CORPORATE COMMON ABBREVIATION
常用语缩写
1 Organization组织           
1-1 HQ Head Quarter 总公司
1-2Chairmen主席
1-3Lite-On Group光宝集团
1-4 President 总裁 国庆节法定节假日是几天
1-5Executive Vice President 常务副总裁
1-6Vice President副总裁
1-7HR Human Resource人力资源部
1-8FIN Finance 财务
1-9Sales 销售
1-10R&D Rearch & Developing 研发部
1-11QA 质量保证 QA DQA CS
1-12MIS Management Information System资讯管理系统
1-13Pur 采购 Purchasing
1-14IMD Image management division 影像管理事业部
1-15ITS information technology system 计算机部
1-16QRA quality reliability assurance 品保部
每逢佳节倍思亲的意思1-17MFG manufacturing 制造部
1-18PMC production &material control 生(产)物(料)管(理)
1-19 PRO Procuremnet 采购开发部
1-20 PMO Plant Manager Office 厂长室
1-21 CEO Chief Executive Officer 执行总裁
自媒体推广
2 Materials 材料           
2-1PC Production Control 生产控制
2-1-1MPS Mass Production Schedule 量产计划
2-1-2FGI Finished goods Inventory 成品存货
2-1-3UTS Units To Stock存货单元
2-1-4WIP Working In Process Inventory在制品
2-1-5C/T Cycle Time 循环时间,瓶颈
2-1-6WD Working Days 工作天
2-1-7MTD Month To Days 月初到今日(例如总表整理)
2-1-8YTD Year To Days 年初到今日
2-1-9 SO Sales Order 销售单
2-1-10MO Manufacture Order 制造单
2-1-11 BTO Build To Order 订单生产
2-1-12 P/N part number 料号
2-1-13 FCST Forecast 预测计划
2-1-14 W/O Working Order 工单
2-1-15 P/O Purchasing Order 采购单
补气血的水果
2-1-16 VDS Vendor Delivery Schedule 厂商送货进度表
2-1-17 D/C Delivery Order 交货单
2-2 MC Material Control材料控制
2-2-1 MRP Material Requisition plan 材料申请计划
2-2-2 INV Inventory 存货清单; Invoice 发票
2-2-3 Inv Turn Over Days=INV$/NSB X WD 库存周转天数
2-2-4 PSI Production Shipping Inventory 预备待出货
2-2-5 JIT Just In Time 实时,准时制、零库存
2-2-6 Safety Inventory 安全存量
2-2-7 CKD Completed Kits Delivery全件组装出货
2-2-8 SKD Semi Kits Delivery半件(小件)组装出货
2-3 W/H Warehou 仓库
2-3-1 Rec Receiving Center 接收中心
2-3-2 Raw MTL 原物料
2-3-3 F/G finish goods 成品
2-3-4 GRN Goods Received Note 货物接收单
2-4 Import/Export进出口
2-4-1 SI Shipping Instruction发货指令
2-4-2 PL Packing List包装清单
2-4-3 Inv Shipping Invoice出货发票
2-4-4 ETD Estimated Time of Departure 预估离开时间
2-4-5 ETA Estimated Time of Arrive 预估到达时间
2-4-6 BL Bill of Landing 提货单(海运)
2-4-7 AWB Air Way Bill 提货单(空运)
2-4-8 MAWA Master Air Way Bill主提货单
2-4-9 HAWB Hou Air Way Bill副提货单
2-4-10 TEU Twenty foot Equipment Unit(Contain)二十英尺货柜
2-4-11 FEU Forty foot Equipment Unit(Contain)四十英尺货柜
2-4-12 CY Container Yard货柜场
2-4-13 THC Terminal Handing Charge 码头费
2-4-14 ORC Original Receiving Charge码头费
2-5 PUR Purchasing采购
2-5-1 FOB Free on Board货运至甲板
2-5-2 CIF Cost Insurance Freight
2-5-3 OA Open Account 开户
2-5-4 TT Telegram Transfer电汇
2-5-5 COD Cash On Delivery 现金支付 菠菜根
2-5-6 CRP Cost Reduction Program降低成本方案
2-5-7 PR Purchasing Requisition采购申请
2-5-8 PO Purchasing Order采购单
2-5-9 LT Lead Time 交期
2-5-10 LLT Long Lead Time 长时间交期
2-5-11 Payment term 付款条件
2-5-12 Debit note 扣款
2-5-13 CRP Cost Reduction Program 降价计划
2-5-14 Quotation 报价
3 MFG Manufacturing Production制造控制     
3-1 DL Director Labor直接人工
3-2 IDL Indirect Labor间接人工
3-3 DLH Direct Labor Hours直接工时
3-4 Productivity=UTS/DLH
3-5 PPH Pieces Per Hour每小时件数
3-6 Efficiency=Actual/Target(%)
3-7 DT Machine Down Time停机时间
3-8 AI Auto Inrtion自动插入
3-9 MI Manual Inrtion人工插入
3-10 SMD Surface Mount Device表面粘着零件
SMT Surface mount technology 表面粘着技术
3-11 B/I Burn In (for how many hours at how many degree)烧机
3-12 Equipment Utilization
3-13 WI work instruction 工作说明
3-14 SOP standard operation procedure作业指导书
3-15 R/I run in 运转机器
3-16 ESD electrical static discharge 静电释放
3-17 MP mass production 量产
3-18 EMC Electro Magnetic Compatibility, 电磁兼容性
3-19 EMI Electro Magnetic Interference, 电磁干扰
3-19 SIR Surface Impedance Resistance 表面阻抗测试
4 Engineer工程           
4-1 PE Products Engineer; 产品工程Process engineer制程工程
4-2 TE Test Engineer测试工程 善良反义词
4-3 ME Manufacturing Engineer;制造工程 Mechanical Engineer机械工程
4-4 IE Industrial Engineer工业工程
4-5 DCC Document Control Center文管中心
4-6 BOM Bill Of Material材料清单
4-7 ECN Engineering Change Notice工程变动公告
4-8 TECN Temporary Engineering Change Notice工程临时变动公告
4-9 ATY Asmbly Test Yield Total Yield直通率
4-10 TPM Total Productivity Maintenance全面生产维护
4-11 PM product manager ;project manager 产品经理;项目经理
中国大贪官
4-12 ECR engineering change request 工程变更申请
4-13 ECO engineering change order 工程变更指令

本文发布于:2023-07-17 00:26:15,感谢您对本站的认可!

本文链接:https://www.wtabcd.cn/fanwen/fan/89/1084388.html

版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。

上一篇:品质术语
下一篇:PCBA常用术语
标签:工程   时间   出货   计划
相关文章
留言与评论(共有 0 条评论)
   
验证码:
推荐文章
排行榜
Copyright ©2019-2022 Comsenz Inc.Powered by © 专利检索| 网站地图