完整版)工程客户满意度调查分析表
Engineering XXX
Number:
n Unit:
日本代购淘宝
Project Name:
XXX:
n Level:
Very Satisfied。Satisfied。Average。Dissatisfied。Very Dissatisfied春秋战国的分界线
70 and below
Sequence:
1.Timeliness and accuracy of XXX
XXX with the progress plan
XXX sufficient
Whether the key process control during XXX
2.Handling of problems after the fact
黄玫瑰的花语是什么意思Quality of sub-projects
Safety and civilized measures and pre-control plans
XXX work measures
3.n of capabilities
XXX
XXX
XXX
4.Engineering usage XXX
5.XXX
6.Post-XXX
7.XXX
XXX:
Customer reprentative: (Ur al) Disposal and reply status:
XXX:
Project:
Investigator: Date:
XXX
n Unit:
Project Name:良禽择木而妻
XXX:
n Level:
90 and above
85 and above
80 and above
75 and below
70 and below
Sequence:
1.Engineering usage XXX
2.XXX
3.Post-XXX
大班表演游戏
4.XXX
XXX:
Customer (Supervisor) reprentative: (Ur al) Investigator: Date:
Engineering XXX
XXX: Date
XXX): XXX):
Secondary Indicators
Customer XXX
Tertiary Indicators
Overall
Quaternary Indicators
XXX/rvice quality (including quality standards。rvice methods。etc.) XXX when compared to what was hoped for.
Very Satisfied。Satisfied。Average。Dissatisfied。Very Dissatisfied
n documents (including ns。n approval。n n design。special technical schemes。etc.) XXX.
XXX。scientific。safe。XXX.留学e网
XXX controlled according to the plan and XXX.
XXX.
XXX the technical data。such as n (n) drawings。XXX.
XXX after the project is put into n according to XXX.
怦怦直跳的意思
待我长发齐腰
XXX contract price agreed upon by the customer.
Whether the price or cost is reasonable compared to the same or different industries under the same quality ns.
XXX.
Comparison of n/rvice quality with the us year (or the same industry).
XXX n site is safe。civilized。clean。and orderly。with no barbaric n phenomena。and no n (noi) to the surrounding environment.