新产品开发流程(New product development process)
New product development process
Development process principles:
1) APQP 2) project management
1 project planning form is not controlled
1.1, define customer requirements (mainly quality and product development information), customer project letter
1., customer information table content, issued by GCM to CQS, and then confirmed by CQS after filling, request to RD.
2. the form is filled out by GCM, confirmed by CQS and approved by RD department head
理想什么意思3. customer's new product information will be nt to RD. via e-mail
Customer drawings, customer samples, GCM
Customer engineering standards and specifications RD
1.2 project planning
1.2.1 project planning is to define the direction of product development, define quality standards, new product planning, RD, general manager
RD in charge of concept planning and asssment (including customer demand), confirm the development issues and requirements. Completed by the head of RD, the general manager for approval of new product planning review,.RD responsible for the audit, approved by the general manager. After RD supervisor.RD responsible for approval. "The new product planning book" need to be controlled.
1.2.2 evaluate the company's development and production capacity, new product development resource asssment form, RD supervisor, CQS, PE/QA, GCM
1., mainly fixed equipment and human resources, time requirements. Documents to be controlled
2.RD complete the relevant unit audit, RD responsible person approval. Form controlled
1.2.3 appearance design, product appearance, ID, ID designer, customer confirmation or ID supervisor audit, general manager approval有情天地
The 1.2.4 appearance confirms that after updating the product appearance, the general manager of RD GCM/, the general manager should confirm
新疆高考成绩2. project entry
大境阁2.1 project input, implement specific product development information, "new product planning form", RD supervisor, project team member
山东泰山1., the specific content of the form, documents to be controlled, and should be issued to participate in the Department, to participate in department heads to review and confirm the participants
2. the form is completed by the head of the project team, reviewed by the relevant units and approved by the RD officer. The form is controlled
2.2 develop project detailed plan, project schedule, project leader
1. information informs members of the project team. The document is controlled
网络电信诈骗
终南望余雪古诗
2. the document is completed by the project leader, approved by the project team supervisor and approved by the RD controller. The form is controlled
3. product design and development
3.1 product design
3.1.1 evaluates product design risks and preventive actions. The RD document is completed by the engineer, who is responsible for the review and approved by the RD officer in charge of the DFMEA
3.1.2 engineering drawings, asmbly drawings, documents are completed by the engineer, the supervisor is responsible for
the review and approval by the RD manager or above. The form is controlled
3.1.3 and verify the design of the structure and function of the manual model 1. look at the actual requirements to determine whether to do.2.RD for confirmation before they can be nt outside the.3. price RD responsible to the approval of.
4. model for acceptance, prervation.
3.1.3 produces product design documents, product manuals, RD engineers, complete documentation, supervisor audits, RD manager level approval, and product list forms are controlled
3.1.4 packaging design "packaging design documents" PD look at the actual situation to determine
Three
2 design review
3.2.1 parts review "parts review form" MPS (RD) in the last meeting with the MPS requirements, issued by the electronic file of the time, the review time of 3 days, at the same time to nd a written document. At the same time to provide the spare parts demand standard. At the same time to provide relevant documents, review staff to sign the name, responsible person confirm.
3.2.2 new product design review, new product design review form, RD Technical Committee, project team 1. review drawings, models, documents, documents to be controlled
2. reviewers are required to sign and approve by the.RD officer. The form is controlled
3.3 make PPAP demand "product needs PPAP (PRF) 1." project leader is responsible for the project
under.2. this document applies to construction project.3. file by the person responsible for the project drafting documents approved by the competent authority.
3.4 demand for outgoing parts
3.4.1 new parts "parts PPAP demand (PRF) RD QE 1." by the person responsible for the project under.2. this file and application in construction projects and construction projects have been built, in the project by RD, QE audit, RD approved.3. except MPS supplier PRF with stable again. Parts "RD controlled drawings" "die out" list of controlled forms
法医鉴定3.4.2 old parts demand "requisition" RD stock eligible recipients, not qualified to re submit to the requirements of the original design standard. "Parts demand information table"
4. process design and development
4.1, the production process design "process flow chart"
PE 1. includes feeding, asmbly, and packaging of the entire production process, specifically depending on the actual requirements, and can be completed before BOM