验收报告英文
验收报告英文
篇一:
验收报告中英文模板
CHECK REPORT 验收报告
No.: 12CSEMC-HD042 Date: NOV. 01, 201X Plae: Beijing The Buer: 买方:The ller: 卖方
Dealer Reprentative:卖方代表:
THE END-USER: 最终用户:Address: 地址:Tel: Fax: NAME OF COMMODITY: QUANTITY : This is to onfirm that above-mentioned mahines have been
余音绕梁的故事arrived at the end-ur field on 10th of Apr 201X, and also
ertif that the have reeived the instrument in good ondition.
The goods under this ontrat are in onformit ith the
stipulation in ontrat. 本合同标的物数量:
,已于201X年4月10日运抵最终用户所在地,经买方或最终用
户及卖方授权代表联合开箱检验,确认买方收到的产品符合合同约
定,外观无瑕疵,随机附件齐全,买方同意验收。
ACCEPTED BY SELLER: BUYER: ACCEPTED BY ENDUSER: ACCEPTED BY 买方代表(签字):
最终用户(签字):
卖方代表(签字):----------------- ------------------ --
--------------- Authorized Signature梦想英语单词
Authorized Signature Authorized Signature DATE: DATE: DATE: 日期: 日期:
人美逼受罪日期:
篇二:
设备验收报告中英文
设备验收报告
Equipment aeptane report 设备名称Mode ______________________ 使用单位Compan_______________________ 验收负责人Inspetor _______________________ 年月日 Date: 验收报告
Aeptane Report _____________于____年____月____日购买______________的
____________仪器(或设备),价值_________,合同号是
__________。
该设备于____年____月____日到货。经供货方______来校安装调试。
各项指标,均达到合同要求,运行至今,设备一切正常,性能良好,
验收合格。特此说明。
订购单位(盖章)验收
人:年月日
The buer______________purhad mahine_____________from The
ller___________________.And the buer reeived mahine on
date___________.After installation,testing and adjustment,
the buer prove that eah mahine funtion reahed the ontrat
requirements and the performane is good and aeptable. Signature: Date
篇三:
英文版验收报告
HONG KONG JITAI INTERNATIONAL GROUP CO.LIMITED ADD: FLATRM 1005 WING YUE BLDG, 60-64 DES VOEUX RD WEST, HK TEL: +852-******** FAX: +852-******** WE. THE BENEFICIARY, HEREBY CERTIFY THAT THE MACHINE HAS BEEN INSTALLED. AND HAS PASSED THE ACCEPTANCE IN GOOD CONDITION. CONTRACT NO. ------------------- THE END USER -------------------
THE BENEFICIARY ------------------- THE APPLICANT篇
四:
改造项目英文验收报告
THOMSON FOSHAN COLOUR PICTURE TUBE COMPANY EQUIPMENT DEPARTMENT Distribution : Equipment Dept Page 1 of 2 To:生死疲劳
For the attention of the Group Chief Exeutive. Pursuant to Artile 9 and Exhibit 3 of the Suppl and Turn-Ke
Installation of Equipment dated ________99, made beteen
THOMSON FOSHAN and ourlves, the Sstem as toda inspeted b us.
We are satisfied that the Sstem meets the Speifiations and
the aeptane riteria. We aordingl provide ou ith this final test ertifiate in
onfirmation of suh adequa of the Sstem to said Speifiations
riteria. We request that ou ountersign this ertifiate. The terms Sstem and Speifiations have the meaning assigned to
them in the Agreement. Date
d: __________ Countersigned For and on behalf of
短美文
敖丙图片大全For and on behalf of THOMSON FOSHAN CPT Co. Ltd
____________________ _____________________ Page 2 of 2篇五:
模具验收报告单-中英文版
注塑模具制作与验收标准
目的:
为使模具制作及维修作业能降低成本,缩短制造周期,确保模具
寿命,保证产品品质。第 1 页共 2 页
第 2 页共 2 页
人民的名义赵瑞龙附送:
验收申请报告格式
验收申请报告格式
篇一:
关于项目竣工验收申请报告
天津211大学
关于项目竣工验收申请报告
××××(单位名称)
关于×××项目竣工验收申请报告
一、工程完成情况
XX县(乡镇)XX工程由Xx(建设单位)于XX年XX月XX日开工建
设, XX年XX月底全面竣工,历时XX个月,按照批准的设计
年月日
篇二: