Test Report issued under the responsibility of: | ||||
TEST REPORT 忆江南江南好IEC 61960-3 Secondary cells and batteries containing alkaline or other non-acid electrolytes – Secondary lithium cells and batteries for portable applications –Part 3: Prismatic and cylindrical lithium condary cells, and batteries made from them | ||||
Report Number. : | ||||
Date of issue : | ||||
累的句子说说心情Total number of pages : | ||||
Name of Testing Laboratory preparing the Report : | ||||
Applicant’s name : | ||||
Address : | ||||
Test specification: | ||||
Standard : | IEC 61960-3: 2017 | |||
怎么煮毛豆 Test procedure : | CB Scheme | |||
Non-standard test method : | N/A | |||
工程总结 Test Report Form No. : | IEC61960_3A | |||
Test Report Form(s) Originator : | DEKRA | |||
感冒驱寒姜汤的做法Master TRF : | Dated 2017-11-28 | |||
Copyright © 2017 IEC System of Conformity Asssment Schemes for Electrotechnical Equipment and Components (IECEE System). All rights rerved. This publication may be reproduced in whole or in part for non-commercial purpos as long as the IECEE is acknowledged as copyright owner and source of the material. IECEE takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context. If this Test Report Form is ud by non-IECEE members, the IECEE/IEC logo and the reference to the CB Scheme procedure shall be removed. This report is not valid as a CB Test Report unless signed by an approved CB Testing Laboratory and appended to a CB Test Certificate issued by an NCB in accordance with IECEE 02. | ||||
General disclaimer: | ||||
The test results prented in this report relate only to the object tested. This report shall not be reproduced, except in full, without the written approval of the Issuing CB Testing Laboratory. The authenticity of this Test Report and its contents can be verified by contacting the NCB, responsible for this Test Report. | ||||
Test item description : | ||||
Trade Mark : | ||||
Manufacturer : | ||||
Model/Type reference : | ||||
Ratings : | ||||
Responsible Testing Laboratory (as applicable), testing procedure and testing location(s): | ||||
CB Testing Laboratory: | ||||
Testing location/ address : | ||||
Tested by (name, function, signature) : | ||||
Approved by (name, function, signature) : | ||||
Testing procedure: CTF Stage 1: 王新法 | ||||
Testing location/ address : | ||||
Tested by (name, function, signature) : | ||||
Approved by (name, function, signature) : | ||||
Testing procedure: CTF Stage 2: | ||||
Testing location/ address : | ||||
Tested by (name + signature) : | ||||
Witnesd by (name, function, signature) : | ||||
Approved by (name, function, signature) : | ||||
Testing procedure: CTF Stage 3: | ||||
Testing procedure: CTF Stage 4: | ||||
Testing location/ address : | ||||
Tested by (name, function, signature) : | ||||
Witnesd by (name, function, signature) : | ||||
Approved by (name, function, signature) : | ||||
Supervid by (name, function, signature) : | ||||
List of Attachments (including a total number of pages in each attachment): | |
Summary of testing: | |
Tests performed (name of test and test clau): | Testing location: |
Summary of compliance with National Differences (List of countries addresd): The product fulfils the requirements of _________ (inrt standard number and edition and delete the text in parenthesis, leave it blank or delete the whole ntence, if not applicable) | |
Copy of marking plate: The artwork below may be only a draft. The u of certification marks on a product must be authorized by the respective NCBs that own the marks. |
本文发布于:2023-06-29 04:38:59,感谢您对本站的认可!
本文链接:https://www.wtabcd.cn/fanwen/fan/89/1059652.html
版权声明:本站内容均来自互联网,仅供演示用,请勿用于商业和其他非法用途。如果侵犯了您的权益请与我们联系,我们将在24小时内删除。
留言与评论(共有 0 条评论) |