Product/Process Quality Plan for Shark PDU
Revision: P01
Updated Relead by: Kacy Huang
Approved By:
PQ APAC Quality Manager:
Terry Wei &David Duan
PQ APAC Project Manager:
Tim Liu
Eaton Quality Manager:
Eaton Project Manager:
Revision History
REV | Date | Description | By |
P00 | 15th Oct -2013 | First version | Kacy Huang |
P01 | 23th Apr-2014 | Change list: Modify quality Goals according to the factory Goal. | Kacy Huang |
| | | |
| | | |
| | | |
| | | |
| | | |
| | 椒麻牛肉 | |
| | | |
| | | |
画画大全图片 | | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
| | | |
Contents
Product/Process Quality Plan for Shark PDU 1
Revision History 2
Contents 3
1.0 Quality Statement 5
2.0 Scope 5
3.0 Purpo 5
4.0 Definitions 5
5.0 Project Total Quality Goals 6
5.1 Shark ePDU Internal Quality Goals 6
5.2 Continuous Improvement 7
6.0 Verification of Compliance to Requirements 7
6.1 Design Process Requirements 7
6.1.1 DFMEA 7
6.1.2 Special Product Characteristics 8
6.1.3 Design Verification Tests 8
6.1.4 Validation Tests 8
6.1.5 Reliability 8
6.1.6 Agency Approval 9
6.1.7 Production Test Plans 9
6.1.8 JIRA/FRACAS 9
6.1.9 Design documentation 9
6.2 Supply Chain Activities 10
6.2.1. Supplier Quality Management Plan 10
6.2.2. Critical components’ PPAP/FAI 10
6.2.3. Receiving Inspection 10
6.3 Manufacturing Process Verification Requirements 10
6.3.1 PFMEA 10
6.3.2 Special Process Characteristics 10
6.3.3 Fault Inrtion Plan 11
6.3.4 Error Proofing Plan 11
毛尖属于什么茶6.3.5 Control Plan 11
6.3.6 Firmware and test procedure version control 11
6.3.7 Training 11
6.3.8 Manufacturing Process Standardized Work 12
6.3.9 Equipment Maintenance and Calibration 12
6.3.10 Out of Box Audit 12
6.3.11 Nonconforming Materials Control 12
6.3.12 Shipping Sample FAI 12
6.3.13 Data Collection and Reporting 13
6.4 Change Control 13
6.4.1 Engineering Change Control 13
6.4.2 Change Notification 13
6.5 Other Requirements 13
6.5.1 Serialization Codes 13
6.5.2 Stop Shipment 14
6.5.3 Special Control Notification 14
6.5.4 First Customer Authorization – Sign off 14
6.5.5 Width dimension measurement 14
APPENDIX A 15
1.0 Quality Statement
Shark e祝福高考PDU will be developed and manufactured in accordance with Product Performance Specifications and ISO9001:2008 requirements. The relea is created by
PQ APAC.
伯益
EATON-US will make the final acceptance of the product and PQ APAC Quality has the responsibility to control this document.
2.0 Scope
This plan defines the requirements and process ud for the development and production relea of Shark ePDU, any standard version of this system, and all related accessories and support elements.
3.0 Purpo
All of the Shark ePDU will be developed and manufactured with the methods and strategy to be implemented to ensure Quality.
4.0 Definitions
AFR -Annual Failure Rate
ATE -Automated Test Equipment
CEM -Contract Electronic Manufacturer
CP -Control Plan
DFMEA -Design Potential Failure Mode and Effects Analysis
ECN -Engineering Change Notice
ECR -Engineering Change Request
EMC -Electro Magnetic Com毫的组词patibility
EP -Engineering Prototype
ESD -Electrostatic Discharge
FAI -First Article Inspection
FCS -First Customer Ship
麦当劳创始人黄酒酿造技术FP -Functional Prototype
FRACAS -Failure Reporting, Analysis and Corrective Action System
GR&R -Gauge Repeatability and Reproducibility