Clean Development Mechanism South Africa
Designated National Authority
Private Bag X 19 , Acardia ,Pretoria, 0007, Tel:012-444 4116, Fax: 012 341 5133 Private Bag X9111, Cape Town, 8000, Tel: 021-469 6412, Fax: 021-465 5980 Project Design Document (PDD)
Part B:Project Overview (Technical Summary, Location and
CH4– due to reduction of landfill gas emissions (flaring and/or electricity production)
CO2– due to displacement of grid electricity
参照公务员管理Assuming 5 large landfills with an average of 80,000 tCO/y and 10
The coordinating entity will implement a verification system on the PoA level to determine the GHG abatement created by the PoA as a whole. The resulting programme databa includes the data ts that can be directly attributed to each CPA within the PoA. Thereby it allows for unambiguous determination of the emission reductions achieved by each CPA. Monitoring reports will be prepared parately for each of the CPAs for the purpo of verification and request for issuance of CERs.
The propod PoA and CPAs will apply the approved large scale methodology ACM0001 “Consolidated baline and monitoring methodology for landfill gas projects activities” (Version 11).
金屋藏娇的故事与哪一位皇帝有关The following parameters will be monitored (this list may vary depending on specific CPA):
乐字的成语LFG total,y - Total amount of landfill gas captured at Normal
Temperature and Pressure;
LFG flare,y- Amount of landfill gas flared at Normal
用不但而且造句Temperature and Pressure;
LFG electricity,y- Amount of landfill gas combusted in
杜月笙经典名言
power plant at Normal Temperature and Pressure;
w CH4 - Methane fraction in the landfill gas;
T flare - Temperature in the exhaust gas of the flare
T - Temperature of the landfill gas;
P - Pressure of the landfill gas;
EL LFG - Net amount of electricity generated using LFG;
EC PJ,j,y - Quantity of electricity consumed by the project
electricity consumption source j in year y
羽毛球场馆
EF fuel,BL - CO2 emission factor of fossil fuel;
NCV fuel,BL - Net calorific value of fossil fuel;
ɛgen,BL - Efficiency of the baline captive power plant;dnf申诉
Operating time of the power plant;
PE EC,y- Project emissions from electricity consumption by
the project activity during the year y;
PE FC,j,y - Project emissions from fossil fuel combustion in
赤小豆功效process j during the year y;
TDL j,y - Average technical transmission and distribution
loss for providing electricity to source j in year y Identify which type of activity is involved in this project – and for