PERSONNEL LIFTS | YES | NO | COMMENTS | |
1. | Are only trained and authorized workers permitted to operate personnel lifts? | |||
2. | Is the documentation of authorized workers training available? | 团队励志语录 | ||
3. | Are each personnel lift inspected, maintained, and repaired in accordance with the manufacturer's operating and maintenance manual and relevant standard? | |||
4. | Is the personnel lift inspection log readily available? | |||
5. | Is each personnel lift supplied with an operator's manual, safety procedures, maintenance, and repair requirements? | |||
6. | Are controls clearly marked, easily understood, and guarded against accidental activation? | |||
7. | Are the manufacturer's operating instructions for all personnel lifts permanently affixed to the personnel lift in a conspicuous location, well protected from the weather? | |||
8. | Is the rated capacity for each man lift conspicuously displayed? | |||
9. | Does the personnel lift have both primary and condary controls? (Primary controls are ud by the operator in the basket. Secondary controls are accessible from ground level). | |||
10. | Are all personnel lifts equipped with emergency stop devices? Are emergency stop devices readily accessible to the operator? | |||
PERSONNEL LIFTS | YES | NO | COMMENTS | |
11. | Is the personnel lift equipped with an alarm or other warning device that automatically activates when the machine ba is more than 5 degrees out of level in any direction? | |||
12. | Is the hydraulic or pneumatic asmbly designed to prevent free descent in the event of a sudden loss of hydraulic or pneumatic pressure? | 致敬英雄演讲稿 | ||
13. | Does the personnel lift have skid and slip resistant working surfaces? | |||
14. | Does the access gate swing inward? Is it lf-closing? | |||
15. | Is the access gate equipped with restraining devices to prevent accidentally opening? | |||
16. | Is the personnel lift guardrail t 42 inches? | |||
17. | Are workers prevented from standing on mid-rails and reaching from the personnel lift? | |||
框支剪力墙18. | Are parate anchorage points provided for the number of people who may safely occupy the personnel lift? | |||
19. | Is the anchorage point location and lanyard designed to keep the free-fall distance as short as possible? | |||
20. | Are workers required to u full body harness with shock absorbing lanyards at all times? | |||
21. | Is the aerial lift being operated near energized electrical lines? | |||
22. | Are there any over head hazards (steel erection, overhead crane)? | |||
23. | Are personnel lifts with outriggers capable of preventing retraction with a sudden loss of hydraulic or pneumatic pressure? | |||
24. | Are the personnel lift outriggers designed to ensure that the personnel lift basket cannot be raid unless the outriggers are properly t? | |||
PERSONNEL HOIST RIDING SYSTEM | YES | NO | COMMENTS | |
25. | Have all workers read and understood all instructions and labels regarding installation, u, inspection and maintenance of hoist systems they will u? | |||
26. | Has a competent person other than the ur inspected each personnel-riding device within the previous year and determined that is in good working order? | 砂锅炖 | ||
27. | Have all components of the personnel- riding system been inspected prior to rigging and u at the installation site? | |||
28. | Are procedures and equipment in place for rescue and evacuation of all personnel using a personnel-riding system? | |||