮,如果四个点正好与两条尼龙线接触,则证明两皮带轮校正完毕。拉紧V带并旋紧所有螺栓。参照以上方法再次检查皮带轮共面。必要的情况下,再次进行调节。最后彻底旋紧所有的部件。