产品研发合同-英文版
爱情的甜蜜
| Classification: Final Draft | Date: 2012-11 |
Project Name: Packer rubber for staged fracturing tool | Specification No: |
Internal Order No:
| 胆红素过高怎么办 Client: | Revid No: |
| | |
GENERAL CONTRACT BETWEEN AND OF THE PACKER RUBBER FOR STAGED FRACTURING TOOL IN ALBERT CANADA BY UNIVERSITY OF ALBERTA |
Prepared By: 盆腔炎的症状有哪些 | Sheet |
| |
GENERAL CONTRACT BETWEEN AND UNIVERSITY OF ALBERTA OF THE PACKER RUBBER FOR STAGED FRACTURING TOOL
Introduction
Accompanying with the fast growing of fracturing operation in petroleum industry in China, the usage of the staged fracturing tools will be expanded markedly.
By the invitation of Prof. Gu, University of Alberta (shall mean the Party B) will help Poly-Doctor Petroleum Technology Co. Ltd. Beijing (shall mean the Party A) to develop a packer rubber for staged fracturing tool. The site of the packer rubber manufacturing plant is lected in Alberta.
(More information plea is noticed in the attachment of the Proposal of the packer rubber production line for staged fracturing tool in Alberta, Canada. Internal Order No: UAlberta-2012-11)
Parties in this Contract
烤大虾的做法Entrusting Party (Party A):
Entrusted Party (Party B): University of Alberta
116 St, 85 Ave
Edmonton, AB
Canada
T6G 2R3三伏
Articles of Rights and Obligations of two Parties
The following articles have been discusd and agreed upon between Party A (stands for …) and Party B (东林大佛简介stands for 什么时候开学University of Alberta):
The scope of supply for this Contract is Party B helps Party A to build a packer rub
ber for staged fracturing tool (required technical specification is attached盐酸雷尼替丁胶囊 in the technical index).Party A entrusts Party B to rearch and develop technique proposal of a packer rubber for staged fracturing tool. The following articles are reached and abided by the both parties.
Article 1: Definitions
1.1 Technique proposal of a packer rubber for staged fracturing tool (hereinafter referred to as “the Solution”) shall mean all the required techniques to construct the general idea which will commit the attached technical index requirements in attachment. The Solution shall include all technical details of all designing schemes and experimental verification for key parameters.