This Statement of Work (SOW) is made as of [Date] by and between XXXXXXXX, a Swiss corporation with its principal place of business at XXXXX, XXXX, USA (“Customer”) and XXXXXXXX., a PRC corporation with its principal place of business located at XXXXXXXXXXX, China (“Supplier”).
This SOW will be deemed as an appendix to the Manufacturing and Sales Agreement (“Agreement”) signed by and between冬天作文结尾
Customer and Supplier on [Date]. Except as specifically stated herein, all terms ud in this SOW will have the same meaning as in the Agreement.
Supplier shall carefully read and consider the requirements described in this SOW. Supplier’s award BOM shall list out all its assumptions including the design assumption for any uncertain or unclear area of the requirements or in Section Risk and Contingency plan.
Supplier’s quotation dated [ ... ] will be deemed as a commitment to Customer and shall have covered all requirements under the requirements listed in this SOW. Supplier may not unilaterally increa any cost amount or cost item or add on any other additional conditions or assumptions after submitting its quotation to Customer, unless Customer changes the specifications or there are other new requirements for the project after Supplier submitted its quotation. In ca of any such change made by Customer, both parties shall negotiate the reasonable cost increa or reduction in good faith. Supplier agrees to work together to improve the material cost.
Statement Of Work
(Sample)
ASAP MTM OST ORT BOM PA CAR PB CF PCB CMF PCBA DFA PE DFM PL DFU PM DVT PQA EA QA EF RFQ EE RTP
EUT EVT
3. Glossary / Acronyms
Engineering design Freeze review Request for Quotation Electrical Engineering As Soon As Possible Mfg Technical Manager Optical & Sensing Team Ongoing Reliability Testing Bill of Materials
Pilot Asmbly Corrective Action Report
CONTRACTOR INFORMATION:Supplier Name:
Coordinator/Contact Name:Contact Phone:Cellphone: /Tel:
E-Mail Address: / Email:
CUSTOMER CONTACT INFORMATION:Coordinator/Contact Name:Contact Phone:E-mail:
Contact Name:Contact Phone:Email:
Design for Manufacturability Project Leader End-Ur Testing
Device Firmware Upgrade Program Manager
Design Verification Test
Product Quality Assurance Engineering Architecture review Quality Assurance Pilot Build
Critical to Function dimension Printed Circuit Board
Color Material Finish Printed Circuit Board Asmbly Design for Asmbly
Production Engineer Reliability Test Plan Engineering Verification Test
and so on……
1)2)3)4)
#5. Purpo of Statement of Work
6. Risk and Contingency Plan
4. Project Team
James B
Manufacturing Manager
SVC
Customer Team
Name Fuction
Site Notes
Supplier Team
Name
Fuction
Site
Notes
Known or Potential Risk Owner Name
Plan to Address Risk To define roles and responsibilities, key deliverables, timeline and escalation paths for the XXXXXXXXXXX To allow Customer's Key Stakeholders to collaborate with the Key Stakeholders at Supplier To allow Customer Team and Supplier socialize data on a regular basis To refine Risk and Contingency Planning
This table should be ud to highlight high level design or development gaps that will impact the final product. This table does not replace the more detailed risk table, ud by project teams.
123456
7. Escalation and Resolution Plan
8. Services and Deliverables
剪纸图片简单的又漂亮
Resource Risk
Need careful management of resources and
bottleneck at Supplier as projects running in parallel to XXX
General schedule risk
Need pragmatic planning from Supplier,Need to stagger tool open to relea parts as soon as they are ready
General escalation and resolution plan to address issues as they ari.
Customer Contact
Supplier Contact
Fuction
Issue & Escalation Level
James Xiaoming Wang
PM All.
With this SOW, the Supplier will perform certain rvices and create certain deliverables for Customer. Customer will provide technical reviews and guidance as needed during the Supplier’s design process.Deliverables include designs produced for this SOW.
Supplier is required to disclo the related technical documents such as 3D CAD files to Customer.
Customer is sole property and IP owner of all deliverables and has the right to have designs and technical documents transferred to other suppliers for manufacture.
Smith
森林报冬读后感EE
Electrical issues
#
1234
1234
#
1234
1234
免费试卷网
9. Equipment, Tools, and Programming - Customer
8.1 Description of Services Description of Services笔记本电脑英文
PM Activities
聪明女人Owner凯里
Due Date
Description of Deliverables
PM Deliverables
Owner
Due Date
8.2 Description of Deliverables EE / CAD Activities -Done Owner
Due Date
EE Deliverables -Done Owner